IT JUST SOE HAPPENS... We intentionally spelled that incorrectly. We also intentionally help our clients save time and money by using IDEAL High Capacity Helical Pipe Piles for SOE applications. For this project in the Bronx, the IDEAL Design Team recommended a 12.75 " x .500 " W.T. helical pipe pile with a 22 " x .75 " helix as an alternate to drilling, dropping, and grouting, H-Piles. A total of 18 helical pipe piles were installed over 2 days. Each pile section consisted of an 18' lead which was installed to grade using a Digga MD190 hydraulic drive head. Using helical pipe piles saved time and money as there was no need for pre-drilling (no spoils) or post-grouting. To learn more about how we can help you save time and money with this IDEAL solution, give us a call at 585-872-7190. https://bit.ly/DFISOEBhttps://www.bit.ly/DFISOEB