Ph oto To ur PROJECT DETAILS Project: AdventHealth Cancer Institute Location: Merriam, Kan. Completion date: March 2024 Owner: Shawnee Mission Medical Center Inc. Total building area: 70,300 sq. ft. ABOVE: The MRI therapy room is outfitted with LED lights to enable the patient to choose from a variety of colorful lighting options during a procedure. RIGHT: The cancer institute houses semiprivate infusion bays with views to the outdoors and the landscaped rooftop patio. Dividers between the bays feature wood and natural stone accents, curved shapes, and translucent panels to allow natural light into the space. Total construction cost: $44.8 million Cost/sq. ft.: $637 Architecture fi rm: Hoefer Welker Interior design fi rm: Hoefer Welker General contractor: JE Dunn Engineers: Bob D Campbell (structural), Renaissance Infrastructure Consulting (civil/landscape), FSC Inc. (life safety), Hoefer Welker (plumbing and engineering oversight), Professional Service Industries Inc. (geotechnical engineering services) Builder: JE Dunn Project details are provided by the design team and not vetted by Healthcare Design. 12 MARCH 2025 HCDMAGAZINE.COM BOB GREENSPAN PHOTOGRAPHYhttp://www.HCDMAGAZINE.COM