Maintenance and Reliability
* Step 1: Identify obsolescence and proactively implement
risk mitigation strategies to improve reliability. The
identification of potentially obsolete equipment
should be carried out through various tools such as a
root cause analysis report, a recurring failure report, a
report on the plant's mechanical integrity, a corrosion
and inspection report, and various safety audit reports
published as a part of internal management's practice
for a manufacturing unit. These reports will expose
the obsolete production equipment, as well as those
underperforming because of a lack of OEM support.
Even a substantial increase in equipment maintenance
cost will be brought under the scope as spares and service
contracts for obsolete equipment become high.
* Step 2: The engineering team must assess the extent and
scope for all potential obsolete equipment as identified
in Step 1. It may be the entire piece of equipment or a
component of the equipment that becomes obsolete.
The most common partial obsolescence cases are
the components of a system where the sub-supplied
items become obsolete more quickly than the original
equipment, which may still be in the production phase.
* Step 3: In the case of partial obsolescence, a technical
discussion must be conducted with alternative suppliers
who can provide the same obsolete components
compatible with the original equipment. This may
provide assurance for the continued functioning of the
equipment without any stoppage due to obsolescence.
For example, the third-party interfacing unit or the
human-machine interface unit of a process control
system can be developed for outsourcing from alternative
vendors in case of obsolescence. This may prevent the
revamp of the control system.
* Step 4: The lifecycle strategy must be worked out for all
identified critical obsolete equipment so that a 5-yr plan
for equipment upgrades may be developed. The following
data must be collected before developing an equipment
lifecycle plan:
° Equipment criticality (HSE/production)
° Equipment installation base
° Time of obsolescence declared by OEM
° Extent of spares/service support available by OEM
for obsolete equipment and the time frame till
the OEM continues support
° Available spares
° Rate of consumption of spares
° Failure rate of the equipment.
* Step 5: Assess the expected obsolescence phase based
on the lifecycle strategy. Decide on whether a complete
or partial upgrade will be executed and identify the
proposed phasing of the upgrade. A product might be
declared obsolete by the OEM, but the end user may opt
for a staggered action plan depending on the respective
phase of obsolescence. The obsolescence phase is
determined based on the lifecycle plan of the equipment.
* Step 6: Work out the mitigation plan for the impact
created due to no available alternatives. In that case,
the process design might need to be changed to
accommodate the absence of alternatives until the
50B NOVEMBER 2022 | HydrocarbonProcessing.com
revamp/upgrade of the system is implemented.
* Step 7: Conduct the cost-benefit analysis of spares/
service support and decide whether to stock up on
spares/service support or look for an immediate upgrade.
* Step 8: Have a technical discussion with the OEM to
evaluate alternatives with assorted options for required
changes/upgrades. The upgrades may contain enhanced
features that enable the equipment to function more
efficiently, and the enhanced features are to be weighed
while evaluating the main equipment function.
* Step 9: Conduct a techno-commercial assessment and
negotiate with suppliers to evaluate various upgrade options.
* Step 10: Decide whether a complete or a partial
upgrade will be executed and identify the proposed
phasing of the upgrade.
* Step 11: Define the specification sheet for the
new equipment.
* Step 12: Develop preliminary upgradation budget
requirements based on the identified obsolete equipment
and evaluate alternatives.
* Step 13: Compare the preliminary budgetary
requirements with guidelines from the annual planning
process (in terms of allocation) and evaluate overall
maintenance/shutdown schedules to determine schedules.
* Step 14: Prioritize budgetary requirements and define
the upgradation timeline for each obsolete equipment.
In case of deferral, work out additional alternative
strategies for obsolete pieces of equipment.
* Step 15: Obtain management approval for the
upgradation budget.
* Step 16: The progress and efficacy of the obsolescence
management program must be monitored periodically.
The following suggested key performance index can
be followed:
° The frequency of production outages or HSE
incidences due to obsolete equipment
° The ratio of obsolete inventory and total inventory
° The ratio of equipment covered under the obsolescence
management program and the equipment in which
potential obsolescence is identified
° The amount of equipment with an obsolescence plan.
Obsolescence phases. The phases of obsolescence include
the following:
* Phase 1: Upgradation within 1 yr
* Phase 2: Upgradation within 2 yr
* Phase 3: Upgradation within 3 yr
* Phase 4: Upgradation within 5 yr.
The process for obsolescence management may be adopted
in different versions. However, before obsolescence issues become
a critical problem, forcing emergency decisions, obsolescence
must be addressed at an appropriate time to develop a
mitigation plan accordingly.
RANJAN BHATTACHARYA has more than 35 yr of experience
in the hydrocarbon industry as a Lead Instrumentation
Engineer. Bhattacharya has worked with major hydrocarbon
manufacturers like Reliance Industries Ltd. and Haldia
Petrochemicals Ltd. His experience is spread over maintenance,
project engineering and training.
https://www.HydrocarbonProcessing.com

Hydrocarbon Processing - November 2022

Table of Contents for the Digital Edition of Hydrocarbon Processing - November 2022

Industry Perspectives
Editorial Comment
Construction
Innovations
Digital Technologies
Optimization of ethylene in the processing of hydrocarbons
Shift focus to more open control technology
Integrated remote operations drive collaboration and autonomy
Reliability analysis of analyzers bridges the gap between assessing and addressing risk
Implement advanced level control techniques to improve crude distillation unit stabilizer performance
Leading capital projects in a VUCA environment
Trip your turbine troubles: Optimize the reliability of steam-driven turbines
Development of novel epoxy closed-cell foam for personnel and corrosion protection—Part 2
Obsolescence management in a manufacturing unit
Decarbonizing your fired heaters with hydrogen fuel
Mechanical design challenges in high-temperature electric heaters
Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 2
Advertiser Index
Hydrocarbon Processing - November 2022 - 1
Hydrocarbon Processing - November 2022 - 2
Hydrocarbon Processing - November 2022 - 3
Hydrocarbon Processing - November 2022 - Industry Perspectives
Hydrocarbon Processing - November 2022 - 5
Hydrocarbon Processing - November 2022 - 6
Hydrocarbon Processing - November 2022 - Editorial Comment
Hydrocarbon Processing - November 2022 - 8
Hydrocarbon Processing - November 2022 - 9
Hydrocarbon Processing - November 2022 - Construction
Hydrocarbon Processing - November 2022 - 11
Hydrocarbon Processing - November 2022 - Innovations
Hydrocarbon Processing - November 2022 - 11B
Hydrocarbon Processing - November 2022 - 12
Hydrocarbon Processing - November 2022 - Digital Technologies
Hydrocarbon Processing - November 2022 - 14
Hydrocarbon Processing - November 2022 - 15
Hydrocarbon Processing - November 2022 - 16
Hydrocarbon Processing - November 2022 - Optimization of ethylene in the processing of hydrocarbons
Hydrocarbon Processing - November 2022 - 18
Hydrocarbon Processing - November 2022 - 19
Hydrocarbon Processing - November 2022 - 20
Hydrocarbon Processing - November 2022 - Shift focus to more open control technology
Hydrocarbon Processing - November 2022 - 22
Hydrocarbon Processing - November 2022 - 23
Hydrocarbon Processing - November 2022 - 24
Hydrocarbon Processing - November 2022 - Integrated remote operations drive collaboration and autonomy
Hydrocarbon Processing - November 2022 - 26
Hydrocarbon Processing - November 2022 - 27
Hydrocarbon Processing - November 2022 - 28
Hydrocarbon Processing - November 2022 - 29
Hydrocarbon Processing - November 2022 - 30
Hydrocarbon Processing - November 2022 - Reliability analysis of analyzers bridges the gap between assessing and addressing risk
Hydrocarbon Processing - November 2022 - 32
Hydrocarbon Processing - November 2022 - 33
Hydrocarbon Processing - November 2022 - Implement advanced level control techniques to improve crude distillation unit stabilizer performance
Hydrocarbon Processing - November 2022 - 35
Hydrocarbon Processing - November 2022 - 36
Hydrocarbon Processing - November 2022 - Leading capital projects in a VUCA environment
Hydrocarbon Processing - November 2022 - 38
Hydrocarbon Processing - November 2022 - Trip your turbine troubles: Optimize the reliability of steam-driven turbines
Hydrocarbon Processing - November 2022 - 40
Hydrocarbon Processing - November 2022 - 41
Hydrocarbon Processing - November 2022 - 42
Hydrocarbon Processing - November 2022 - 43
Hydrocarbon Processing - November 2022 - 44
Hydrocarbon Processing - November 2022 - 45
Hydrocarbon Processing - November 2022 - 46
Hydrocarbon Processing - November 2022 - Development of novel epoxy closed-cell foam for personnel and corrosion protection—Part 2
Hydrocarbon Processing - November 2022 - 48
Hydrocarbon Processing - November 2022 - 49
Hydrocarbon Processing - November 2022 - 50
Hydrocarbon Processing - November 2022 - Obsolescence management in a manufacturing unit
Hydrocarbon Processing - November 2022 - 50B
Hydrocarbon Processing - November 2022 - Decarbonizing your fired heaters with hydrogen fuel
Hydrocarbon Processing - November 2022 - 52
Hydrocarbon Processing - November 2022 - 53
Hydrocarbon Processing - November 2022 - 54
Hydrocarbon Processing - November 2022 - Mechanical design challenges in high-temperature electric heaters
Hydrocarbon Processing - November 2022 - 56
Hydrocarbon Processing - November 2022 - 57
Hydrocarbon Processing - November 2022 - 58
Hydrocarbon Processing - November 2022 - 59
Hydrocarbon Processing - November 2022 - 60
Hydrocarbon Processing - November 2022 - Why sulfur plants fail: An in-depth study of sulfur recovery unit failures—Part 2
Hydrocarbon Processing - November 2022 - 62
Hydrocarbon Processing - November 2022 - 63
Hydrocarbon Processing - November 2022 - 64
Hydrocarbon Processing - November 2022 - 65
Hydrocarbon Processing - November 2022 - Advertiser Index
Hydrocarbon Processing - November 2022 - 67
Hydrocarbon Processing - November 2022 - 68
https://www.nxtbook.com/gulfenergyinfo/gulfpub/HPI-Market-Data-2023-v3
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com