Business Trends
Quality in construction: Taking a holistic approach
When it comes to quality in construction projects, it is
easy to focus only on materials and installation-it makes
sense that high-quality components lead to a high-quality end
product. However, considerations such as process and scheduling
can also have a significant effect on quality outcomes.
In the past, achieving quality on a project was synonymous
with passing a test. In recent years, the definition of
quality has broadened. Because the end goal of a facility
owner is to have a successful turnover, with complete documentation
and full readiness for production on day one,
projects meeting these criteria are the ones that represent
quality. Requests for proposals (RFPs) tend to focus on a
project's description and scope in its strictest sense, leaving
out ancillary-but important-considerations that can
go on to become " hot button issues " once the project is underway.
To prevent this, planning, design and construction
teams should strive to understand the facility's operating
unit, even before ground is broken. Early conversations that
specifically address operational concerns will allow the delivery
of an optimally functioning facility.
A case in point is addressing quality in decisions surrounding
materials, access and installation complexity. For example,
whereas a safe, functional weld on a pipe can be said to
represent quality, if choosing bolts would result in simpler,
faster installation, then making that choice should be considered
part of achieving quality on the project. Tie-ins to existing
infrastructure are another critical consideration that benefit
from early discussions. Most hydrocarbon construction
projects have multiple points at which other plant operations
will eventually feed into the system; therefore, the logistics
of these tie-ins must be considered in advance, even down to
delivery dates and locations, so that operations personnel in
the existing facilities know what to expect and can schedule
maintenance and other activities in a way that avoids conflicts.
As with materials, access and installation complexity,
project quality associated with tie-ins can be improved by
talking through efficiencies with the project designer. For
example, decisions about where to cut a pipeline for a tie-in
should be made in a way that reduces the amount of support
required for the remaining run of pipe. In addition, if a valve
or other element will be installed in that spot and requires
access, it should be determined in advance how the operator
(and the contractor) can access it.
Issues such as testing and cleaning methods may seem
like late-stage concerns, but leaving these details until the
last minute can result in delays that cause extra days of plant
shutdown and, potentially, millions of lost dollars. The team
should agree from the outset what testing will be required
as part of the project's completion. Time-saving solutions
include identifying locations where X-ray testing can be
performed on pipe connections in just a couple of hours vs.
procedures that would require setting up scaffolding and
evacuating the pipe, which might take days. Ease of maintenance
should also be considered during the design phase.
Not only does quality pertain to a facility's functionality
beyond just materials and installation, but, for hydrocarbon
projects, quality encompasses life, health and safety concerns
that far exceed those associated with many other types of construction.
There is a risk, for example, of toxic gasses escaping
the system during integration of the infrastructure-this can
include a risk of explosions. For this reason, it is especially
critical to involve individuals outside the usual chain-of-command
when making decisions such as shut-off scheduling.
There is another benefit to thinking of quality as a process
rather than an outcome that can be measured with a simple
test: a facility owner's company culture, as well as employee
satisfaction, can be positively impacted. Instead of allowing
personnel outside of the construction team to remain siloed,
making them part of the conversation and addressing their
expectations and concerns makes them feel valued and helps
them bond to others within the organization. Experienced
site representatives for the construction company can facilitate
conversations between facility operators and corporate
decision-makers. Having contractors conduct site visits during
the estimating and procurement stages is also a good way
to communicate with plant operators regarding work schedules
and logistic needs for the mutual benefit of all parties.
Tools that guide quality. A project's delivery method can
also influence quality. Traditional design-bid-build-in which
a facility's design is completed and then sent out to bid-hampers
the ability to accomplish front-end planning. Failing to
capture the insights that result from early planning can have a
devastating impact on a project's profitability or even its constructability
if the discovery of unfeasible project elements
happens too late to be mitigated.
Just as adhering to prescribed installation processes and
procedures ensures quality in physical workmanship, adhering
to construction management processes ensures quality
in overall project outcomes. Fundamentals include keeping
a good paper trail, proactively managing project cost and
schedule, and hiring only qualified workers. From a big picture
point of view, the preconstruction team should view every
aspect of a project as a potential for continuous improvement.
They should direct capital toward the areas that best
benefit the organization's overall goals. Each step in the capiHydrocarbon
Processing | DECEMBER 2022 9

Hydrocarbon Processing - December 2022

Table of Contents for the Digital Edition of Hydrocarbon Processing - December 2022

Hydrocarbon Processing - December 2022 - 1
Hydrocarbon Processing - December 2022 - 2
Hydrocarbon Processing - December 2022 - 3
Hydrocarbon Processing - December 2022 - 4
Hydrocarbon Processing - December 2022 - 5
Hydrocarbon Processing - December 2022 - 6
Hydrocarbon Processing - December 2022 - 7
Hydrocarbon Processing - December 2022 - 8
Hydrocarbon Processing - December 2022 - 9
Hydrocarbon Processing - December 2022 - 10
Hydrocarbon Processing - December 2022 - 10A
Hydrocarbon Processing - December 2022 - 10B
Hydrocarbon Processing - December 2022 - 11
Hydrocarbon Processing - December 2022 - 12
Hydrocarbon Processing - December 2022 - 13
Hydrocarbon Processing - December 2022 - 14
Hydrocarbon Processing - December 2022 - 15
Hydrocarbon Processing - December 2022 - 16
Hydrocarbon Processing - December 2022 - 17
Hydrocarbon Processing - December 2022 - 18
Hydrocarbon Processing - December 2022 - 19
Hydrocarbon Processing - December 2022 - 20
Hydrocarbon Processing - December 2022 - 21
Hydrocarbon Processing - December 2022 - 22
Hydrocarbon Processing - December 2022 - 23
Hydrocarbon Processing - December 2022 - 24
Hydrocarbon Processing - December 2022 - 25
Hydrocarbon Processing - December 2022 - 26
Hydrocarbon Processing - December 2022 - 27
Hydrocarbon Processing - December 2022 - 28
Hydrocarbon Processing - December 2022 - 29
Hydrocarbon Processing - December 2022 - 30
Hydrocarbon Processing - December 2022 - 31
Hydrocarbon Processing - December 2022 - 32
Hydrocarbon Processing - December 2022 - 33
Hydrocarbon Processing - December 2022 - 34
Hydrocarbon Processing - December 2022 - 35
Hydrocarbon Processing - December 2022 - 36
Hydrocarbon Processing - December 2022 - 37
Hydrocarbon Processing - December 2022 - 38
Hydrocarbon Processing - December 2022 - 39
Hydrocarbon Processing - December 2022 - 40
Hydrocarbon Processing - December 2022 - 41
Hydrocarbon Processing - December 2022 - 42
Hydrocarbon Processing - December 2022 - 43
Hydrocarbon Processing - December 2022 - 44
Hydrocarbon Processing - December 2022 - 45
Hydrocarbon Processing - December 2022 - 46
Hydrocarbon Processing - December 2022 - 47
Hydrocarbon Processing - December 2022 - 48
Hydrocarbon Processing - December 2022 - 49
Hydrocarbon Processing - December 2022 - 50
Hydrocarbon Processing - December 2022 - 51
Hydrocarbon Processing - December 2022 - 52
Hydrocarbon Processing - December 2022 - 53
Hydrocarbon Processing - December 2022 - 54
Hydrocarbon Processing - December 2022 - 55
Hydrocarbon Processing - December 2022 - 56
Hydrocarbon Processing - December 2022 - 57
Hydrocarbon Processing - December 2022 - 58
Hydrocarbon Processing - December 2022 - 59
Hydrocarbon Processing - December 2022 - 60
Hydrocarbon Processing - December 2022 - 61
Hydrocarbon Processing - December 2022 - 62
Hydrocarbon Processing - December 2022 - 63
Hydrocarbon Processing - December 2022 - 64
Hydrocarbon Processing - December 2022 - 65
Hydrocarbon Processing - December 2022 - 66
Hydrocarbon Processing - December 2022 - 67
Hydrocarbon Processing - December 2022 - 68
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com