Underground Infrastructure - November 2023 - 25
Australia's longest-established HDD
company providing design, engineering
and construction of trenchless solutions
for each project's unique challenges
and conditions.
David Mancini & Sons
2601 Wiles Road
Pompano Beach, FL 33073
p: (954) 977-3556
w: dmsi.co
e: dmancinijr@dmsi.co
contact: David Mancini Jr.
1 Rig with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 54 in.
Maximum Pullback: 660,000 lbs.
Maximum Torque: 80,000 ft.-lbs.
As a fourth-generation contractor we
bring the experience to get the job done.
Our motto is NGUNS: Never Give Up,
Never Surrender.
Davis Directional Drilling LLC
9119 Oklahoma 76/PO Box 177
Healdton, OK 73438
p: (580) 229-1280
w: davisdirectionaldrilling.com
e: daviscorp@sbcglobal.net
contact: Doug Davis
23 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 36 in.
Maximum Pullback: 550,000 lbs.
Maximum Torque: 50,000 ft.-lbs.
We have been in business for more
than 50 years and have done HDD
work for 20-plus years. Experience
is our key to success.
Direct Horizontal Drilling
11507 272 Street
Acheson, Alberta, Canada T7X 6E9
p: (780) 960-6037
w: directhorizontal.com
DRS Enterprises
5339 Canal Rd
Garfield Heights, OH 44125
p: (216) 581-7771
e: drs120@yahoo.com
contact: Dan Schmoldt
5 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,100,000 lbs.
Maximum Torque: 80,000 ft.-lbs.
e: dave.f@directhorizontal.com;
rick.s@directhorizontal.com
contact: Dave Fisher; Rick Shipalesky
15 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,100,000 lbs.
Maximum Torque: 100,000 ft.-lbs.
Complete services and expert solutions
for HDD and river crossings. Industry
leader with proven success in some
of the toughest drilling environments
in the world.
Driver Pipeline Co. Inc.
1200 North Union Bower Rd.
Irving, TX 75061
p: (800) 852-1405; (214) 638-7131
w: driverpipeline.com
e: jlangford@driverpipeline.com
contact: John Langford
11 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 36 in.
Maximum Pullback: 200,000 lbs.
Maximum Torque: 25,000 ft.-lbs.
Driver Pipeline has more than 20 years of
experience in the HDD industry offering
turnkey solutions to HDD projects.
ECI Contracting
56035 State Hwy 56
West Concord, MN 55082
p: (507) 527-2294
w: ecicontracting.us
e: rtumbleson@ecicontracting.us
contact: Rob Tumbleson
8 Rigs Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 54 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 80,000 ft.-lbs.
Expertise for projects that are large,
small or through hard rock. Capabilities
up to 54 inches in diameter and lengths
up to 8,000 feet.
Directional drilling from small diameter
to 60-inch diameter; distances
from 100 feet up to 7,000 feet;
bore intersect capability and rock
capabilities in many diameters.
Gabe's Construction Co. Inc.
4804 N. 40th St.
Sheboygan, WI 53083
p: (920) 459-2600
w: gabes.com
e: neastway@gabes.com
contact: Nathan Eastway
5 Rigs with Minimum 100,000 lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 625,000 lbs.
Maximum Torque: 100,000 ft.-lbs.
Provides HDD services for the pipeline,
utility and telecommunications
industries throughout North America,
in all geological conditions. Also offers
six smaller utility rigs.
Gator Boring & Trenching Inc.
1800 Blackbird Lane
Pensacola, FL 32534
p: (850) 477-0742
w: gatorboring.com
e: lisa@gatorboring.com
contact: Lisa Lyons
Forages Nella Inc.
118 De La Gare
St. Henri, Quebec, Canada G0R 3E0
p: (418) 822-2002
w: nella-drilling.com
e: info@nella-drilling.com
3 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 750, 000 lbs.
Maximum Torque: 94,000 ft.-lbs.
Capability to adapt our machinery and
procedures to succeed in all types of
HDD projects, regardless of size and
difficulties encountered.
5 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 500,000 lbs.
Maximum Torque: 50,000 ft.-lbs.
Serving the southeastern United States
with 5 HDD rigs and fusion crews.
Specializing in gravity bores, subaqueous
crossings, and water/sewer bores.
Global Underground Corp.
641 Winters Dr.
Colorado Springs, CO 80907
p: (719) 471-7414
w: globalug.com
e: rmeadows@globalug.com
contact: Robert Meadows
4 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
UndergroundInfrastructure.com | NOVEMBER 2023 25
http://www.gabes.com
http://www.dmsi.co
http://www.ecicontracting.us
http://www.driverpipeline.com
http://www.gatorboring.com
http://www.davisdirectionaldrilling.com
http://www.nella-drilling.com
http://www.globalug.com
http://www.directhorizontal.com
http://www.UndergroundInfrastructure.com
Underground Infrastructure - November 2023
Table of Contents for the Digital Edition of Underground Infrastructure - November 2023
Underground Infrastructure - November 2023 - 1
Underground Infrastructure - November 2023 - 2
Underground Infrastructure - November 2023 - 3
Underground Infrastructure - November 2023 - 4
Underground Infrastructure - November 2023 - 5
Underground Infrastructure - November 2023 - 6
Underground Infrastructure - November 2023 - 7
Underground Infrastructure - November 2023 - 8
Underground Infrastructure - November 2023 - 9
Underground Infrastructure - November 2023 - 10
Underground Infrastructure - November 2023 - 11
Underground Infrastructure - November 2023 - 12
Underground Infrastructure - November 2023 - 13
Underground Infrastructure - November 2023 - 14
Underground Infrastructure - November 2023 - 15
Underground Infrastructure - November 2023 - 16
Underground Infrastructure - November 2023 - 17
Underground Infrastructure - November 2023 - 18
Underground Infrastructure - November 2023 - 19
Underground Infrastructure - November 2023 - 20
Underground Infrastructure - November 2023 - 21
Underground Infrastructure - November 2023 - 22
Underground Infrastructure - November 2023 - 23
Underground Infrastructure - November 2023 - 24
Underground Infrastructure - November 2023 - 25
Underground Infrastructure - November 2023 - 26
Underground Infrastructure - November 2023 - 27
Underground Infrastructure - November 2023 - 28
Underground Infrastructure - November 2023 - 29
Underground Infrastructure - November 2023 - 30
Underground Infrastructure - November 2023 - 31
Underground Infrastructure - November 2023 - 32
Underground Infrastructure - November 2023 - 33
Underground Infrastructure - November 2023 - 34
Underground Infrastructure - November 2023 - 35
Underground Infrastructure - November 2023 - 36
Underground Infrastructure - November 2023 - 37
Underground Infrastructure - November 2023 - 38
Underground Infrastructure - November 2023 - 39
Underground Infrastructure - November 2023 - 40
Underground Infrastructure - November 2023 - 41
Underground Infrastructure - November 2023 - 42
Underground Infrastructure - November 2023 - 43
Underground Infrastructure - November 2023 - 44
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-november-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-october-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-september-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-august-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-july-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-june-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-may-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-april-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-march-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-february-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/january-2023
https://www.nxtbookmedia.com