Underground Infrastructure - November 2023 - 26
2023 Large Horizontal Directional Drilling Rigs Census
Maximum Pullback: 440,000 lbs.
Maximum Torque: 80,000 ft.-lbs.
Have provided HDD services, since
1999, primarily to government agencies,
military facilities, and municipalities,
for water, wastewater, natural gas,
petroleum, electric, drainage, and
communications.
Horizontal Boring & Tunneling Co.
505 S. River Ave.
Exeter, NE 68351
p: (402) 266-5347
w: hbttrenchless.com
e: horizontalboring@hbttrenchless.com
contact: Brent Moore, Estimator
3 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 440,000 lbs.
Maximum Torque: 53,000 ft.-lbs.
H&H Enterprises
6104 Fenkell Rd./PO Box 1539
Andover, OH 44003
p: (440) 293-8911
w: handhent.com
e: bunky.jordan@handhent.com
contact: Bunky Jordan
3 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 220,000 lbs.
Maximum Torque: 36,000 ft.-lbs.
H&H Enterprises provides services
for all your HDD needs, specializing
in solid rock, with capabilities up to
48-inch diameter and 6,000-foot length.
More than 40 years of experience in
trenchless methods including tunneling,
pipe jacking, concrete box jacking, pilot
tube/guided boring, microtunneling,
auger boring and pipe ramming.
Nationwide contractor experienced in
all geological conditions. Consultation,
design and execution specialists offering
services to gas transmission and
distribution, water, sewer, electric and
telecom companies.
Isaacks Directional Drilling Co.
2710 FM 1069/PO Box 1112
Aransas Pass, TX 78336
p: (361) 758-7297
e: mscruggs@isaacksdd.com
contact: Monty Scruggs
4 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 93,000 ft.-lbs.
Horizontal Drilling International
165 Boulevard de Valmy
92700 Colombes, France
p: +33 1 57 60 93 21
w: hdi.fr
e: contact@hdi.fr
contact: Denis Pellerin; Atef Khemiri
Harding Directional Drilling
10711 Spur 231
Bryan, TX 77807
p: (979) 778-2691
w: hardingdrilling.com
e: rhamilton@hardingdrilling.com
contact: Robert Hamilton
5 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 72,000 ft.-lbs.
Full-service directional drilling company
serving the continental U.S., Canada
and Mexico since 1994. Completed
lengths in excess of 8,000 feet.
HardRock Infrastructure
Services LLC
16500 San Pedro Ave. Suite 410
San Antonio, TX 78232
p: (210) 403-2086
website: hardrockis.com
email: cory.baker@hardrockis.com
contact: Cory Baker
23 Rigs with Minimum 100,000 lbs
Pullback
Maximum Pipe Diameter: 54 in.
Maximum Pullback Capacity: 1,000,000 lbs.
Maximum Torque: 98,000 ft.-lbs.
Capabilities to provide full project support,
from smallest road bores to longest river
crossings. Also provide a full safety team,
along with project management.
9 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 56 in.
Maximum Pullback: 880,000 lbs.
Maximum Torque: 100,000 ft.-lbs.
More than 30 years of experience and
2,200-plus successful crossings in over
40 countries; lengths more than 2,000
meters and diameters up to 56 inches.
Directional drilling and road boring
for the oil and gas pipeline industry.
Kirk Excavating & Construction Inc.
1399 Stimmel Road
Columbus, Ohio 43223
p: (614) 323-2970
w: kirkexcxavating.com
e: ckirk@kirkexcavating.com
contact: Chuck Kirk
3 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 36 in.
Maximum Pullback: 440,000 lbs.
Maximum Torque: 60,000 ft.-lbs.
We drill nationwide for pipeline and
utilities crossing lakes, rivers, wetlands,
highways and everything else in
between. We provide wireline, Gyro,
and walkover services.
HUXTED Trenchless LLC
(previously, ECI Drilling
International LLC)
1306 North FM 3083 Rd. East
Conroe, TX 77303
p: (936) 441-9080
w: huxtedtrenchless.com
e: dbrasher@huxtedtrenchless.com
contact: Dustin Brasher
6 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,200,000 lbs.
Maximum Torque: 95,000 ft.-lbs.
Offers a full line of HDD and
microtunneling capabilities; specializes
in large-diameter, challenging projects,
utilizing our comprehensive trenchless
and marine assets.
InterCon Construction Inc.
5512 State Route 113 & 19
Waunakee, WI 53597
p: (608) 850-4827
w: intercon-const.com
e: sallen@intercon-const.com
contact: Steve Allen
6 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 480,000 lbs.
Maximum Torque: 80,000 ft.-lbs.
26 NOVEMBER 2023 | UndergroundInfrastructure.com
LaGreca Services Inc.
148 LaGreca Court
Schriever, LA 70395
p: (985) 447-4764
w: LinkedIn.com, Facebook.com
e: jason@lagrecahdd.com
contact: Jason Theriot
2 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 500,000 lbs.
Maximum Torque: 75,000 ft.-lbs.
Incorporated in 1996, LaGreca is a
" Do it all " company with less than 20
employees. We take pride in completing
special, more complicated projects.
Laney Directional Drilling Co.
1100 Alegacy Place
Waller, TX 77484
p: (281) 540-6615
w: laneydrilling.com
e: twilcfox@laneydrilling.com
contact: Travis Wilcox
13 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,700,000 lbs.
Maximum Torque: 97,500 ft.-lbs.
Laney Directional Drilling offers
turnkey trenchless engineering and
construction services for horizontal
directional drilling, Direct Pipe,
and pipeline extraction.
LMR Drilling GmbH
Ammerlaender Heerstr. 368
26129 Oldenburg, Germany
p: +49 441 97191-0
w: lmr-drilling.de
e: fengler@lmr-drilling.de
contact: Ernst Fengler
5 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 56 in.
Maximum Pullback: 1,011,645 lbs.
Maximum Torque: 103,032 ft.-lbs.
Horizontal directional drilling,
engineering, construction and
installation of HDD crossings, outfalls
and shore approaches.
Lucas
Emirates House, Lvl 22, 167 Eagle Street/
GPO Box 144
Brisbane QLD 4000, Australia
p: 07 3363 7333
w: lucas.com.au
7 Rigs with Minimum 100,000 lbs. Pullback
Maximum Pipe Diameter: 52 in.
Maximum Pullback: 1,100,000 lbs.
Maximum Torque: 100,000 ft.-lbs.
International contractor with a strong
focus on technically challenging
projects, particularly EPL contracts.
Also specialize in hard rock drilling
utilizing patented tooling.
Mears Group Inc.
480 Wildwood Forest Drive, Ste. 320
Spring, TX 77380
p: (832) 634-2900
w: mears.net
e: greg.bosch@mears.net
contact: Gregory Bosch
18 Rigs with Minimum 100,000 lbs.
Pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,300,000 lbs.
Maximum Torque: 88,000 ft.-lbs.
HDD and Direct Pipe (500- and 750ton
rigs) contractor serving oil/gas,
electrical, water/wastewater and fiber
industries. Focused on design/build
and EPC, with HDD/DP critical factors.
Michels Trenchless Inc.
814 Main St.
Brownsville, WI 53006
p: (920) 583-3132
w: michels.us
e: jsmueller@michels.us
contact: Jeffrey S. Mueller
http://www.hbttrenchless.com
http://www.lmr-drilling.de
http://www.handhent.com
http://www.hdi.fr
http://www.kirkexcxavating.com
http://lucas.com.au
http://www.hardingdrilling.com
http://www.LinkedIn.com
http://www.Facebook.com
http://www.huxtedtrenchless.com
http://www.mears.net
http://www.hardrockis.com
http://www.laneydrilling.com
http://www.intercon-const.com
http://www.michels.us
http://www.UndergroundInfrastructure.com
Underground Infrastructure - November 2023
Table of Contents for the Digital Edition of Underground Infrastructure - November 2023
Underground Infrastructure - November 2023 - 1
Underground Infrastructure - November 2023 - 2
Underground Infrastructure - November 2023 - 3
Underground Infrastructure - November 2023 - 4
Underground Infrastructure - November 2023 - 5
Underground Infrastructure - November 2023 - 6
Underground Infrastructure - November 2023 - 7
Underground Infrastructure - November 2023 - 8
Underground Infrastructure - November 2023 - 9
Underground Infrastructure - November 2023 - 10
Underground Infrastructure - November 2023 - 11
Underground Infrastructure - November 2023 - 12
Underground Infrastructure - November 2023 - 13
Underground Infrastructure - November 2023 - 14
Underground Infrastructure - November 2023 - 15
Underground Infrastructure - November 2023 - 16
Underground Infrastructure - November 2023 - 17
Underground Infrastructure - November 2023 - 18
Underground Infrastructure - November 2023 - 19
Underground Infrastructure - November 2023 - 20
Underground Infrastructure - November 2023 - 21
Underground Infrastructure - November 2023 - 22
Underground Infrastructure - November 2023 - 23
Underground Infrastructure - November 2023 - 24
Underground Infrastructure - November 2023 - 25
Underground Infrastructure - November 2023 - 26
Underground Infrastructure - November 2023 - 27
Underground Infrastructure - November 2023 - 28
Underground Infrastructure - November 2023 - 29
Underground Infrastructure - November 2023 - 30
Underground Infrastructure - November 2023 - 31
Underground Infrastructure - November 2023 - 32
Underground Infrastructure - November 2023 - 33
Underground Infrastructure - November 2023 - 34
Underground Infrastructure - November 2023 - 35
Underground Infrastructure - November 2023 - 36
Underground Infrastructure - November 2023 - 37
Underground Infrastructure - November 2023 - 38
Underground Infrastructure - November 2023 - 39
Underground Infrastructure - November 2023 - 40
Underground Infrastructure - November 2023 - 41
Underground Infrastructure - November 2023 - 42
Underground Infrastructure - November 2023 - 43
Underground Infrastructure - November 2023 - 44
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-november-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-october-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-september-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-august-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-july-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-june-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-may-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-april-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-march-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-infrastructure-february-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/january-2023
https://www.nxtbookmedia.com