Modern Contractor Solutions November 2024 - 38

company profile
Isuzu Motors America, LLC
The Power Behind It All
I
suzu is known for reliable, eco-friendly,
durable, and technologically advanced
engines that power agricultural,
construction, industrial, medical, and
rental markets in the America's. All with
quiet, fuel-efficient products for customer
specific applications.
Pre-Validated Reliable Power
Isuzu Pre-Validated Genset-Ready Power
Units product lineup is now expanded to
include the 4L-Series. Purchased in predefined
models as 100-percent pre-validated.
Our 4J-Series is equipped with a 3.0L, 4
Cylinder, 70.8 kW (95 HP) constant speed
@1800 RPM diesel engine. The 4H-Series
is equipped with a 5.2L, 4 Cylinder, 127.5
kW (171 HP) constant speed @1800 RPM,
the 6H-Series 7.8L, 6 Cylinder, 193.8 kW
(260 HP) @1800 RPM and the newly added
4L-Series is equipped with a 2.2L, 4 Cylinder,
30-49 kW (40.2-66 HP) constant speed @
1800 RPM. These are all Tier 4 Final Certified
and branded under Isuzu REDTech™ (Reliable,
Eco-Friendly, Durable, and Technologically
Advanced Diesel Technology). Isuzu PreValidated
Genset-Ready Power Units are built
using components and features necessary
to successfully meet all installation testing
criteria associated with long engine life, while
also maintaining optimized performance.
Isuzu REDTech™ Pre-Validated Power
Units have been engineered for use with
several different generator manufacturers'
products. These engines carry one of the best
warranties in the industry, 5 years/5000 hours
and their Power Unit Components offer 2
years/2000 hours limited warranty.
Durable and Eco-friendly
Genset Power
The standard power unit packages are
engineered to include an air-intake system
with dual element air cleaner, exhaust gas
after-treatment system, a complete cooling
package, vibration isolators (engine and
cooling package), and all engine filters.
The power unit engine-control module and
wiring harness incorporate oil pressure,
coolant temperature, intake air pressure,
and temperature and engine-speed sensors
and shutdowns. These complete power
units can also be assembled to a customersupplied
design of pre-validated skid base/
generator combination, resulting in a 100%
Pre-Validated Genset-Ready Power Unit.
Pre-tested Durable Power - Saving
Engineering Resources, Time, and
Money, While Minimizing Inventory
The Isuzu REDTech™ Open Genset Power
Units have also been designed with a
generator-ready skid base that has been
100% validated for one or more selected
generator model/frame lines. If you use one
of these complete (Genset-Ready) Isuzu
REDTech™ designs (power unit with cross
member, mounting/isolators and optional
controller) with a pre-validated generator,
it is possible for immediate turnarounds on
inventory. In addition, various adjustable
cross member designs for mounting as
many as ten different common generator
brands/models to the power unit have
been pre-designed. When combined with
a standard pre-validated 4L, 4J, 4H, or
6H open Genset Power Unit, all remaining
validation can be completed in only a
few days. This allows the stocking of one
(1) Genset ready power unit for each
engine model to be used with 10 or more
different generators.
38
NOVEMBER 2024
www.mcsmag.com
http://www.mcsmag.com

Modern Contractor Solutions November 2024

Table of Contents for the Digital Edition of Modern Contractor Solutions November 2024

Table of Contents
Industry News
Stick to the Plan
Surety Bonds to Protect Your Success
Cut Costs, Boost Efficiency
Chevron Clarity Bio EliteSyn AW
Geopolymer Materials for Construction
IoT Revolution
From Paper to Practice
GAO/COFC Bid Protest Splits
2025 Buyers Guide
Modern Contractor Solutions November 2024 - Cover1
Modern Contractor Solutions November 2024 - Cover2
Modern Contractor Solutions November 2024 - 1
Modern Contractor Solutions November 2024 - 2
Modern Contractor Solutions November 2024 - 3
Modern Contractor Solutions November 2024 - Table of Contents
Modern Contractor Solutions November 2024 - 5
Modern Contractor Solutions November 2024 - 6
Modern Contractor Solutions November 2024 - 7
Modern Contractor Solutions November 2024 - Industry News
Modern Contractor Solutions November 2024 - 9
Modern Contractor Solutions November 2024 - 10
Modern Contractor Solutions November 2024 - 11
Modern Contractor Solutions November 2024 - 12
Modern Contractor Solutions November 2024 - 13
Modern Contractor Solutions November 2024 - Stick to the Plan
Modern Contractor Solutions November 2024 - 15
Modern Contractor Solutions November 2024 - Surety Bonds to Protect Your Success
Modern Contractor Solutions November 2024 - 17
Modern Contractor Solutions November 2024 - Cut Costs, Boost Efficiency
Modern Contractor Solutions November 2024 - 19
Modern Contractor Solutions November 2024 - Chevron Clarity Bio EliteSyn AW
Modern Contractor Solutions November 2024 - 21
Modern Contractor Solutions November 2024 - Geopolymer Materials for Construction
Modern Contractor Solutions November 2024 - 23
Modern Contractor Solutions November 2024 - IoT Revolution
Modern Contractor Solutions November 2024 - 25
Modern Contractor Solutions November 2024 - From Paper to Practice
Modern Contractor Solutions November 2024 - 27
Modern Contractor Solutions November 2024 - GAO/COFC Bid Protest Splits
Modern Contractor Solutions November 2024 - 29
Modern Contractor Solutions November 2024 - 30
Modern Contractor Solutions November 2024 - 2025 Buyers Guide
Modern Contractor Solutions November 2024 - 32
Modern Contractor Solutions November 2024 - 33
Modern Contractor Solutions November 2024 - 34
Modern Contractor Solutions November 2024 - 35
Modern Contractor Solutions November 2024 - 36
Modern Contractor Solutions November 2024 - 37
Modern Contractor Solutions November 2024 - 38
Modern Contractor Solutions November 2024 - 39
Modern Contractor Solutions November 2024 - 40
Modern Contractor Solutions November 2024 - 41
Modern Contractor Solutions November 2024 - 42
Modern Contractor Solutions November 2024 - 43
Modern Contractor Solutions November 2024 - 44
Modern Contractor Solutions November 2024 - 45
Modern Contractor Solutions November 2024 - 46
Modern Contractor Solutions November 2024 - 47
Modern Contractor Solutions November 2024 - 48
Modern Contractor Solutions November 2024 - 49
Modern Contractor Solutions November 2024 - 50
Modern Contractor Solutions November 2024 - 51
Modern Contractor Solutions November 2024 - 52
Modern Contractor Solutions November 2024 - 53
Modern Contractor Solutions November 2024 - 54
Modern Contractor Solutions November 2024 - Cover3
Modern Contractor Solutions November 2024 - Cover4
https://www.nxtbook.com/highlandspublications/ModernContractorSolutions/modern-contractor-solutions-november-2024
https://www.nxtbookmedia.com