Building a reinforced soil wall with geogrids at hillside
The design parameters for reinforced
padding, retained soil and foundation
floor are shown below:
* Reinforced filling: cohesion 0, friction
angle of 34° and specific weight of 14
KN/m3
* Retained soil: cohesion 5 KN/m2,
friction angle of 28° and specific
gravity of 18.5 KN/m3
* Foundation soil: cohesion 15 KN/m2,
friction angle of 24.6° and specific
gravity of 18.5 KN/m3
* Live load (traffic load): 12 KN/m2
* Dead load (concrete pavement): 3.6
KN/m2
* Minimum FS for static analysis of 1.3
and for the dynamic case of 1.1
The results of the analysis described
above are shown in Figures 4, 5a and 5b.
Now, using the Sierra Bank and varying
the values of friction angle (35.3°)
and specific weight (21 KN/m3), the
following results are obtained as follows
in Figures 6a and 6b.
With these results, it can be inferred
that with a heavier material like concrete
(specific weight = 24 KN/m3), a failure
due to global stability might happen if a
concrete wall is used.
FIGURE 4 Analysis of external and internal stability static and dynamic scenarios
5a
5b
FIGURES 5a and 5b (a) Global stability analysis of static (minimum FS 1,430 > 1.3, OK) and (b) dynamic scenarios (minimum FS of 1,102 > 1.1, OK).
30
Geosynthetics | August September 2022
Geosynthetics August/September 2022
Table of Contents for the Digital Edition of Geosynthetics August/September 2022
Geosynthetics August/September 2022 - Cover1
Geosynthetics August/September 2022 - Cover2
Geosynthetics August/September 2022 - 1
Geosynthetics August/September 2022 - 2
Geosynthetics August/September 2022 - 3
Geosynthetics August/September 2022 - 4
Geosynthetics August/September 2022 - 5
Geosynthetics August/September 2022 - 6
Geosynthetics August/September 2022 - 7
Geosynthetics August/September 2022 - 8
Geosynthetics August/September 2022 - 9
Geosynthetics August/September 2022 - 10
Geosynthetics August/September 2022 - 11
Geosynthetics August/September 2022 - 12
Geosynthetics August/September 2022 - 13
Geosynthetics August/September 2022 - 14
Geosynthetics August/September 2022 - 15
Geosynthetics August/September 2022 - 16
Geosynthetics August/September 2022 - 17
Geosynthetics August/September 2022 - 18
Geosynthetics August/September 2022 - 19
Geosynthetics August/September 2022 - 20
Geosynthetics August/September 2022 - 21
Geosynthetics August/September 2022 - 22
Geosynthetics August/September 2022 - 23
Geosynthetics August/September 2022 - 24
Geosynthetics August/September 2022 - 25
Geosynthetics August/September 2022 - 26
Geosynthetics August/September 2022 - 27
Geosynthetics August/September 2022 - 28
Geosynthetics August/September 2022 - 29
Geosynthetics August/September 2022 - 30
Geosynthetics August/September 2022 - 31
Geosynthetics August/September 2022 - 32
Geosynthetics August/September 2022 - 33
Geosynthetics August/September 2022 - 34
Geosynthetics August/September 2022 - 35
Geosynthetics August/September 2022 - 36
Geosynthetics August/September 2022 - 37
Geosynthetics August/September 2022 - 38
Geosynthetics August/September 2022 - 39
Geosynthetics August/September 2022 - 40
Geosynthetics August/September 2022 - 41
Geosynthetics August/September 2022 - 42
Geosynthetics August/September 2022 - 43
Geosynthetics August/September 2022 - 44
Geosynthetics August/September 2022 - Cover3
Geosynthetics August/September 2022 - Cover4
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-july-august-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-case-studies-guide-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-april-may-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-february-march-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-december-2023-january-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2023
https://www.nxtbook.com/ata/geosynthetics/geoysynthetics-august-september-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-june-july-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-april-may-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-february-march-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-december-2022-january-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-august-september-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-june-july-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-april-may-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-february-march-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-december-2021-january-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-october-november-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-august-september-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-june-july-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-april-may-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-february-march-2021
https://www.nxtbook.com/ifai/geosynthetics/1220GS
https://www.nxtbook.com/ifai/geosynthetics/1020GS
https://www.nxtbook.com/ifai/geosynthetics/0820GS
https://www.nxtbook.com/ifai/geosynthetics/0620GS
https://www.nxtbook.com/ifai/geosynthetics/0420GS
https://www.nxtbook.com/ifai/geosynthetics/0220GS
https://www.nxtbook.com/ifai/geosynthetics/1219GS
https://www.nxtbook.com/ifai/geosynthetics/1019GS
https://www.nxtbook.com/ifai/geosynthetics/0819GS
https://www.nxtbook.com/ifai/geosynthetics/0619GS
https://www.nxtbook.com/ifai/geosynthetics/0419GS
https://www.nxtbook.com/ifai/geosynthetics/0219GS
https://www.nxtbook.com/ifai/geosynthetics/1218GS
https://www.nxtbook.com/ifai/geosynthetics/1018GS
https://www.nxtbook.com/ifai/geosynthetics/0818GS
https://www.nxtbook.com/ifai/geosynthetics/0618GS
https://www.nxtbook.com/ifai/geosynthetics/0418GS
https://www.nxtbook.com/ifai/geosynthetics/0218GS
https://www.nxtbookmedia.com