Construction process
The construction of the wall was complete
in three months. To do this, the
first step was improving the conditions
of the foundation ground. In this phase,
a ground improvement was made by
placing two layers 20 inches (50 cm) of
crushed gravel in two layers reinforced
with triaxial geogrids with the aim of
reducing possible differential seats and
thus improving the bearing capacity of
the foundation soil.
Once this stage was completed, the
6a
20-inch (50 cm) thick draining filter
basket was placed. On top of this layer,
the crushed gravel is protected by placing
a blanket of nonwoven geotextile
and placing reinforced material baskets
vertically spaced every 20 inches (50
cm). The reinforced filling is compacted
with a compaction energy of 95% of the
Modified Proctor with the maximum
density values of 14 KN/m3 and an optimum
humidity of 23.4%. The construction
process is shown in Figure 7 on
page 32.
Conclusions and
recommendations
MSE walls reinforced with geogrids and,
specifically, using the Sierra system, have
good flexibility to be constructed in
various adverse topographic situations.
They also have reduced execution times
that translate into economic savings.
The friction angle is a very important
parameter for the correct interaction
between the geogrid and the soil
particles of the filler material, where
values of friction angle greater than 30°
are recommended to ensure that the
interlocking between geogrids and filler
material occurs.
The comparison between the filler
material used from the 12 + 700 borrow
pit and the Sierra borrow pit produce
a significant effect on the calculation
GeosyntheticsMagazine.com
31
FIGURES 6a and 6b (a) Global stability analysis of static (minimum FS 1,311 > 1.3, OK)
and (b) dynamic scenarios (minimum FS of 1,051 < 1.1, failed).
6b
http://www.GeosyntheticsMagazine.com

Geosynthetics August/September 2022

Table of Contents for the Digital Edition of Geosynthetics August/September 2022

Geosynthetics August/September 2022 - Cover1
Geosynthetics August/September 2022 - Cover2
Geosynthetics August/September 2022 - 1
Geosynthetics August/September 2022 - 2
Geosynthetics August/September 2022 - 3
Geosynthetics August/September 2022 - 4
Geosynthetics August/September 2022 - 5
Geosynthetics August/September 2022 - 6
Geosynthetics August/September 2022 - 7
Geosynthetics August/September 2022 - 8
Geosynthetics August/September 2022 - 9
Geosynthetics August/September 2022 - 10
Geosynthetics August/September 2022 - 11
Geosynthetics August/September 2022 - 12
Geosynthetics August/September 2022 - 13
Geosynthetics August/September 2022 - 14
Geosynthetics August/September 2022 - 15
Geosynthetics August/September 2022 - 16
Geosynthetics August/September 2022 - 17
Geosynthetics August/September 2022 - 18
Geosynthetics August/September 2022 - 19
Geosynthetics August/September 2022 - 20
Geosynthetics August/September 2022 - 21
Geosynthetics August/September 2022 - 22
Geosynthetics August/September 2022 - 23
Geosynthetics August/September 2022 - 24
Geosynthetics August/September 2022 - 25
Geosynthetics August/September 2022 - 26
Geosynthetics August/September 2022 - 27
Geosynthetics August/September 2022 - 28
Geosynthetics August/September 2022 - 29
Geosynthetics August/September 2022 - 30
Geosynthetics August/September 2022 - 31
Geosynthetics August/September 2022 - 32
Geosynthetics August/September 2022 - 33
Geosynthetics August/September 2022 - 34
Geosynthetics August/September 2022 - 35
Geosynthetics August/September 2022 - 36
Geosynthetics August/September 2022 - 37
Geosynthetics August/September 2022 - 38
Geosynthetics August/September 2022 - 39
Geosynthetics August/September 2022 - 40
Geosynthetics August/September 2022 - 41
Geosynthetics August/September 2022 - 42
Geosynthetics August/September 2022 - 43
Geosynthetics August/September 2022 - 44
Geosynthetics August/September 2022 - Cover3
Geosynthetics August/September 2022 - Cover4
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-december-2024-january-2025
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-july-august-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-case-studies-guide-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-april-may-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-february-march-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-december-2023-january-2024
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2023
https://www.nxtbook.com/ata/geosynthetics/geoysynthetics-august-september-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-june-july-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-april-may-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-february-march-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-december-2022-january-2023
https://www.nxtbook.com/ata/geosynthetics/geosynthetics-october-november-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-august-september-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-june-july-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-april-may-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-february-march-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-december-2021-january-2022
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-october-november-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-august-september-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-june-july-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-april-may-2021
https://www.nxtbook.com/ifai/geosynthetics/geosynthetics-february-march-2021
https://www.nxtbook.com/ifai/geosynthetics/1220GS
https://www.nxtbook.com/ifai/geosynthetics/1020GS
https://www.nxtbook.com/ifai/geosynthetics/0820GS
https://www.nxtbook.com/ifai/geosynthetics/0620GS
https://www.nxtbook.com/ifai/geosynthetics/0420GS
https://www.nxtbook.com/ifai/geosynthetics/0220GS
https://www.nxtbook.com/ifai/geosynthetics/1219GS
https://www.nxtbook.com/ifai/geosynthetics/1019GS
https://www.nxtbook.com/ifai/geosynthetics/0819GS
https://www.nxtbook.com/ifai/geosynthetics/0619GS
https://www.nxtbook.com/ifai/geosynthetics/0419GS
https://www.nxtbook.com/ifai/geosynthetics/0219GS
https://www.nxtbook.com/ifai/geosynthetics/1218GS
https://www.nxtbook.com/ifai/geosynthetics/1018GS
https://www.nxtbook.com/ifai/geosynthetics/0818GS
https://www.nxtbook.com/ifai/geosynthetics/0618GS
https://www.nxtbook.com/ifai/geosynthetics/0418GS
https://www.nxtbook.com/ifai/geosynthetics/0218GS
https://www.nxtbookmedia.com