Marine Fabricator January/February 2021 - 21

FRAME STRUCTURE
1-INCH STAINLESS FRAME
Beam (In Feet)

7'

9'

10.5'

13.5'

1-frame

1.5 hrs.

1.5 hrs.

1.75 hrs.

2.5 hrs.

2-frame

2 hrs.

2.25 hrs.

2.5 hrs.

4 hrs.

3-frame

2.5 hrs.

2.75 hrs.

3 hrs.

5 hrs.

4-frame

3 hrs.

3.25 hrs.

3.5 hrs.

5 hrs.

5-frame

3.5 hrs.

3.75 hrs.

4 hrs.

6 hrs.

OPTIONS
Rigid supports (one pair)
Through-bolt mounts

» Bimini

NOTE: These times include the
design, bending, assembly and
installation of the frame onto the
boat. They do not include any of the
options listed, nor do they include
any actual fit of the top.

1 hr.
0.75 hr.

Severe angle mounts

2 hrs.

Dog-leg frame

0.5 hr.

Split mount

0.75 hr.

Grab rail

0.5 hr.

*** SEE CONSIDERATIONS ON PAGE 20.

ATTACHED BIMINI
Beam (In Feet)

7'

9'

10.5'

13.5'

1-frame

4.5 hrs.

5 hrs.

5.5 hrs.

7 hrs.

2-frame

7 hrs.

7 hrs.

9.5 hrs.

12.5 hrs.

3-frame

8 hrs.

8 hrs.

10.5 hrs.

14 hrs.

4-frame

9 hrs.

9.5 hrs.

12 hrs.

16 hrs.

Beam (In Feet)

7'

9'

10.5'

13.5'

Attachment using
Zipper and Keder

1

1.25

1.5

1.75

7'

9'

11'

13+

1-frame

0.5 hr.

0.5 hr.

0.75 hr.

0.75 hr.

2-frame

1 hr.

1 hr.

1.25 hrs.

1.25 hrs.

3-frame

1.5 hrs.

1.5 hrs.

1.75 hrs.

1.75 hrs.

OPTIONS

Straps (one pair)
For odd-shaped arch:

0.5 hr.
Add 1.5 hrs.

ZIPPER POCKETS
Beam (In Feet)

OPTIONS
Zipper Walk-Through

2 hrs.

Front Panel Clear Insert

3 hrs.

Straps (one pair)

0.5 hr.

*** SEE CONSIDERATIONS ON PAGE 20.

NOTE: An attached bimini is any top supported by framework and attached to either
the boat, a radar arch or another top at one end. A convertible top is any top supported
by framework that attaches to a windshield on the front edge. Times and materials
listed are for a base product with no zipper pockets, enclosure zippers, or any options.
This does not include convertible tops. These times are for the canvas top only; they
do not include manufacturing the frame or installing the frame on the boat.

» Attached Bimini and Enclosure

www.marinefabricatormag.com | 21

0121MF_19-31_TimeStand.indd 21

12/14/20 11:31 AM


http://www.marinefabricatormag.com

Marine Fabricator January/February 2021

Table of Contents for the Digital Edition of Marine Fabricator January/February 2021

Marine Fabricator January/February 2021 - Cover1
Marine Fabricator January/February 2021 - Cover2
Marine Fabricator January/February 2021 - 1
Marine Fabricator January/February 2021 - 2
Marine Fabricator January/February 2021 - 3
Marine Fabricator January/February 2021 - 4
Marine Fabricator January/February 2021 - 5
Marine Fabricator January/February 2021 - 6
Marine Fabricator January/February 2021 - 7
Marine Fabricator January/February 2021 - 8
Marine Fabricator January/February 2021 - 9
Marine Fabricator January/February 2021 - 10
Marine Fabricator January/February 2021 - 11
Marine Fabricator January/February 2021 - 12
Marine Fabricator January/February 2021 - 13
Marine Fabricator January/February 2021 - 14
Marine Fabricator January/February 2021 - 15
Marine Fabricator January/February 2021 - 16
Marine Fabricator January/February 2021 - 17
Marine Fabricator January/February 2021 - 18
Marine Fabricator January/February 2021 - 19
Marine Fabricator January/February 2021 - 20
Marine Fabricator January/February 2021 - 21
Marine Fabricator January/February 2021 - 22
Marine Fabricator January/February 2021 - 23
Marine Fabricator January/February 2021 - 24
Marine Fabricator January/February 2021 - 25
Marine Fabricator January/February 2021 - 26
Marine Fabricator January/February 2021 - 27
Marine Fabricator January/February 2021 - 28
Marine Fabricator January/February 2021 - 29
Marine Fabricator January/February 2021 - 30
Marine Fabricator January/February 2021 - 31
Marine Fabricator January/February 2021 - 32
Marine Fabricator January/February 2021 - 33
Marine Fabricator January/February 2021 - 34
Marine Fabricator January/February 2021 - 35
Marine Fabricator January/February 2021 - 36
Marine Fabricator January/February 2021 - 37
Marine Fabricator January/February 2021 - 38
Marine Fabricator January/February 2021 - 39
Marine Fabricator January/February 2021 - 40
Marine Fabricator January/February 2021 - 41
Marine Fabricator January/February 2021 - 42
Marine Fabricator January/February 2021 - 43
Marine Fabricator January/February 2021 - 44
Marine Fabricator January/February 2021 - Cover3
Marine Fabricator January/February 2021 - Cover4
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2025
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-tips-and-trends-supplement-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2022
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-january-february-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-november-december-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-september-october-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2021
https://www.nxtbook.com/ifai/marinefabricator/0121MF
https://www.nxtbook.com/ifai/marinefabricator/1120MF
https://www.nxtbook.com/ifai/marinefabricator/0920MF
https://www.nxtbook.com/ifai/marinefabricator/0720MF
https://www.nxtbook.com/ifai/marinefabricator/0520MF
https://www.nxtbook.com/ifai/marinefabricator/0320MF
https://www.nxtbook.com/ifai/marinefabricator/0120MF
https://www.nxtbook.com/ifai/marinefabricator/1119MF
https://www.nxtbook.com/ifai/marinefabricator/0919MF
https://www.nxtbook.com/ifai/marinefabricator/0719MF
https://www.nxtbook.com/ifai/marinefabricator/0519MF
https://www.nxtbook.com/ifai/marinefabricator/0319MF
https://www.nxtbook.com/ifai/marinefabricator/0119MF
https://www.nxtbook.com/ifai/marinefabricator/1118MF
https://www.nxtbook.com/ifai/marinefabricator/0918MF
https://www.nxtbook.com/ifai/marinefabricator/0718MF
https://www.nxtbook.com/ifai/marinefabricator/0518MF
https://www.nxtbook.com/ifai/marinefabricator/0318MF
https://www.nxtbook.com/ifai/marinefabricator/0118MF
https://www.nxtbookmedia.com