Marine Fabricator January/February 2021 - 30
OPTIONS FOR CUSHIONS AND SEATING
OTHER ACCESSORIES
Add patterning time
NOTE: Time includes cutting
and sewing only.
Add extra time for graphics and/or difficult graphics
HEADLINER
Add .25 hr. to 1 hr. per cushion for welt/piping
One hour per linear yard of fabric.
Add 2.5 hrs. for each new radius cornerboard
NOTE: Add extra time for unusual or difficult preparations and trim.
Add 25% to labor times for fabrics that require a pattern match
HULL LINER
Add .25 hr. for normal-style cutouts
One hour per linear yard of fabric.
Add .5 hr. for each beveled side
NOTE: Add extra time for unusual or difficult preparations and trim.
Add .5 to 1 hr. if cutting new foam
Add 2.5 hrs. for each new radius cornerboard
CARPET RUNNERS
All New does not include difficult frame building
One hour per linear yard of fabric.
Add time for installation
NOTE: Add extra time for steps and hatches.
Add time for taking out staples and re-stapling
FURNITURE SLIPCOVERS
» GLOSSARY OF UPHOLSTERY TERMS
STRETCHER, TACK STRIP,
LISTING, PULL: Strip of material sewn
into a seam on top of cushion, then
sewn or stapled to the bottom of
cushion to create and keep a shape
in the cushion.
WELT, PIPING: Cord wrapped
with a strip of material and sewn
into a seam for strength or
decorative purposes.
TOP SEW: Seam allowance is turned to
one side of the seam, then stitched to
the cushion panel or boxing. Stitching
is typically 1/8 " or ¼ " from seam.
DOUBLE TOP, BUTTERFLY SEAM:
Seam allowance is split. Each seam
allowance is top sewn to each side
of the seam. Typically 1/8 " or ¼ "
from seam.
Barrel chair
4 hrs.
L-shaped couch
10 hrs.
FURNITURE REUPHOLSTERY
Barrel chair
8-12 hrs.
Simple barstool seat
1 hr.
Couch
16-20 hrs.
L-shaped couch
16-20 hrs.
KNEE RISE CUSHION: Seat cushion
that has a section typically 6 " -7 " deep
and 1 " higher than the rest of the
cushion located along the front edge.
FRENCH SEAM: Sew the seam
wrong sides together, trim the
seam allowance, then sew the
same seam right sides together.
(Used in fitted sheets.)
ACCORD CLOTH, DUST CLOTH:
Lightweight material used to make
patterns on foam for cushions or seats.
BOX CUSHION: The cushion is
identified by a panel all around
the cushion.
NOTE: Add extra time for pattern-matching and difficult shapes.
ROLL AND PLEAT, TUCK AND ROLL:
Technique for sewing strips of vinyl
together and to ½ " foam at the same
time to create a quilted stripe pattern.
Similar to heat sealed roll and pleat.
WATERFALL, BULLNOSE FRONT:
A waterfall front or bullnose has a
rolled front, or has fabric rolled over
the edge with no seam.
DRAPERIES
CORNICES
Recover Existing
.25-hour per foot
All New
.50-hour per foot
NOTE: Add extra time for pleated and shirred faces.
Flat using tapes
.50-hour per foot of width
Pleated top
.75-hour per foot of width
Pleated top and bottom
1 hour per foot of width
Angle-pleated panel top
3 hrs.
Angle-pleated panel top
6 hrs.
and bottom
NOTE: Add extra time for curved panels, cutouts and accent trims.
BEDDING ACCESSORIES
» Box Cushion
Twin
Queen or
V-Berth
2.5 hrs.
4 hrs.
Fitted spread
3 hrs.
3.5 hrs.
Pillow sham
Throw-style spread
1.5 hrs.
2 hrs.
Fitted sheets set
2 hrs.
2 hrs.
Altered mattress pad
2 hrs.
2.5 hrs.
NOTE: Add extra time for difficult shapes, cutouts and inside corners.
NOTE: Deduct .75 hrs. from spread times if panels are already matched
and sewn.
NOTE: Add extra time for fancy or detailed trimmings.
» Waterfall, Bullnose Front
30 Marine Fabricator | Jan/Feb 2021
0121MF_19-31_TimeStand.indd 30
12/14/20 11:32 AM
Marine Fabricator January/February 2021
Table of Contents for the Digital Edition of Marine Fabricator January/February 2021
Marine Fabricator January/February 2021 - Cover1
Marine Fabricator January/February 2021 - Cover2
Marine Fabricator January/February 2021 - 1
Marine Fabricator January/February 2021 - 2
Marine Fabricator January/February 2021 - 3
Marine Fabricator January/February 2021 - 4
Marine Fabricator January/February 2021 - 5
Marine Fabricator January/February 2021 - 6
Marine Fabricator January/February 2021 - 7
Marine Fabricator January/February 2021 - 8
Marine Fabricator January/February 2021 - 9
Marine Fabricator January/February 2021 - 10
Marine Fabricator January/February 2021 - 11
Marine Fabricator January/February 2021 - 12
Marine Fabricator January/February 2021 - 13
Marine Fabricator January/February 2021 - 14
Marine Fabricator January/February 2021 - 15
Marine Fabricator January/February 2021 - 16
Marine Fabricator January/February 2021 - 17
Marine Fabricator January/February 2021 - 18
Marine Fabricator January/February 2021 - 19
Marine Fabricator January/February 2021 - 20
Marine Fabricator January/February 2021 - 21
Marine Fabricator January/February 2021 - 22
Marine Fabricator January/February 2021 - 23
Marine Fabricator January/February 2021 - 24
Marine Fabricator January/February 2021 - 25
Marine Fabricator January/February 2021 - 26
Marine Fabricator January/February 2021 - 27
Marine Fabricator January/February 2021 - 28
Marine Fabricator January/February 2021 - 29
Marine Fabricator January/February 2021 - 30
Marine Fabricator January/February 2021 - 31
Marine Fabricator January/February 2021 - 32
Marine Fabricator January/February 2021 - 33
Marine Fabricator January/February 2021 - 34
Marine Fabricator January/February 2021 - 35
Marine Fabricator January/February 2021 - 36
Marine Fabricator January/February 2021 - 37
Marine Fabricator January/February 2021 - 38
Marine Fabricator January/February 2021 - 39
Marine Fabricator January/February 2021 - 40
Marine Fabricator January/February 2021 - 41
Marine Fabricator January/February 2021 - 42
Marine Fabricator January/February 2021 - 43
Marine Fabricator January/February 2021 - 44
Marine Fabricator January/February 2021 - Cover3
Marine Fabricator January/February 2021 - Cover4
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2025
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-tips-and-trends-supplement-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2022
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-january-february-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-november-december-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-september-october-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2021
https://www.nxtbook.com/ifai/marinefabricator/0121MF
https://www.nxtbook.com/ifai/marinefabricator/1120MF
https://www.nxtbook.com/ifai/marinefabricator/0920MF
https://www.nxtbook.com/ifai/marinefabricator/0720MF
https://www.nxtbook.com/ifai/marinefabricator/0520MF
https://www.nxtbook.com/ifai/marinefabricator/0320MF
https://www.nxtbook.com/ifai/marinefabricator/0120MF
https://www.nxtbook.com/ifai/marinefabricator/1119MF
https://www.nxtbook.com/ifai/marinefabricator/0919MF
https://www.nxtbook.com/ifai/marinefabricator/0719MF
https://www.nxtbook.com/ifai/marinefabricator/0519MF
https://www.nxtbook.com/ifai/marinefabricator/0319MF
https://www.nxtbook.com/ifai/marinefabricator/0119MF
https://www.nxtbook.com/ifai/marinefabricator/1118MF
https://www.nxtbook.com/ifai/marinefabricator/0918MF
https://www.nxtbook.com/ifai/marinefabricator/0718MF
https://www.nxtbook.com/ifai/marinefabricator/0518MF
https://www.nxtbook.com/ifai/marinefabricator/0318MF
https://www.nxtbook.com/ifai/marinefabricator/0118MF
https://www.nxtbookmedia.com