Marine Fabricator January/February 2022 - 33

MOORING / TRAVEL / WINTER COVER
Length (In Feet) 9'
15'
18'
21' 24'
27'
30' 30'+
» Mooring Cover
2 widths of fabric 6 hrs. 7 hrs. 8 hrs. 9 hrs. 10 hrs. 11 hrs. 12 hrs. 13 hrs. +
3 widths of fabric 12 hrs. 13 hrs. 14 hrs. 15 hrs. 16 hrs. 17 hrs. 18 hrs. 19 hrs. +
4 widths of fabric 14 hrs. 15 hrs. 16 hrs. 17 hrs. 18 hrs. 19 hrs. 20 hrs. 20 hrs. +
OPTIONS
Length (In Feet) 9'
REINFORCING PATCH
Small
Medium
Large
» Travel/Storage Cover
CUTOUT
Easy
Diffi cult
Mooring
pole assembly
0.25 hr.
0.5 hr.
1 hr.
0.5 hr.
1.5 hr.
0.25 hr.
Pulpit and bow rail 3 hrs.
Bow rail only
Fitted panel
Tie Straps
(per strap)
» Winter Cover
2 hrs.
1.5 hrs.
0.25 hr.
*** SEE CONSIDERATIONS ON PAGE 28.
NOTE: Mooring and travel covers cover the entire boat all
the way to the rub rail. A mooring cover, however, usually
is fastened with fasteners, while a travel cover attaches via
a drawstring and tie-downs. The basic times do not include
any of the options listed.
FLYBRIDGE COVER
Length (In Feet)
8' width
10' width
15' width
20' width
OPTIONS
Length (In Feet)
Fitted and Shaped Panels
Mooring Pole Assembly
CUTOUT
Easy
Medium
Diffi cult
REINFORCING PATCH
Small
Medium
Large
VENTURI STYLE
Easy
Medium
Diffi cult
*** SEE CONSIDERATIONS ON PAGE 28.
www.marinefabricatormag.com | 33
6'
5 hrs.
6 hrs.
7.5 hrs.
9 hrs.
9'
6.5 hrs.
7.5 hrs.
9 hrs.
10.5 hrs.
12'
8 hrs.
9 hrs.
10.5 hrs.
12 hrs.
15'
9 hrs.
10.5 hrs.
12 hrs.
14 hrs.
18'
10 hrs.
12 hrs.
14 hrs.
16 hrs.
1.5 hrs.
0.25 hr.
2.5 hrs.
3 hrs.
4 hrs.
0.5 hr.
1.25 hrs.
2.25 hrs.
0.25 hr.
0.5 hr.
1 hr.
2 hrs.
3 hrs.
4 hrs.
NOTE: Flybridge covers are storage covers for when the
boat is not in use. They cover the entire fl ybridge and often
use the same hardware as an enclosure. These covers can
often have more of a complex shape due to railings and
windshields. The basic times do not include any of the
options listed.
http://www.marinefabricatormag.com

Marine Fabricator January/February 2022

Table of Contents for the Digital Edition of Marine Fabricator January/February 2022

Marine Fabricator January/February 2022 - Cover1
Marine Fabricator January/February 2022 - Cover2
Marine Fabricator January/February 2022 - 1
Marine Fabricator January/February 2022 - 2
Marine Fabricator January/February 2022 - 3
Marine Fabricator January/February 2022 - 4
Marine Fabricator January/February 2022 - 5
Marine Fabricator January/February 2022 - 6
Marine Fabricator January/February 2022 - 7
Marine Fabricator January/February 2022 - 8
Marine Fabricator January/February 2022 - 9
Marine Fabricator January/February 2022 - 10
Marine Fabricator January/February 2022 - 11
Marine Fabricator January/February 2022 - 12
Marine Fabricator January/February 2022 - 13
Marine Fabricator January/February 2022 - 14
Marine Fabricator January/February 2022 - 15
Marine Fabricator January/February 2022 - 16
Marine Fabricator January/February 2022 - 17
Marine Fabricator January/February 2022 - 18
Marine Fabricator January/February 2022 - 19
Marine Fabricator January/February 2022 - 20
Marine Fabricator January/February 2022 - 21
Marine Fabricator January/February 2022 - 22
Marine Fabricator January/February 2022 - 23
Marine Fabricator January/February 2022 - 24
Marine Fabricator January/February 2022 - 25
Marine Fabricator January/February 2022 - 26
Marine Fabricator January/February 2022 - 27
Marine Fabricator January/February 2022 - 28
Marine Fabricator January/February 2022 - 29
Marine Fabricator January/February 2022 - 30
Marine Fabricator January/February 2022 - 31
Marine Fabricator January/February 2022 - 32
Marine Fabricator January/February 2022 - 33
Marine Fabricator January/February 2022 - 34
Marine Fabricator January/February 2022 - 35
Marine Fabricator January/February 2022 - 36
Marine Fabricator January/February 2022 - 37
Marine Fabricator January/February 2022 - 38
Marine Fabricator January/February 2022 - 39
Marine Fabricator January/February 2022 - 40
Marine Fabricator January/February 2022 - 41
Marine Fabricator January/February 2022 - 42
Marine Fabricator January/February 2022 - 43
Marine Fabricator January/February 2022 - 44
Marine Fabricator January/February 2022 - 45
Marine Fabricator January/February 2022 - 46
Marine Fabricator January/February 2022 - 47
Marine Fabricator January/February 2022 - 48
Marine Fabricator January/February 2022 - Cover3
Marine Fabricator January/February 2022 - Cover4
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2025
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-tips-and-trends-supplement-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2024
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-july-august-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-may-june-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-march-april-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-january-february-2023
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-november-december-2022
https://www.nxtbook.com/ata/marinefabricator/marine-fabricator-september-october-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-january-february-2022
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-november-december-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-september-october-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-july-august-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-may-june-2021
https://www.nxtbook.com/ifai/marinefabricator/marine-fabricator-march-april-2021
https://www.nxtbook.com/ifai/marinefabricator/0121MF
https://www.nxtbook.com/ifai/marinefabricator/1120MF
https://www.nxtbook.com/ifai/marinefabricator/0920MF
https://www.nxtbook.com/ifai/marinefabricator/0720MF
https://www.nxtbook.com/ifai/marinefabricator/0520MF
https://www.nxtbook.com/ifai/marinefabricator/0320MF
https://www.nxtbook.com/ifai/marinefabricator/0120MF
https://www.nxtbook.com/ifai/marinefabricator/1119MF
https://www.nxtbook.com/ifai/marinefabricator/0919MF
https://www.nxtbook.com/ifai/marinefabricator/0719MF
https://www.nxtbook.com/ifai/marinefabricator/0519MF
https://www.nxtbook.com/ifai/marinefabricator/0319MF
https://www.nxtbook.com/ifai/marinefabricator/0119MF
https://www.nxtbook.com/ifai/marinefabricator/1118MF
https://www.nxtbook.com/ifai/marinefabricator/0918MF
https://www.nxtbook.com/ifai/marinefabricator/0718MF
https://www.nxtbook.com/ifai/marinefabricator/0518MF
https://www.nxtbook.com/ifai/marinefabricator/0318MF
https://www.nxtbook.com/ifai/marinefabricator/0118MF
https://www.nxtbookmedia.com