WIRE MESH TRAY SWEEPS SWK & EZ BN 1/4 / CE 25 / ED 275 A B 1 2 * Sweeps can be formed easily on site by cutting some of the side and bottom wires. Use the SWK method to secure desired curve. * Always place bolt heads to inside of tray to prevent frayed wires. x2 2 " (50 mm) x2 x2 x2 7.5 " 190 mm R 5.5 " 140 mm * Use bolt cutters to fabricate this part from ED275. x3 x4 EZ BN 1/4 CE 25 x4 x1 ED 275* See pgs. A.20, A.57 4 " (100 mm) x3 x3 12.6 " 320 mm x2 EZ BN 1/4 CE 25 x3 x3 x3 x2 x1 ED 275* R 8.7 " 220 mm See pgs. A.20, A.57 6 " (150 mm) x3 17.7 " 450 mm x3 x2 EZ BN 1/4 CE 25 x2 x1 ED 275* x3 x3 x3 8 " (200 mm) 17.7 " 450 mm R 11.8 " 300 mm x2 x1 SWK x2 x4 R 9.8 " 250 mm x4 x4 x4 WWW.LEGRAND.US/CABLOFIL EZ BN 1/4 CE 25 x2 x1 ED 275* See pgs. A.18, A.20, A.57 A.79 See pgs. A.20, A.57 INSTALLATIONShttp://WWW.LEGRAND.US/CABLOFIL