Engineering Inc. - May/June 2007 - 28
AC E C 2 0 0 7 EnginEE ring Ex CE ll EnCE AwArds h Perry Street Bridge Replacement, Napoleon, Ohio HNTB Ohio, Inc.—Cleveland, Ohio h GRANDAwARDs Mokelumne River Project, Woodbridge, Calif. Winzler & Kelly Consulting Engineers—Santa Rosa, Calif. The new 167-foot-long fish passage facility on the Mokelumne River in Northern California is a model for fish passages worldwide. For decades the river was a well-known Coho salmon and steelhead migratory stream. A series of irrigation dams built since 1910 contained crude fish ladders to mitigate migration, which over time became less and less effective. By 1995 no steelhead were counted, and the salmon run was nearly nonexistent. The project team designed the new facility to include pneumatically operated steel gates and three state-of-the-art high- and low-water fish ladders. In the facility’s first year of operation, more than 16,000 salmon passed through the new ladders, and 180 steelhead returned to their upstream hatchery beds. h The new Perry Street Bridge is a larger, safer and more efficient version of the 1930 landmark it replaced, yet it maintains the original historic design and role as the city’s visual focal point. Time and deterioration had left the original bridge an antiquated two-lane structure that stifled the region’s transportation capabilities. The project team used a unique combination of pre-cast and pre-stressed concrete arch construction schemes to match the original artistry, in addition to drilling through existing piers to allow construction without disturbing the river bottom. The now fourlane Perry Street Bridge successfully incorporates the historic design elements of its predecessor with improved transportation flow and safety for 16,000 daily motorists. WaMu Center/ Seattle Art Museum Expansion, Seattle, Wash. Magnusson Klemencic Associates—Seattle, Wash. The new WaMu Center/ Seattle Art Museum is a gleaming 540-foot-tall office building that houses 4,000 employees for the nation’s fifth largest bank, as well as four floors of Seattle’s most prestigious art collection, in cohesive harmony despite severe space restrictions. To compensate for the narrow building footprint, the project team incorporated a new structural system—Performance-Based Seismic Design— which avoided the need for a bulky perimeter frame. The result expedited construction, increased layout flexibility and reduced the overall project cost. 28 ENGINEERING INC. MAY / JUNE 2007 h West Side Combined Sewer Overflow Project, Portland, Ore. Parsons Brinckerhoff— Portland, Ore. In response to a state mandate to reduce combined sewer overflow (CSO) discharges into Portland’s Willamette River, the project team designed a 3.4-mile-long, 14-foot-diameter tunnel that crosses under the river to connect to a 160-foot-deep, 220-million-gallonsa-day pump station. The project also includes five 100- to 150-foot-deep shafts to connect the city’s current combined sewer system and the new tunnel to channel sewage and peak storm water flows. Large-diameter slurry-mix-shield tunnel boring machines—the first application of the technology in the U.S.—were used to tunnel through the saturated soils alongside and beneath the river. The project reduces the amount of CSO discharges into the Willamette River, provides a cleaner water resource, increases water-themed recreational opportunities and allows native fish species to thrive.
Engineering Inc. - May/June 2007
Table of Contents for the Digital Edition of Engineering Inc. - May/June 2007
Table of Contents
From ACEC to You
News & Notes
Market Watch
Legislative Ac tion
Interview with Congressman James Oberstar
Port Security
Water: Managing our Precious Commodity
Engineering Excellence Awards
“Smart” Concrete
Business Insights
Members in the News
One on One
Engineering Inc. - May/June 2007 - Cover1
Engineering Inc. - May/June 2007 - Cover2
Engineering Inc. - May/June 2007 - Table of Contents
Engineering Inc. - May/June 2007 - From ACEC to You
Engineering Inc. - May/June 2007 - 3
Engineering Inc. - May/June 2007 - News & Notes
Engineering Inc. - May/June 2007 - 5
Engineering Inc. - May/June 2007 - Market Watch
Engineering Inc. - May/June 2007 - 7
Engineering Inc. - May/June 2007 - Legislative Ac tion
Engineering Inc. - May/June 2007 - 9
Engineering Inc. - May/June 2007 - Interview with Congressman James Oberstar
Engineering Inc. - May/June 2007 - 11
Engineering Inc. - May/June 2007 - 12
Engineering Inc. - May/June 2007 - 13
Engineering Inc. - May/June 2007 - Port Security
Engineering Inc. - May/June 2007 - 15
Engineering Inc. - May/June 2007 - 16
Engineering Inc. - May/June 2007 - 17
Engineering Inc. - May/June 2007 - 18
Engineering Inc. - May/June 2007 - 19
Engineering Inc. - May/June 2007 - 20
Engineering Inc. - May/June 2007 - 21
Engineering Inc. - May/June 2007 - Water: Managing our Precious Commodity
Engineering Inc. - May/June 2007 - 23
Engineering Inc. - May/June 2007 - 24
Engineering Inc. - May/June 2007 - 25
Engineering Inc. - May/June 2007 - Engineering Excellence Awards
Engineering Inc. - May/June 2007 - 27
Engineering Inc. - May/June 2007 - 28
Engineering Inc. - May/June 2007 - 29
Engineering Inc. - May/June 2007 - 30
Engineering Inc. - May/June 2007 - 31
Engineering Inc. - May/June 2007 - 32
Engineering Inc. - May/June 2007 - 33
Engineering Inc. - May/June 2007 - 34
Engineering Inc. - May/June 2007 - 35
Engineering Inc. - May/June 2007 - 36
Engineering Inc. - May/June 2007 - 37
Engineering Inc. - May/June 2007 - “Smart” Concrete
Engineering Inc. - May/June 2007 - 39
Engineering Inc. - May/June 2007 - Business Insights
Engineering Inc. - May/June 2007 - 41
Engineering Inc. - May/June 2007 - Members in the News
Engineering Inc. - May/June 2007 - 43
Engineering Inc. - May/June 2007 - 44
Engineering Inc. - May/June 2007 - 45
Engineering Inc. - May/June 2007 - 46
Engineering Inc. - May/June 2007 - 47
Engineering Inc. - May/June 2007 - One on One
Engineering Inc. - May/June 2007 - Cover3
Engineering Inc. - May/June 2007 - Cover4
https://www.nxtbook.com/nxtbooks/acec/engineeringinc_spring2020
https://www.nxtbook.com/nxtbooks/acec/engineeringinc_winter2020
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1119
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0919
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0719
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0519
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0319
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0119
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1118
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0918
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0718
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0518
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0318
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0118
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1117
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0917
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0717
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0517
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0317
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0117
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1116
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0916
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0716
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0516
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0316
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0116
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1115
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0915
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0715
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0515
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0315
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0115
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1114
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0914
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0714
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0514
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0314
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0114
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1113
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0913
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0713
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0513
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0313
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0113
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1112
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0912
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0712
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0512
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0312
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0112
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1111
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0911
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0711
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0511
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0311
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0111
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1110
https://www.nxtbook.com/nxtbooks/acec/engineeringincSeptOct
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0910
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0710
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0510
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0310
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0110
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1109
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0909
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0709
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0309
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0109_v2
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0109
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1108
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0908
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0708
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0508
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0308
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0108
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1107
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0907
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0707
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0507
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0307
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0107
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0505
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0305
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1105
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0306
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0105
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1103
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0906
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0903
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0703
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0106
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0506
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0503
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0303
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0904
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1104
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0704
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0504
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0304
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0905
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0705
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0104
https://www.nxtbook.com/nxtbooks/acec/engineeringinc1106
https://www.nxtbook.com/nxtbooks/acec/engineeringinc0706
https://www.nxtbookmedia.com