Historically, simul-frac operations have utilized two complete frac spreads. Universal's process, however, utilizes one enhanced frac spread to provide an increase in overall rate to the pumping system to be evenly split between both wells. The results speak for themselves: 51% LATERAL FEET TREATED/DAY G geoLOGY 22% 35% HORSEPOWER PER WELLBORE DAYS ON PAD * Well PRODUCTION BROUGHT FORWARD - EARLY CASH FLOW * OPTIMIZED HORSEPOWER, CREW AND R&M, EQUIPMENT UTILIZATION * OVERALL EFFICIENCY GAINS FOR THE RIGHT CANDIDATE WELLS G geometry L LOGISTICS Past performance does not guarantee future results. Results may vary. patenergy.com/universalhttp://www.patenergy.com/universal