Energy-Efficient Lighting Controls stop energy waste Alameda County Juvenile Justice Center San Leandro, CA Applying for LEED Gold I specified Watt Stopper/Legrand's Lighting Integrator system for this project because of its proven reliability and ability to handle the integration of the lighting control system with the BAS. The Lighting Integrator BACnet solution worked right out of the box. Todd Mazza, Senior Project Manager, Rosendin Electric Lighting Integrator lighting control panels offer the convenience of schedule-based control combined with the customization flexibility to match applications of any size and complexity. Maximize energy savings using a multi-level control strategy approach and seamless integration with occupancy sensors, daylighting controllers and external building management systems. � � � � Grouping loads for common control Automatic time out of after hour overrides No proprietary configuration tools required Set up using standard BACnet objects and BACnet compliant workstation Get information on Lighting Integrator Automation Level or Complete Control and a comprehensive product selection guide. 800.879.8585 | www.wattstopper.com/psg Complete lighting control solutions for every building. Occupancy and Vacancy Controls | Daylighting Controls | Lighting Control Panels | Wireless RF Lighting Controls www.info.hotims.com/16018-63 Photo credit: John Swain/Photographer, HOK, and Beverly Prior Architects
Contents |
Contents |