TECHNICAL FEATURE

TABLE 3 Sample checklist of the primary control-sequence issues the CxA should

TABLE 4 Sample checklist of the plumbing concerns the CxA should review during DPC.

Control schematics and sequences must be clearly written and specific to
the system, equipment, application, and operations. Control sequences should
1
be written in step-by-step form, using simple, clear, and concise language.
Sequences must cover all foreseeable scenarios, including life-safety events.

1 sitated by the specified water fixture units (WFUs) and drainage fixture units

check during DPC.

Plumbing pipes and equipment sizes must match the requirements neces(DFUs).

2

Water pressure (and any pressure boosters) must be sufficient for the system
configuration, building height, and fixture types.

2 and shut-down, as well as how to handle equipment failure during power loss

3

Verify the need for (and specification of) expansion tanks and/or recirculating
pumps.

Pressurization sequences and equipment components must be appropriate for
the application.

4

Verify that hot-water circulating pumps will have balance valves and pressuregauge test ports.

5

Verify that plumbing systems will be able to handle high-occupancy loads
during special events.

Sequences must specify proper control procedures for equipment start-up
or malfunction.

3

4 Temperature and pressure reset sequences must be described in detail.

* Inadequately defined building pressurization sequences; and
* Failure to specify temperature and pressure reset sequences.
Table 3 is a sample checklist of the primary control
sequence issues the CxA should check during DPC.

TABLE 5 Sample checklist of electrical-system factors the CxA should review

during DPC.

1

Verify electrical/mechanical design coordination, including equipment location,
voltage, and load and control specifications.
Verify all standby/emergency power requirements, including the redundancy

2 approach. Ensure that proper need and control strategies are in place for

backing up different levels of standby power.

3

Plumbing Design Review
Plumbing is usually not as prone to problems as
other mechanical areas (perhaps due to the many code
requirements plumbing systems must satisfy). But
plumbing-related issues can prove problematic and
should be validated by the CxA, including:
* Improperly sized fixture inlets;
* Inadequate water pressure from supply source;
* Lack of expansion tanks on closed systems; and
* Failure to consider peak loads during special events.
Table 4 is a sample checklist of the plumbing concerns
the CxA should review during DPC.

Ensure that proper lighting-control designs and associated control strategies
are in place.

4

Verify correct fire-alarm sequences and interlocks are defined for specific lifesafety operations, such as standard alarming, shut-downs, smoke exhaust, etc.

5

Ensure that motor controls, starters, and variable frequency drives (VFDs) are
coordinated with the appropriate mechanical systems.

Verify that the specifications call for full-power electrical-system quality
testing, including:
* Current load balance on each leg.
6
* Current to ground measurements.
* Voltage balance on each leg.
* Current and voltage total harmonic distortion (THD).

Commissioning-related electrical issues can have
a major impact on whether a building can satisfy
owner expectations. We've seen many problems that
seem to surface repeatedly, including:
* Failure to coordinate electrical panels with mechanical and/or architectural components;
* Improperly sized emergency generators;
* Incorrectly performed generator testing procedures;
* Improperly performed electrical power quality testing and connector adequacy testing; and
* Different electrical specifications for mechanical
equipment and electrical service voltages.
Table 5 is a sample checklist of electrical system factors
the CxA should review during DPC.
56

ashraE JourNal

ashrae.org

FEBRUARY 2014

Ensure that project documents call for load tests of uninterruptible power
system (UPS) equipment and battery discharge rates.

8

Verify that the documents call for an 8- to 12-hour standby/emergency
generator performance test using an appropriate load bank.

9

Electrical System Design Review

7

Ensure that connected-lighting load-density specifications do not exceed code
or LEED limits.
Verify that the documents specify permanent service-usage labels for all

10 electrical equipment and that all panel-board schedules are to be filled out at

project completion.

Ensure that the specifications call for all power connections over 5 horsepower

11 be photographed with a thermal-imaging camera while operating under full

load to identify "hot spots" and improper connections.

Project Design Manual
During DPC, the CxA should collaborate with the
owner and the design team to decide which documents
will be included in the project design manual (PDM) (or
"systems manual" within the LEED community). While
every project will have its own unique design manual,
certain documents should be included in every PDM.
In addition to the final OPR, BOD, and commissioning
plan, the PDM should include:



ASHRAE Journal - February 2014

Table of Contents for the Digital Edition of ASHRAE Journal - February 2014

ASHRAE Journal - February 2014
Contents
Commentary
Industry News
Letters
Meetings and Shows
Feature Articles
Understanding Salaries in the A/E Industry
Improving Operating Room Contamination Control
Standing Columns
Engineer's Notebook
Saving Energy with Cooling Towers
Building Sciences
ACREX India 2014 Show Guide
HVAC Applications
Technical vs. Process Commissioning: Design Phase Commissioning
Data Centers
IAQ Applications
Energy Modeling
InfoCenter
Refrigeration Applications
Products
Classified Advertising
Advertisers Index
ASHRAE Journal - February 2014 - ASHRAE Journal - February 2014
ASHRAE Journal - February 2014 - Cover2
ASHRAE Journal - February 2014 - 1
ASHRAE Journal - February 2014 - 2
ASHRAE Journal - February 2014 - Contents
ASHRAE Journal - February 2014 - Commentary
ASHRAE Journal - February 2014 - 5
ASHRAE Journal - February 2014 - Industry News
ASHRAE Journal - February 2014 - 7
ASHRAE Journal - February 2014 - 8
ASHRAE Journal - February 2014 - Letters
ASHRAE Journal - February 2014 - Meetings and Shows
ASHRAE Journal - February 2014 - 11
ASHRAE Journal - February 2014 - Understanding Salaries in the A/E Industry
ASHRAE Journal - February 2014 - 13
ASHRAE Journal - February 2014 - 14
ASHRAE Journal - February 2014 - 15
ASHRAE Journal - February 2014 - 16
ASHRAE Journal - February 2014 - 17
ASHRAE Journal - February 2014 - Improving Operating Room Contamination Control
ASHRAE Journal - February 2014 - 19
ASHRAE Journal - February 2014 - 20
ASHRAE Journal - February 2014 - 21
ASHRAE Journal - February 2014 - 22
ASHRAE Journal - February 2014 - 23
ASHRAE Journal - February 2014 - 24
ASHRAE Journal - February 2014 - 25
ASHRAE Journal - February 2014 - 26
ASHRAE Journal - February 2014 - 27
ASHRAE Journal - February 2014 - Engineer's Notebook
ASHRAE Journal - February 2014 - 29
ASHRAE Journal - February 2014 - 30
ASHRAE Journal - February 2014 - 31
ASHRAE Journal - February 2014 - 32
ASHRAE Journal - February 2014 - 33
ASHRAE Journal - February 2014 - Saving Energy with Cooling Towers
ASHRAE Journal - February 2014 - 35
ASHRAE Journal - February 2014 - 36
ASHRAE Journal - February 2014 - 37
ASHRAE Journal - February 2014 - 38
ASHRAE Journal - February 2014 - 39
ASHRAE Journal - February 2014 - 40
ASHRAE Journal - February 2014 - 41
ASHRAE Journal - February 2014 - Building Sciences
ASHRAE Journal - February 2014 - 43
ASHRAE Journal - February 2014 - 44
ASHRAE Journal - February 2014 - 45
ASHRAE Journal - February 2014 - 46
ASHRAE Journal - February 2014 - 47
ASHRAE Journal - February 2014 - 48
ASHRAE Journal - February 2014 - ACREX India 2014 Show Guide
ASHRAE Journal - February 2014 - SCover2
ASHRAE Journal - February 2014 - S1
ASHRAE Journal - February 2014 - S2
ASHRAE Journal - February 2014 - S3
ASHRAE Journal - February 2014 - S4
ASHRAE Journal - February 2014 - S5
ASHRAE Journal - February 2014 - S6
ASHRAE Journal - February 2014 - S7
ASHRAE Journal - February 2014 - S8
ASHRAE Journal - February 2014 - S9
ASHRAE Journal - February 2014 - S10
ASHRAE Journal - February 2014 - S11
ASHRAE Journal - February 2014 - S12
ASHRAE Journal - February 2014 - S13
ASHRAE Journal - February 2014 - S14
ASHRAE Journal - February 2014 - S15
ASHRAE Journal - February 2014 - S16
ASHRAE Journal - February 2014 - S17
ASHRAE Journal - February 2014 - S18
ASHRAE Journal - February 2014 - S19
ASHRAE Journal - February 2014 - S20
ASHRAE Journal - February 2014 - S21
ASHRAE Journal - February 2014 - SCover4
ASHRAE Journal - February 2014 - HVAC Applications
ASHRAE Journal - February 2014 - 50
ASHRAE Journal - February 2014 - 51
ASHRAE Journal - February 2014 - Technical vs. Process Commissioning: Design Phase Commissioning
ASHRAE Journal - February 2014 - 53
ASHRAE Journal - February 2014 - 54
ASHRAE Journal - February 2014 - 55
ASHRAE Journal - February 2014 - 56
ASHRAE Journal - February 2014 - 57
ASHRAE Journal - February 2014 - Data Centers
ASHRAE Journal - February 2014 - 59
ASHRAE Journal - February 2014 - 60
ASHRAE Journal - February 2014 - 61
ASHRAE Journal - February 2014 - IAQ Applications
ASHRAE Journal - February 2014 - 63
ASHRAE Journal - February 2014 - 64
ASHRAE Journal - February 2014 - 65
ASHRAE Journal - February 2014 - 66
ASHRAE Journal - February 2014 - 67
ASHRAE Journal - February 2014 - Energy Modeling
ASHRAE Journal - February 2014 - 69
ASHRAE Journal - February 2014 - InfoCenter
ASHRAE Journal - February 2014 - 71
ASHRAE Journal - February 2014 - 72
ASHRAE Journal - February 2014 - 73
ASHRAE Journal - February 2014 - Refrigeration Applications
ASHRAE Journal - February 2014 - 75
ASHRAE Journal - February 2014 - Products
ASHRAE Journal - February 2014 - 77
ASHRAE Journal - February 2014 - 78
ASHRAE Journal - February 2014 - Classified Advertising
ASHRAE Journal - February 2014 - Advertisers Index
ASHRAE Journal - February 2014 - Cover3
ASHRAE Journal - February 2014 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FYONLJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2024november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2024november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BDMHLG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WJDGRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ATMAHK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHQRAW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XGMDXI
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_YELQLJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QJLWMC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com