ASHRAE Journal - September 2023 - 46
TECHNICAL FEATURE
FIGURE 1 Parking garage daylight transition zone, Natick, Mass.
Exterior Lighting Power
Multiple changes were made to exterior lighting
requirements in Table 9.4.2-2 (addendum am). First,
a column was added to the table directly stating which
exterior lighting control(s) apply to each exterior
application. This change improved the clarity of the
code because no changes were made to the existing
exterior lighting control requirements.
Addendum am also reduced the exterior lighting
This power rating change does not directly save
energy. The power requirements save energy. This
power rating in track was necessary to reflect the
change in technology. This change to line-voltage track
allows for track projects to meet these new reduced
lighting power requirements in the prescriptive
sections.
Lighting Exceptions
Additional lighting power exceptions were added
to the existing list in Section 9. Some equipment is
not included within the power calculations when
determining the lighting power allowance for a site
(Section 9.2.2.1). Table 9.2.2.1 lists the equipment
that is exempted and the required lighting controls.
Standard 90.1-2022 recognized germicidal luminaires.
If a luminaire uses light or ultraviolet light for
germicidal function to disinfect spaces, the power for
the germicidal function does not need to be included
in the lighting power budget calculations. Note that
in a dual-function luminaire (e.g., general lighting
and UVC lighting), only the power for the germicidal
function is exempt.
Addendum ac also removed the previous
exception for lighting in casinos and the
daylight transition zone in parking garages
(Figure 1) because new lighting power
requirements for both casinos as well as the
daylight transition zone in parking garages were
added into Standard 90.1-2022.
46
ASHRAE JOURNAL ashrae.org S E PTEM B ER 2023
power values by close to 30%. The values in this table
had not been modified since the 2016 version during
which time LED products have improved and design
practices have changed.
Table 1 includes a sample of these new exterior
lighting power density values from Standard
90.1-2022. Within the standard, exterior lighting is
based on zones. The zones range from Zone 0 (national
park and should be dark) to Zone 4 (major urban
commercial core like Times Square or Las Vegas Strip).
Values in Table 1 are for Zone 3. All the values in the
exterior lighting table changed in similar proportions
as shown in Table 1.
The exterior area, stairway, was removed from Table
9.4.2-2 because it was deemed hard to define in terms
of what the area actually is to be illuminated, i.e.,
is it the stair treads only, the area before and after
the stairs, etc. Exempting the area addressed the
compliance issues at hand.
Guest Room Controls
Standard 90.1 now requires all lighting and switched
receptacles in guest rooms and suites in hotels,
motels, boarding houses and/or similar buildings to
be automatically controlled and turned off after 20
minutes of the space becoming unoccupied (Section
9.4.1.3). Previously the standard allowed spaces with
key card controls to be exempt. Standard 90.1-2022
removed the exception for key cards and explicitly
stated that card key controls could not be used to
TABLE 1 Sample exterior lighting power density values, Standards 90.1-2016, 2019, and 2023.
EXTERIOR AREAS (ZONE 3)
Parking Areas
90.1-2016,
W/ft2
Sales Canopy
Open Outdoor Sales
Loading Docks
0.06
0.60
0.20
0.35
90.1-2019,
W/ft2
0.06
0.60
0.20
0.35
90.1-2023,
W/ft2
0.037
0.50
0.180
0.260
MICHAEL MYER
http://www.ashrae.org
ASHRAE Journal - September 2023
Table of Contents for the Digital Edition of ASHRAE Journal - September 2023
Table of contents
ASHRAE Journal - September 2023 - Intro
ASHRAE Journal - September 2023 - Cover1
ASHRAE Journal - September 2023 - Cover2
ASHRAE Journal - September 2023 - 1
ASHRAE Journal - September 2023 - Table of contents
ASHRAE Journal - September 2023 - 3
ASHRAE Journal - September 2023 - 4
ASHRAE Journal - September 2023 - 5
ASHRAE Journal - September 2023 - 6
ASHRAE Journal - September 2023 - 7
ASHRAE Journal - September 2023 - 8
ASHRAE Journal - September 2023 - 9
ASHRAE Journal - September 2023 - 10
ASHRAE Journal - September 2023 - 11
ASHRAE Journal - September 2023 - 12
ASHRAE Journal - September 2023 - 13
ASHRAE Journal - September 2023 - 14
ASHRAE Journal - September 2023 - 15
ASHRAE Journal - September 2023 - 16
ASHRAE Journal - September 2023 - 17
ASHRAE Journal - September 2023 - 18
ASHRAE Journal - September 2023 - 19
ASHRAE Journal - September 2023 - 20
ASHRAE Journal - September 2023 - 21
ASHRAE Journal - September 2023 - 22
ASHRAE Journal - September 2023 - 23
ASHRAE Journal - September 2023 - 24
ASHRAE Journal - September 2023 - 25
ASHRAE Journal - September 2023 - 26
ASHRAE Journal - September 2023 - 27
ASHRAE Journal - September 2023 - 28
ASHRAE Journal - September 2023 - 29
ASHRAE Journal - September 2023 - 30
ASHRAE Journal - September 2023 - 31
ASHRAE Journal - September 2023 - 32
ASHRAE Journal - September 2023 - 33
ASHRAE Journal - September 2023 - 34
ASHRAE Journal - September 2023 - 35
ASHRAE Journal - September 2023 - 36
ASHRAE Journal - September 2023 - 37
ASHRAE Journal - September 2023 - 38
ASHRAE Journal - September 2023 - 39
ASHRAE Journal - September 2023 - 40
ASHRAE Journal - September 2023 - 41
ASHRAE Journal - September 2023 - 42
ASHRAE Journal - September 2023 - 43
ASHRAE Journal - September 2023 - 44
ASHRAE Journal - September 2023 - 45
ASHRAE Journal - September 2023 - 46
ASHRAE Journal - September 2023 - 47
ASHRAE Journal - September 2023 - 48
ASHRAE Journal - September 2023 - 49
ASHRAE Journal - September 2023 - 50
ASHRAE Journal - September 2023 - 51
ASHRAE Journal - September 2023 - 52
ASHRAE Journal - September 2023 - 53
ASHRAE Journal - September 2023 - 54
ASHRAE Journal - September 2023 - 55
ASHRAE Journal - September 2023 - 56
ASHRAE Journal - September 2023 - 57
ASHRAE Journal - September 2023 - 58
ASHRAE Journal - September 2023 - 59
ASHRAE Journal - September 2023 - 60
ASHRAE Journal - September 2023 - 61
ASHRAE Journal - September 2023 - 62
ASHRAE Journal - September 2023 - 63
ASHRAE Journal - September 2023 - 64
ASHRAE Journal - September 2023 - 65
ASHRAE Journal - September 2023 - 66
ASHRAE Journal - September 2023 - 67
ASHRAE Journal - September 2023 - 68
ASHRAE Journal - September 2023 - 69
ASHRAE Journal - September 2023 - 70
ASHRAE Journal - September 2023 - 71
ASHRAE Journal - September 2023 - 72
ASHRAE Journal - September 2023 - Cover3
ASHRAE Journal - September 2023 - Cover4
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FYONLJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2024november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2024november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BDMHLG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WJDGRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ATMAHK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHQRAW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XGMDXI
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_YELQLJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QJLWMC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_MCDEBX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WNYSQY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XATVOD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FJSHSS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CCBZDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XDEFVG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2023november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VHGNBL
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WPKBNJ
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_UUVCDE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTGDEW
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2023
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LKRFXS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AZSOFG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ERCDBH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QWDFRV
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JHGVDF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPUYHG
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SREIBM
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LRTGLK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OKRFGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2022november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TZSERA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_LVRUIX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RPTVYZ
https://www.nxtbook.com/nxtbooks/ashrae/mini_pub_catalog
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XIYTGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2022
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RFGDOB
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PABXNU
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_REMKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PICVBT
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_AOYTVW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JQOPLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IOYTBC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SGAJJF
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_IGHYER
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_PDRKLS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2021november_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_XCODFR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QSLFGO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ILKVNM
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2021
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OPDJKD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_VJKSRY
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDHUTC
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JPPKRR
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SDLTTH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_CKLLES
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_SLDOX
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_HJETUK
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_OLUHGE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2020october_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ZERDGH
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_QVMNEO
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_RTPOKE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_BBATRE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_STUBMW
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TPEMPE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_JNMKDS
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_FBTTPA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_WQMMNE
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_TVBRYN
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2020
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_KTUZMA
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_ABEDGD
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201910
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201909
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019septmeber_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2019september
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201908
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201907
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201906
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201905
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201904
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019april
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201903
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2019march
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201902
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201901
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_showguide2019
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018december
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018november
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2018fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_2018october
https://www.nxtbook.com/nxtbooks/ashrae/ashraemexico_2018
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201810
https://www.nxtbook.com/nxtbooks/ashrae/ashraeinsights_201806
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201805
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201804
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201803
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201712
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201711
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201710
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2017fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201709
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201705
https://www.nxtbook.com/nxtbooks/ashrae/ashrae_meetinginsert_201610
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2016fall
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acrexindia
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_amca_2015summer
https://www.nxtbook.com/nxtbooks/amca/2014summer2
https://www.nxtbook.com/nxtbooks/amca/2014summer
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acma_2014summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201311
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201309
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_acmasupp_2013fall
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201305
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201303
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2013winter
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201211
https://www.nxtbook.com/nxtbooks/ashrae/achr_expo_mexico2012
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201209
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v3
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201208_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201205
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201203
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2012winter
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201111_v2
https://www.nxtbook.com/nxtbooks/ashrae/ashraejournal_201109_v2
https://www.nxtbook.com/nxtbooks/ashrae/pubcatalog_2011summer
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201105
https://www.nxtbook.com/nxtbooks/ashrae/meetingplanner_201103
https://www.nxtbookmedia.com