The laminated wall panels 34 " with Fry Reglet trims were the most challenging, agrees Tronzo. " The tolerance levels to fabricate the panels and the graph system was 1/16 " . All the walls where these items were applied had to be smooth and plumb. This made measuring, engineering, and installing these panels more difficult than usual. " Paneling at the elevator enclosure, as well as the wood pergola like trim at the front desk and over the donor wall are particularly noteworthy says Greene. " We encountered Covid in the middle of construction. This created a challenging process with the infection control measures that had to be in place to keep all contractors on site safe. This also caused many problems with lead times. Despite these challenges the project continued and stayed on pace. " 12 " 2 " 10 " 12 " PLAM SLATS 148 " SECTION @ DONOR WALL 8 " 6 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " 2 " @ DONOR WALL 10 " SECTION 46 designsolutions I fall 2023