Contract - October 2015 - 87

PHOTOGRAPHY: ADRIAN WILSON (OPPOSITE, TOP RIGHT); RON BLUNT (ALL OTHERS)

A small courtyard (above)
brings light into a waiting area.
Above a bench in the clinical
area are 12-inch-by-24-inch,
silver-leaf glass tiles mounted
to an elm wood veneer panel
(opposite, top left). A stair
with glass railings (opposite,
bottom) connects the
building's two levels and
admits light. Chemotherapy
rooms (opposite, top middle)
have views and technology for
patient use. Other treatment
rooms (opposite, top right)
conceal medical equipment
behind millwork.

of waiting options. Patients feel more like they're at home,
or in a hospitality interior, rather than stuck in a waiting room.
"People like to wait in different ways," Frazier says.
Upon checking in, patients are given GPS location tags, so they
can wander where they like while still being monitored.
The welcome desk is backed by a 10-foot-by-35-foot
multi-layered, etched glass image of a geologic map
of the region, which joins the area's sleek furniture, smart
chandeliers and pendants by Brooklyn-based artist Lindsey
Adelman, large-scale art, and indoor plantings as effective
design punctuation marks. All were chosen, Frazier says,
not just for their beauty but because they were "not something
you would typically see in a healthcare facility."
Throughout the building, the firm has implemented
small courtyards, varied ceiling heights, skylights, and
a double-height stair to bring light and depth into the varied,
flexible spaces. Sound absorbing materials and the lack
of a public address system help keep the interior especially
quiet, and medical equipment is screened or hidden from
view to minimize the space's institutional feel.
"No design detail was overlooked in crafting a
transformational patient environment that supports
the unique physical and emotional needs of cancer patients

and caregivers, nurturing them inside and out," says
Suzen Heeley, executive director, design and construction
for Memorial Sloan Kettering.

Providing patients with options
When they receive chemotherapy treatment, patients
have the option of using their own rooms that have windows
with views of the scenery outside and are equipped
with technology allowing patients to Skype with friends
and family, order food, control the lighting or temperature,
or watch movies. Patients can also stay in one of the "living
rooms," where they can socialize with others, or choose
to walk through the building or even the gardens.
"We want the patient to feel that they are in control
of their lives, not trapped," says Richard Choy, chief architect
for Memorial Sloan Kettering.
Patients have responded positively to the facility's
design, as have the clients. This is the third major project
that EwingCole has completed for MSK. Choy is especially
pleased at how comfortable people feel here, and how
it "doesn't look like a hospital," he says. "[The architects] took
a building that was abandoned and brought it back to health." c

contract



Contract - October 2015

Table of Contents for the Digital Edition of Contract - October 2015

Contract - October 2015
Contents
Editorial
Industry News
Columnist: Building a Purpose-driven Practice
Product Focus: Waiting Patiently
Healthcare Design Expo Product Preview
Healthcare Design Expo Product Preview
Kaiser Permanente Kraemer Radiation Oncology Center
UNC Hospitals Hillsborough Campus
Palo Alto Medical Foundation San Carlos Center
2015 Healthcare Environment Awards
Ambulatory Care Winner
Ambulatory Care Honorable Mention
Acute Care Winner: Meander Medisch Centrum
Acute Care Winner: Roberts Pavilion Floors 8 and 9
Long-Term Care Winner
Conceptual Design Honorable Mention
Student Winner and Honorable Mention
Book Review: Modern Clinic Design: Strategies for an Era of Change
Designers Select: Healthcare
Sources
Ad Index
Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Intro
Contract - October 2015 - Contract - October 2015
Contract - October 2015 - Cover2
Contract - October 2015 - 1
Contract - October 2015 - 2
Contract - October 2015 - 3
Contract - October 2015 - 4
Contract - October 2015 - 5
Contract - October 2015 - Contents
Contract - October 2015 - 7
Contract - October 2015 - 8
Contract - October 2015 - 9
Contract - October 2015 - 10
Contract - October 2015 - 11
Contract - October 2015 - 12
Contract - October 2015 - 13
Contract - October 2015 - 14
Contract - October 2015 - 15
Contract - October 2015 - 16
Contract - October 2015 - 17
Contract - October 2015 - 18
Contract - October 2015 - 19
Contract - October 2015 - Editorial
Contract - October 2015 - 21
Contract - October 2015 - 22
Contract - October 2015 - 23
Contract - October 2015 - 24
Contract - October 2015 - Industry News
Contract - October 2015 - 26
Contract - October 2015 - 27
Contract - October 2015 - 28
Contract - October 2015 - 29
Contract - October 2015 - 30
Contract - October 2015 - 31
Contract - October 2015 - Columnist: Building a Purpose-driven Practice
Contract - October 2015 - 33
Contract - October 2015 - 34
Contract - October 2015 - 35
Contract - October 2015 - Product Focus: Waiting Patiently
Contract - October 2015 - 37
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 39
Contract - October 2015 - 40
Contract - October 2015 - 41
Contract - October 2015 - 42
Contract - October 2015 - 43
Contract - October 2015 - 44
Contract - October 2015 - 45
Contract - October 2015 - 46
Contract - October 2015 - 47
Contract - October 2015 - 48
Contract - October 2015 - 49
Contract - October 2015 - 50
Contract - October 2015 - 51
Contract - October 2015 - 52
Contract - October 2015 - 53
Contract - October 2015 - Healthcare Design Expo Product Preview
Contract - October 2015 - 55
Contract - October 2015 - 56
Contract - October 2015 - 57
Contract - October 2015 - 58
Contract - October 2015 - 59
Contract - October 2015 - 60
Contract - October 2015 - 61
Contract - October 2015 - Kaiser Permanente Kraemer Radiation Oncology Center
Contract - October 2015 - 63
Contract - October 2015 - 64
Contract - October 2015 - 65
Contract - October 2015 - 66
Contract - October 2015 - 67
Contract - October 2015 - UNC Hospitals Hillsborough Campus
Contract - October 2015 - 69
Contract - October 2015 - 70
Contract - October 2015 - 71
Contract - October 2015 - Palo Alto Medical Foundation San Carlos Center
Contract - October 2015 - 73
Contract - October 2015 - 74
Contract - October 2015 - 75
Contract - October 2015 - 76
Contract - October 2015 - 77
Contract - October 2015 - 78
Contract - October 2015 - 79
Contract - October 2015 - 80
Contract - October 2015 - 2015 Healthcare Environment Awards
Contract - October 2015 - Ambulatory Care Winner
Contract - October 2015 - 83
Contract - October 2015 - 84
Contract - October 2015 - 85
Contract - October 2015 - 86
Contract - October 2015 - 87
Contract - October 2015 - Ambulatory Care Honorable Mention
Contract - October 2015 - 89
Contract - October 2015 - 90
Contract - October 2015 - 91
Contract - October 2015 - Acute Care Winner: Meander Medisch Centrum
Contract - October 2015 - 93
Contract - October 2015 - Acute Care Winner: Roberts Pavilion Floors 8 and 9
Contract - October 2015 - 95
Contract - October 2015 - Long-Term Care Winner
Contract - October 2015 - 97
Contract - October 2015 - Conceptual Design Honorable Mention
Contract - October 2015 - 99
Contract - October 2015 - Student Winner and Honorable Mention
Contract - October 2015 - 101
Contract - October 2015 - Book Review: Modern Clinic Design: Strategies for an Era of Change
Contract - October 2015 - 103
Contract - October 2015 - Designers Select: Healthcare
Contract - October 2015 - 105
Contract - October 2015 - Sources
Contract - October 2015 - 107
Contract - October 2015 - 108
Contract - October 2015 - 109
Contract - October 2015 - Ad Index
Contract - October 2015 - 111
Contract - October 2015 - Installation: Vibrant Mosaics Greet Visitors to the Newest New York Subway Entrance
Contract - October 2015 - Cover3
Contract - October 2015 - Cover4
https://www.nxtbook.com/nxtbooks/contract/202007
https://www.nxtbook.com/nxtbooks/contract/202006
https://www.nxtbook.com/nxtbooks/contract/20200405
https://www.nxtbook.com/nxtbooks/contract/20200203
https://www.nxtbook.com/nxtbooks/contract/202001
https://www.nxtbook.com/nxtbooks/contract/201912
https://www.nxtbook.com/nxtbooks/contract/201911
https://www.nxtbook.com/nxtbooks/contract/201910
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2019
https://www.nxtbook.com/nxtbooks/contract/201909
https://www.nxtbook.com/nxtbooks/contract/201908
https://www.nxtbook.com/nxtbooks/contract/20190607
https://www.nxtbook.com/nxtbooks/contract/onpp-foresight_2019
https://www.nxtbook.com/nxtbooks/contract/201905
https://www.nxtbook.com/nxtbooks/contract/201904
https://www.nxtbook.com/nxtbooks/contract/201903
https://www.nxtbook.com/nxtbooks/contract/20190102
https://www.nxtbook.com/nxtbooks/contract/201812
https://www.nxtbook.com/nxtbooks/contract/womeninbusiness_2018
https://www.nxtbook.com/nxtbooks/contract/201811
https://www.nxtbook.com/nxtbooks/contract/201810
https://www.nxtbook.com/nxtbooks/contract/201809
https://www.nxtbook.com/nxtbooks/contract/20180708
https://www.nxtbook.com/nxtbooks/contract/201806
https://www.nxtbook.com/nxtbooks/contract/201805
https://www.nxtbook.com/nxtbooks/contract/201804
https://www.nxtbook.com/nxtbooks/contract/201803
https://www.nxtbook.com/nxtbooks/contract/20180102
https://www.nxtbook.com/nxtbooks/contract/201712
https://www.nxtbook.com/nxtbooks/contract/201711
https://www.nxtbook.com/nxtbooks/contract/201710
https://www.nxtbook.com/nxtbooks/contract/201709
https://www.nxtbook.com/nxtbooks/contract/2017neocon
https://www.nxtbook.com/nxtbooks/contract/20170708
https://www.nxtbook.com/nxtbooks/contract/201706
https://www.nxtbook.com/nxtbooks/contract/201705
https://www.nxtbook.com/nxtbooks/contract/201704
https://www.nxtbook.com/nxtbooks/contract/201703
https://www.nxtbook.com/nxtbooks/contract/20170102
https://www.nxtbook.com/nxtbooks/contract/201612
https://www.nxtbook.com/nxtbooks/contract/201611
https://www.nxtbook.com/nxtbooks/contract/201610
https://www.nxtbook.com/nxtbooks/contract/201609
https://www.nxtbook.com/nxtbooks/contract/2016neocon
https://www.nxtbook.com/nxtbooks/contract/201607
https://www.nxtbook.com/nxtbooks/contract/201606
https://www.nxtbook.com/nxtbooks/contract/201605
https://www.nxtbook.com/nxtbooks/contract/201604
https://www.nxtbook.com/nxtbooks/contract/201603
https://www.nxtbook.com/nxtbooks/contract/20160102
https://www.nxtbook.com/nxtbooks/contract/201512
https://www.nxtbook.com/nxtbooks/contract/201511
https://www.nxtbook.com/nxtbooks/contract/201510
https://www.nxtbook.com/nxtbooks/contract/201509
https://www.nxtbook.com/nxtbooks/contract/20150708
https://www.nxtbook.com/nxtbooks/contract/2015neocon
https://www.nxtbook.com/nxtbooks/contract/201506
https://www.nxtbook.com/nxtbooks/contract/201505
https://www.nxtbook.com/nxtbooks/contract/201504
https://www.nxtbook.com/nxtbooks/contract/201503
https://www.nxtbook.com/nxtbooks/contract/201501
https://www.nxtbook.com/nxtbooks/contract/201412
https://www.nxtbook.com/nxtbooks/contract/201411
https://www.nxtbook.com/nxtbooks/contract/201410
https://www.nxtbook.com/nxtbooks/contract/201409
https://www.nxtbook.com/nxtbooks/contract/2014neocon
https://www.nxtbook.com/nxtbooks/contract/20140708
https://www.nxtbook.com/nxtbooks/contract/201406
https://www.nxtbook.com/nxtbooks/contract/201405
https://www.nxtbook.com/nxtbooks/contract/201404
https://www.nxtbook.com/nxtbooks/contract/201403
https://www.nxtbook.com/nxtbooks/contract/iida_red2014
https://www.nxtbook.com/nxtbooks/contract/201401
https://www.nxtbook.com/nxtbooks/nielsen/contract_201312
https://www.nxtbook.com/nxtbooks/nielsen/contract_201311
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310
https://www.nxtbook.com/nxtbooks/nielsen/contract_201310_v2
https://www.nxtbook.com/nxtbooks/nielsen/contract_201309
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130708_neocon_supplement
https://www.nxtbook.com/nxtbooks/nielsen/contract_201306
https://www.nxtbook.com/nxtbooks/nielsen/contract_201305
https://www.nxtbook.com/nxtbooks/nielsen/contract_201304
https://www.nxtbook.com/nxtbooks/nielsen/contract_201303
https://www.nxtbook.com/nxtbooks/nielsen/contract_20130102
https://www.nxtbook.com/nxtbooks/nielsen/contract_201212
https://www.nxtbook.com/nxtbooks/nielsen/contract_201211
https://www.nxtbook.com/nxtbooks/nielsen/contract_201210
https://www.nxtbook.com/nxtbooks/nielsen/contract_201209
https://www.nxtbook.com/nxtbooks/nielsen/contract_ncw_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201208
https://www.nxtbook.com/nxtbooks/nielsen/contract_201206
https://www.nxtbook.com/nxtbooks/nielsen/contract_201205
https://www.nxtbook.com/nxtbooks/nielsen/contract_201204
https://www.nxtbook.com/nxtbooks/nielsen/contract_201203
https://www.nxtbook.com/nxtbooks/nielsen/contract_20120102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20111112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201110
https://www.nxtbook.com/nxtbooks/nielsen/contract_201109
https://www.nxtbook.com/nxtbooks/nielsen/contract_2011neoconwinners
https://www.nxtbook.com/nxtbooks/nielsen/contract_201108
https://www.nxtbook.com/nxtbooks/nielsen/contract_201106
https://www.nxtbook.com/nxtbooks/nielsen/contract_201105
https://www.nxtbook.com/nxtbooks/nielsen/contract_201104
https://www.nxtbook.com/nxtbooks/nielsen/contract_201103
https://www.nxtbook.com/nxtbooks/nielsen/contract_20110102
https://www.nxtbook.com/nxtbooks/nielsen/contract_20101112
https://www.nxtbook.com/nxtbooks/nielsen/contract_201010
https://www.nxtbook.com/nxtbooks/nielsen/contract_201009
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100708
https://www.nxtbook.com/nxtbooks/nielsen/contract_201006
https://www.nxtbook.com/nxtbooks/nielsen/contract_201005
https://www.nxtbook.com/nxtbooks/nielsen/contract_201004
https://www.nxtbook.com/nxtbooks/nielsen/contract_201003
https://www.nxtbook.com/nxtbooks/nielsen/contract_20100102
https://www.nxtbook.com/nxtbooks/nielsen/contract_200911
https://www.nxtbook.com/nxtbooks/nielsen/contract_200909
https://www.nxtbook.com/nxtbooks/nielsen/contract_200910
https://www.nxtbook.com/nxtbooks/nielsen/contract_200908
https://www.nxtbook.com/nxtbooks/nielsen/contract_200907
https://www.nxtbook.com/nxtbooks/nielsen/contract_200906
https://www.nxtbook.com/nxtbooks/nielsen/contract_200905
https://www.nxtbook.com/nxtbooks/nielsen/contract_200904
https://www.nxtbook.com/nxtbooks/nielsen/contract_200903
https://www.nxtbook.com/nxtbooks/nielsen/contract_200902
https://www.nxtbook.com/nxtbooks/nielsen/contract_200901
https://www.nxtbookmedia.com