which kept the ceilings higher over the bedrooms and living rooms. Worth the effort Resident bathrooms were transformed from small rooms with little storage to spacious layouts with separate compartments for the toilet and shower and the vanity area. in an occupied building. In the end, while it certainly would have been easier to build from the ground up, it's often challenging projects like this one that can be the most 38 EFAmagazine.com * Fall 2018 SFCS ARCHITECTS Before Repositioning can be challenging in an existing building, forcing design teams to look at new solutions and find creative ways to solve unforeseen challenges that arise. This project benefitted from the owner being willing to reduce census and move all the residents out of the Elm Building to other apartments on campus during construction, which eliminated the need to phase the project and work around existing residents. Additionally, much of the structural shoring work would not have been possible to dohttp://deepstreamdesign.com http://www.EFAmagazine.com