H2Tech - Q2 2022 - 35

CAPITAL PROJECTS
TABLE 1. Carbon management comparison
Case #1
Carseland GTL base
case: no H2
S/C
Process gas, MMft3
Fuel gas, MMft3
d
Total natural gas, MMft3
SMR capacity, MMBtu/hr
LFP liquid, bpd
SMR stack CO2
emission
with H2 as fuel, metric tpd
SMR stack CO2 emission with
H2 fuel replacement, metric tpd
CO2 process to CCS, metric tpd
CO2 emitted from CCS equipment,
metric tpd
Total CO2 emissions, metric tpd
Excess pure H2, MMft3
d
Excess pure H2, metric tpd
CO2 emissions/pure H2
,
metric tpd/MMft3
CO2 emissions/pure H2
metric tpd/metric tpd
,
TABLE 2. Commodity pricing
Current commodity pricing (CAD $Q3/2021)
CAD $3.00
CAD $0.21
Pipeline
natural gas
CAD $33.00
Wholesle
synthetic diesel
Electric power
CAD $0.85
CAD $135.12
per GJ
per liter
synthetic diesel
per bbl
synthetic diesel
per liter
synthetic diesel
per bbl
synthetic diesel
CAD $80.00 per Mwe-hr
expansion plans for 2023 of the Carseland
plant, blue H2
will be available in
sufficient quantity to support up to 160
MMft3
d of 5% blend natural gas. Future
plant expansions will bring co-production
capacity to 100 metric tpd of blue H2
volumes of co-generated H2
,
which is sufficient to support up to 850
MMft3
d of 5% blend natural gas. These
, as shown by
TABLE 3, demonstrate the significant role
the Carseland GTL plant can play in supporting
the decarbonization of Alberta's
natural gas supply system.
Case Study 2: Carseland GTL
plant-capability to integrate with
hydrogenation-derived renewable diesel
(HDRD) projects. According to a
FIG. 6. Blue H2
d
d
co-production
2.7
3.9
1.5
5.4
133
450
137
137
N/A
N/A
45
40
35
30
25
20
15
10
5
$1.69
$2.54
S/C = 2.4 no H2 coproduction
S/C = 3 H2 coproduction
$3.38
H2 gate sales price, $Cdn/kg
S/C = 2.4 H2 coproduction
S/C = 5 H2 coproduction
co-production economics using new process.
recently completed study, the Carseland
GTL plant's current blue H2
production
capacity of 16 metric tpd could support
the integration of a 2,500-bpd-4,000bpd
canola seed oil HDRD plant (FIG. 8),
producing a combined site capacity of up
to 4,500 bpd of low-carbon diesel with a
combined CI of less than 25. The study
additionally confirmed that the propane
byproduct generated by the HDRD process
could be recycled and used as feed
for the GTL plant, reducing the plant's
demand for natural gas and further reducing
the combined CI.
From Kitimat to California: A blue H2
market opportunity. H2
production
represents a significant opportunity for
Alberta and British Columbia to move
beyond satisfying Canadian needs and
export H2
to markets possessing ambitious
decarbonization plants but lacking
the CCUS capabilities and projected lowcost,
sustainable supply of natural gas that
make these two regions so well-suited to
producing blue H2
. Potentially key export
markets for Canadian-produced blue H2
include Japan, China, South Korea and
California; a proposed GTL plant in KitiH2Tech
| Q1 2021 35
$4.54
Case #2
Case #3
Carseland GTL H2
co-production
2.7
3.9
3.4
7.2
138
450
136
102
238
5.9
16.5
17.1
6.1
Carseland GTL H2
co-production
5
6.3
5.8
12
232
594
231
219
450
12.8
34.9
17.2
6.3
Case #4
Conventional SMR
gray H2
production
5
Case #5
Conventional blue H2
production with
pre-combustion CCS
5
8.3
142
8.1
-
453
453
19.3
51.6
23.5
8.8
Financial performance of 500 bpd GTL H2 coproduction plant
125
-
198
197
93
395
18.5
48.5
15.8
6
BT IRR, %

H2Tech - Q2 2022

Table of Contents for the Digital Edition of H2Tech - Q2 2022

Contents
H2Tech - Q2 2022 - Cover1
H2Tech - Q2 2022 - Cover2
H2Tech - Q2 2022 - Contents
H2Tech - Q2 2022 - 4
H2Tech - Q2 2022 - 5
H2Tech - Q2 2022 - 6
H2Tech - Q2 2022 - 7
H2Tech - Q2 2022 - 8
H2Tech - Q2 2022 - 9
H2Tech - Q2 2022 - 10
H2Tech - Q2 2022 - 11
H2Tech - Q2 2022 - 12
H2Tech - Q2 2022 - 13
H2Tech - Q2 2022 - 14
H2Tech - Q2 2022 - 15
H2Tech - Q2 2022 - 16
H2Tech - Q2 2022 - 17
H2Tech - Q2 2022 - 18
H2Tech - Q2 2022 - 19
H2Tech - Q2 2022 - 20
H2Tech - Q2 2022 - 21
H2Tech - Q2 2022 - 22
H2Tech - Q2 2022 - 23
H2Tech - Q2 2022 - 24
H2Tech - Q2 2022 - 25
H2Tech - Q2 2022 - 26
H2Tech - Q2 2022 - 27
H2Tech - Q2 2022 - 28
H2Tech - Q2 2022 - 29
H2Tech - Q2 2022 - 30
H2Tech - Q2 2022 - 31
H2Tech - Q2 2022 - 32
H2Tech - Q2 2022 - 33
H2Tech - Q2 2022 - 34
H2Tech - Q2 2022 - 35
H2Tech - Q2 2022 - 36
H2Tech - Q2 2022 - 37
H2Tech - Q2 2022 - 38
H2Tech - Q2 2022 - 39
H2Tech - Q2 2022 - 40
H2Tech - Q2 2022 - 41
H2Tech - Q2 2022 - 42
H2Tech - Q2 2022 - 43
H2Tech - Q2 2022 - 44
H2Tech - Q2 2022 - 45
H2Tech - Q2 2022 - 46
H2Tech - Q2 2022 - Cover3
H2Tech - Q2 2022 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/h2tech-market-data-2024
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q4_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_marketdata_2023
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q3_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_electrolyzerhandbook_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q2_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_electrolyzerhandbook_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q1_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q4_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q3_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q2_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q1_2021
https://www.nxtbookmedia.com