SAFETY AND SUSTAINABILITY
as the project closes.
* End of life: The facility is
decommissioned or repurposed.
Proactively implementing process
safety activities at the optimal time has
been covered in detail7
, as has reactively
The early
conducting reviews to ensure nothing
significant has been missed.8
incorporation of process safety studies
and the stage-gate review process in a
capital project can minimize personnel
exposure, asset damage and business interruption
while also controlling costs
and ensuring ease of project implementation.
In a best practice approach, the
capital project safety plan should run
parallel to the project's ESG strategy
and inform on reportable metrics conTABLE
1. Safety study overview
FEL
General Technical
Safety Studies
HSE plan
Stage-gate reviews
Hazard Identification
Consequence
assessments
E, S, G
Impact
E, S and G
G
E, S
E
S
E, S
E
Safety assessments
E, S, G
E, S, G
E, S, G
E
S
* Evergreen (HAZOP MOCs)
1
Appraise
FEL-1
AFS
Select
FEL-2
AFF
Define
FEL-3
AFE
Detailed
Design
Project Execution
Construction
Operation
Prelim HAZID
Process safety management (updated continuously throughout capital project phases)
% Reviews
HAZOP
HAZID
ENVID
Screen FSS/FEA
EPA
Prelim ISD
NTSR
HSE philosophy
Concept ERA
Prelim BI
Prelim WSA
ISD
WSA
Prelim HAZOP
Prelim FSS/FEA
FSS/FEA
RMP
cerning risks to the environment, employees
and community.
Capital project safety plan. At the
onset of the Appraise FEL-1 phase, a
safety plan should be created and implemented
in the form of a living document
that lays out the strategy and schedule
of process safety activities over the project
lifecycle.8
This plan should be updated
throughout the project lifecycle
as project clarity is established. While
risk-based process safety is designed for
operations, the framework can be appropriately
implemented in the project
safety plan.
Depending on the capital project
specifics, several technical safety studies
are commonly used to identify
hazards and assess and mitigate risk
throughout the project lifecycle. The
intent of a phased approach to technical
safety studies-coupled with stage-gate
reviews-is to help ensure maximum
value is achieved in early design phases
by reducing implementation costs, risks
and project schedules.8
studies to be included in a capital project
safety plan, the ideal time to conduct
those studies, and their influence
on environmental, social and/or governance
aspects of ESG are included in
TABLE 1. The author's company9
can provide
a complete list.
Typically, oil and gas, chemical and
similar energy-related industry compaA
selection of
HAZOP*1
FSS
RMP1
Prelim ERA
Max loss BI
IRE1
Additional analyses for hazard identification, consequence analysis, risk assessment, risk mitigation and safety culture. (Request from BakerRisk)
Periodically (HAZOP every 5 yr, RMP every 5 yr, IRE every 3 yr)
Note: After the HAZOP is performed, MOC risk assessments are required for any design change
Study abbreviations
Study names
AFS, AFF, AFE
BI
ENVID
EPA
ERA
FEA
FEL
FSS
HAZID
HAZOP
Authority for Select, Feed, Expenditure
Business Interruption
Environmental Hazard Identification
Environmental Protection Agency
Environmental Risk Assessment
Fire and Explosion Analysis
Front End Loading
Facility Siting Study
Hazard Identification
Hazard and Operability Study
H2Tech | Q3 2022 37
Study abbreviations
HCA
HRA
HSE
IRE
ISD
MOC
NTSR
RMP
WSA
Study names
High Consequence Area
Health Risk Assessment
Health Safety Environmental philosophies
Insurance Risk Engineering
Inherently Safer Design
Management of Change
Novel Technology Safety Review
Risk Management Plan
Waterway Suitability Assessment

H2Tech - Q3 2022

Table of Contents for the Digital Edition of H2Tech - Q3 2022

Contents
H2Tech - Q3 2022 - Cover1
H2Tech - Q3 2022 - Cover2
H2Tech - Q3 2022 - Contents
H2Tech - Q3 2022 - 4
H2Tech - Q3 2022 - 5
H2Tech - Q3 2022 - 6
H2Tech - Q3 2022 - 7
H2Tech - Q3 2022 - 8
H2Tech - Q3 2022 - 9
H2Tech - Q3 2022 - 10
H2Tech - Q3 2022 - 11
H2Tech - Q3 2022 - 12
H2Tech - Q3 2022 - 13
H2Tech - Q3 2022 - 14
H2Tech - Q3 2022 - 15
H2Tech - Q3 2022 - 16
H2Tech - Q3 2022 - 17
H2Tech - Q3 2022 - 18
H2Tech - Q3 2022 - 19
H2Tech - Q3 2022 - 20
H2Tech - Q3 2022 - 21
H2Tech - Q3 2022 - 22
H2Tech - Q3 2022 - 23
H2Tech - Q3 2022 - 24
H2Tech - Q3 2022 - 25
H2Tech - Q3 2022 - 26
H2Tech - Q3 2022 - 27
H2Tech - Q3 2022 - 28
H2Tech - Q3 2022 - 29
H2Tech - Q3 2022 - 30
H2Tech - Q3 2022 - 31
H2Tech - Q3 2022 - 32
H2Tech - Q3 2022 - 33
H2Tech - Q3 2022 - 34
H2Tech - Q3 2022 - 35
H2Tech - Q3 2022 - 36
H2Tech - Q3 2022 - 37
H2Tech - Q3 2022 - 38
H2Tech - Q3 2022 - 39
H2Tech - Q3 2022 - 40
H2Tech - Q3 2022 - 41
H2Tech - Q3 2022 - 42
H2Tech - Q3 2022 - Cover3
H2Tech - Q3 2022 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/h2tech-market-data-2024
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q4_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_marketdata_2023
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q3_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_electrolyzerhandbook_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q2_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_electrolyzerhandbook_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q1_2022
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q4_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q3_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q2_2021
https://www.nxtbook.com/nxtbooks/gulfpub/h2tech_q1_2021
https://www.nxtbookmedia.com