Hydrocarbon Processing - August 2021 - GP-18

SPECIAL FOCUS: SMALL-SCALE LNG
TABLE 1. Case study examples for small-scale pressurized and atmospheric solutions
Peak
Case
1
2
3
Nominal power
generation
25 MW
100 MW
150 MW
consumption
27.8 MW
111.1 MW
166.7 MW
LNG required,
MMtpy
0.034
0.135
0.203
Average LNG
requirement, Nm3/d
145,160
580,640
870,960
*VI bullets = Vacuum-insulated bullets; FC S/C = Full containment, steel/concrete tanks
delivery time to enable the commencement
of commercial operations and an
optimized return on investment.
FIG. 2. In addition to supplying fuel directly to a power station, LNG can be supplied to
other customers, such as other LNG satellite stations, LNG fueling stations, other mini-power
generation sites or marine operations.
The delivery times of these project
vary depending on several factors, including
delivery times for the power units.
However, when the project requires larger-size
storage tanks, then the tank construction
dominates the critical path.
The storage capacity is based on a
FIG. 3. ISO container on trailer used to store
LNG at mini-scale power facilities.
distribution, local industrial consumers
and vehicle refueling stations.
The high-level concept for SSLNGto-power
remains virtually the same for
varying power generation levels required;
however, when optimizing the concept
for a particular site or project, all applicable
parameters must be considered.
Case studies for SSLNG-to-power.
A number of case studies have been
developed for varying levels of power
generation of 25 MW, 100 MW and
150 MW. Power generation is based on
simple-cycle engines with a thermal efficiency
of 48%, using a typical LNG
heating value, with one LNG cargo delivery
every 4 wk and a delivery power of
8,000 hr/yr. TABLE 1 compares examples
for the small-scale pressurized and atmospheric
solutions.
18 JULY/AUGUST 2021 | GasProcessingNews.com
4-wk delivery term, but this will be subject
to the availability of LNG in the specific
market and the size of the LNG carrier
available. Additional small LNGCs
are coming into operation as the demand
for smaller cargoes increases, which will
provide a benefit to small-scale terminals.
Another option may be to receive a portion
of a cargo from a larger LNGC.
Modular design concept. Depending
on the individual project, the construction
concept can be optimized based on
location and the type of equipment to be
installed. Given the nature of the overall
SSLNG-to-power concept, it can be
assumed that the location is more than
likely to be remote, with potentially low
levels of infrastructure and construction
labor availability.
The remote location will benefit from
a minimum of in-situ construction and
from equipment and plant sections being
provided as modularized units. At least
partial adherence to these targets will reduce
construction costs by maximizing
prefabrication. The modularized design
approach brings clear advantages in plant
expandability while fast-tracking project
Mini-scale power production. At
< 50 MW, these small-sized power
plants usually serve the power demand
of a smaller island without significant
industrial power demand. The LNG
can be transported via ISO containers
on LNG trucks (FIG. 3) or by rail (often
referred to as a " virtual pipeline " ),
with each holding approximately 43 m3
of product. They can be lifted from the
trailer assembly or left in-situ on the
trailer for distribution in the plant.
Although the
storage
is modular,
and
these ISO containers provide an option
for storage solutions up to 500 m3
produce low levels of power generation.
A significant advantage of using ISO
containers is that the facility does not
need to be in a marine location, but can
be situated inland at more convenient
sites. At the power plant, the LNG is
stored in small, pressurized vessels.
Small-scale power production. As
power generation requirements increase
up to 50 MW, so does the size of the storage.
The storage concept changes to utilize
vacuum-insulated bullets, each with
a typical capacity of 1,000 m3
Economic designs up to 10,000 m3
(FIG. 4).
can be
achieved, with the remainder of the plant
being fully modularized, which means
that the overall schedule can be reduced
to approximately 16 mos-18 mos.
This concept does not incorporate a
boil-off gas handling system; instead, the
LNG is allowed to warm up within the
storage, as the system can operate with
zero sendout for up to 2 mos without any
venting requirements
Star-fin ambient air vaporizers are a simple
vaporization solution in this concept.
They are a suitable technology for most climates;
however, some additional heating
may be required for colder climates.
Delivery max.
prefabrication, mos
18
24
24
Delivery
stickbuilt, mos
20
26
26
Storage
capacity
Tank
concept*
6,000 m3 VI bullets
25,000 m3 FC S/C
38,000 m3 FC S/C
http://www.GasProcessingNews.com

Hydrocarbon Processing - August 2021

Table of Contents for the Digital Edition of Hydrocarbon Processing - August 2021

Contents
Hydrocarbon Processing - August 2021 - Intro
Hydrocarbon Processing - August 2021 - Cover1
Hydrocarbon Processing - August 2021 - Cover2
Hydrocarbon Processing - August 2021 - Contents
Hydrocarbon Processing - August 2021 - 4
Hydrocarbon Processing - August 2021 - 5
Hydrocarbon Processing - August 2021 - 6
Hydrocarbon Processing - August 2021 - 7
Hydrocarbon Processing - August 2021 - 8
Hydrocarbon Processing - August 2021 - 9
Hydrocarbon Processing - August 2021 - 10
Hydrocarbon Processing - August 2021 - 11
Hydrocarbon Processing - August 2021 - 12
Hydrocarbon Processing - August 2021 - 13
Hydrocarbon Processing - August 2021 - 14
Hydrocarbon Processing - August 2021 - 15
Hydrocarbon Processing - August 2021 - 16
Hydrocarbon Processing - August 2021 - 17
Hydrocarbon Processing - August 2021 - 18
Hydrocarbon Processing - August 2021 - 19
Hydrocarbon Processing - August 2021 - 20
Hydrocarbon Processing - August 2021 - 21
Hydrocarbon Processing - August 2021 - 22
Hydrocarbon Processing - August 2021 - 23
Hydrocarbon Processing - August 2021 - 24
Hydrocarbon Processing - August 2021 - 25
Hydrocarbon Processing - August 2021 - 26
Hydrocarbon Processing - August 2021 - 27
Hydrocarbon Processing - August 2021 - 28
Hydrocarbon Processing - August 2021 - 29
Hydrocarbon Processing - August 2021 - 30
Hydrocarbon Processing - August 2021 - 31
Hydrocarbon Processing - August 2021 - 32
Hydrocarbon Processing - August 2021 - 33
Hydrocarbon Processing - August 2021 - 34
Hydrocarbon Processing - August 2021 - 35
Hydrocarbon Processing - August 2021 - 36
Hydrocarbon Processing - August 2021 - 37
Hydrocarbon Processing - August 2021 - 38
Hydrocarbon Processing - August 2021 - 39
Hydrocarbon Processing - August 2021 - 40
Hydrocarbon Processing - August 2021 - 41
Hydrocarbon Processing - August 2021 - 42
Hydrocarbon Processing - August 2021 - 43
Hydrocarbon Processing - August 2021 - 44
Hydrocarbon Processing - August 2021 - 45
Hydrocarbon Processing - August 2021 - 46
Hydrocarbon Processing - August 2021 - 47
Hydrocarbon Processing - August 2021 - 48
Hydrocarbon Processing - August 2021 - 49
Hydrocarbon Processing - August 2021 - 50
Hydrocarbon Processing - August 2021 - 51
Hydrocarbon Processing - August 2021 - 52
Hydrocarbon Processing - August 2021 - 53
Hydrocarbon Processing - August 2021 - 54
Hydrocarbon Processing - August 2021 - 55
Hydrocarbon Processing - August 2021 - 56
Hydrocarbon Processing - August 2021 - 57
Hydrocarbon Processing - August 2021 - 58
Hydrocarbon Processing - August 2021 - 59
Hydrocarbon Processing - August 2021 - 60
Hydrocarbon Processing - August 2021 - 61
Hydrocarbon Processing - August 2021 - 62
Hydrocarbon Processing - August 2021 - 63
Hydrocarbon Processing - August 2021 - 64
Hydrocarbon Processing - August 2021 - 65
Hydrocarbon Processing - August 2021 - 66
Hydrocarbon Processing - August 2021 - 67
Hydrocarbon Processing - August 2021 - 68
Hydrocarbon Processing - August 2021 - 69
Hydrocarbon Processing - August 2021 - 70
Hydrocarbon Processing - August 2021 - 71
Hydrocarbon Processing - August 2021 - 72
Hydrocarbon Processing - August 2021 - 73
Hydrocarbon Processing - August 2021 - 74
Hydrocarbon Processing - August 2021 - 75
Hydrocarbon Processing - August 2021 - 76
Hydrocarbon Processing - August 2021 - 77
Hydrocarbon Processing - August 2021 - 78
Hydrocarbon Processing - August 2021 - 79
Hydrocarbon Processing - August 2021 - 80
Hydrocarbon Processing - August 2021 - 81
Hydrocarbon Processing - August 2021 - 82
Hydrocarbon Processing - August 2021 - Cover3
Hydrocarbon Processing - August 2021 - Cover4
Hydrocarbon Processing - August 2021 - GP-1
Hydrocarbon Processing - August 2021 - GP-2
Hydrocarbon Processing - August 2021 - GP-3
Hydrocarbon Processing - August 2021 - GP-4
Hydrocarbon Processing - August 2021 - GP-5
Hydrocarbon Processing - August 2021 - GP-6
Hydrocarbon Processing - August 2021 - GP-7
Hydrocarbon Processing - August 2021 - GP-8
Hydrocarbon Processing - August 2021 - GP-9
Hydrocarbon Processing - August 2021 - GP-10
Hydrocarbon Processing - August 2021 - GP-11
Hydrocarbon Processing - August 2021 - GP-12
Hydrocarbon Processing - August 2021 - GP-13
Hydrocarbon Processing - August 2021 - GP-14
Hydrocarbon Processing - August 2021 - GP-15
Hydrocarbon Processing - August 2021 - GP-16
Hydrocarbon Processing - August 2021 - GP-17
Hydrocarbon Processing - August 2021 - GP-18
Hydrocarbon Processing - August 2021 - GP-19
Hydrocarbon Processing - August 2021 - GP-20
Hydrocarbon Processing - August 2021 - GP-21
Hydrocarbon Processing - August 2021 - GP-22
Hydrocarbon Processing - August 2021 - GP-23
Hydrocarbon Processing - August 2021 - GP-24
Hydrocarbon Processing - August 2021 - GP-25
Hydrocarbon Processing - August 2021 - GP-26
Hydrocarbon Processing - August 2021 - GP-27
Hydrocarbon Processing - August 2021 - GP-28
Hydrocarbon Processing - August 2021 - GP-29
Hydrocarbon Processing - August 2021 - GP-30
Hydrocarbon Processing - August 2021 - GP-31
Hydrocarbon Processing - August 2021 - GP-32
Hydrocarbon Processing - August 2021 - GP-33
Hydrocarbon Processing - August 2021 - GP-34
Hydrocarbon Processing - August 2021 - GP-35
Hydrocarbon Processing - August 2021 - GP-36
Hydrocarbon Processing - August 2021 - GP-37
Hydrocarbon Processing - August 2021 - GP-38
Hydrocarbon Processing - August 2021 - GP-39
Hydrocarbon Processing - August 2021 - GP-40
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com