Refining Technology
yields. The unique flow scheme and the
tailored catalyst system offered high middle
distillate yields, while reducing energy,
hydrogen consumption and other costs
compared with competing technologies.
A high-level flow scheme of the integrated
hydroprocessing units is shown in FIG. 5.
The RUP complex comprised the folFIG.
4. (Left) Location of TÜPRAŞ' refineries, Turkey; (right) Aerial view of the RUP complex,
Izmit refinery.
lowing main units: vacuum unit, delayed
coker, integrated hydrocracker and hydrotreating
units, hydrogen generation unit,
two trains of sulfur recovery units, an amine
regeneration and a sour water stripper unit
as well as a new cogeneration unit (120
MW). The project was completed in ~4
yr at an estimated cost of $3.2 B, including
utilities and tank farm area. All units were
successfully commissioned by 3Q 2015.
The 50,000-bpd (8,000-m3
/d) unitk
FIG. 5. Integrated RUP hydroprocessing units flow schematic.
to increase the flexibility of the Izmit refinery
(one of four TÜPRAŞ refineries) to
process heavier and high-sulfur crude oils,
together with the capability to convert 4.2
MMtpy of high-sulfur fuel oil to 3.5 MMtpy
of valuable high-quality white products,
such as diesel, jet fuel, gasoline and LPG
conforming to Euro-5 specifications.
Based on its internal evaluation,
TÜPRAŞ had clear aspirations to reduce
its fuel oil production and chose one of
the most common and proven refinery
configurations for residue conversion: a
delayed coking unit (DCU) with downstream
hydrocracking and hydrotreating
units for upgrading all coker products.
This widely used option offers a reliable
configuration with minimal risk at the
lowest capital cost. However, the biggest
challenge was to create an integrated hydroprocessing
complex design that offered
the desired degree of flexibility between
the hydrocracking and hydrotreating units
at optimum CAPEX and OPEX costs to
keep the project economically viable.
Tailored integrated design. The authors'
company developed several potential
configurations and analyzed the
pros and cons to help TÜPRAŞ choose
the most optimum solution. Each poten22
SEPTEMBER 2021 | HydrocarbonProcessing.com
tial configuration included an analysis of
resources requirements for both people
and equipment, high-level performance
projections, cost estimates and constructability
rankings. This iterative process
enabled the TÜPRAŞ team to refine objectives,
understand the numbers in detail
and provide feed definitions to optimize
the cut point between straight-run VGO
and coker feed to optimize unit sizes. The
collaboration ultimately resulted in an
ideal configuration to meet the project objectives.
FIG. 4 shows the refinery location
(left) and an aerial view (right) of the site.
The selected design comprised of an
integrated coker naphtha and distillate
process unitj
, with all product rundowns
routed to a process unit fractionation sectionk
.
Key common high-pressure equipment,
such as washwater pumps, make-up
gas compressors and amine pumps, helped
improve the integration and reduce costs
without compromising the degree of flexibility.
Extensive heat recovery between
the units and common PSA for recovery of
CLPS off-gases from the complex helped
minimize the carbon footprint.
For the hydrocracking unit configuration,
TÜPRAŞ chose a proprietary enhanced
two-stage processl
to minimize the
impact of difficult feeds on the product
was designed to process a 60:40 feed blend
of HVGO/HCGO at 98 wt% conversion.
An integrated hydroprocessing complex
checkout was begun in July 2014 and the
units were successfully commissioned in
May 2015. A demonstration test run confirmed
that the units are meeting or exceeding
performance guarantees.
Technical support. The original unit design
solely relied on the UCO purge and a
customized catalyst system to prevent the
HPNA buildup. It worked well with feeds
similar to the design feed case. Encouraging
test run results coupled with spare
margin in unit hydraulics and hydrogen
availability offered further potential to increase
ROI. Within 4 mos of commissioning,
capacity was gradually increased to
110% of design in continuous collaboration
with the authors' company's technology
services to harness the full potential
of the unit. Catalyst performance, key unit
variables and the health of key equipment
were closely monitored to stay within
the design limits. Changes to feed blend,
both in terms of cracked to straight-run
ratio and increase in HVGO/HCGO end
points, were necessary to allow TÜPRAŞ
to push the feed rate further and reduce
the reliance on imported HVGO. Sustained
operation at high capacity coupled
with the processing of relatively heavier
feed blends eventually increased the operating
severity to a point where the design
UCO bleed rate was no longer enough to
purge the HPNAs from the system. UCO
color turned from off-white to orange in
a matter of days following the increase in
HCGO end point by ~45°C.
http://www.HydrocarbonProcessing.com

Hydrocarbon Processing - September 2021

Table of Contents for the Digital Edition of Hydrocarbon Processing - September 2021

Contents
Hydrocarbon Processing - September 2021 - Intro
Hydrocarbon Processing - September 2021 - Cover1
Hydrocarbon Processing - September 2021 - Cover2
Hydrocarbon Processing - September 2021 - Contents
Hydrocarbon Processing - September 2021 - 4
Hydrocarbon Processing - September 2021 - 5
Hydrocarbon Processing - September 2021 - 6
Hydrocarbon Processing - September 2021 - 7
Hydrocarbon Processing - September 2021 - 8
Hydrocarbon Processing - September 2021 - 9
Hydrocarbon Processing - September 2021 - 10
Hydrocarbon Processing - September 2021 - 11
Hydrocarbon Processing - September 2021 - 12
Hydrocarbon Processing - September 2021 - 13
Hydrocarbon Processing - September 2021 - 14
Hydrocarbon Processing - September 2021 - 15
Hydrocarbon Processing - September 2021 - 16
Hydrocarbon Processing - September 2021 - 17
Hydrocarbon Processing - September 2021 - 18
Hydrocarbon Processing - September 2021 - 19
Hydrocarbon Processing - September 2021 - 20
Hydrocarbon Processing - September 2021 - 21
Hydrocarbon Processing - September 2021 - 22
Hydrocarbon Processing - September 2021 - 23
Hydrocarbon Processing - September 2021 - 24
Hydrocarbon Processing - September 2021 - 25
Hydrocarbon Processing - September 2021 - 26
Hydrocarbon Processing - September 2021 - 27
Hydrocarbon Processing - September 2021 - 28
Hydrocarbon Processing - September 2021 - 29
Hydrocarbon Processing - September 2021 - 30
Hydrocarbon Processing - September 2021 - 31
Hydrocarbon Processing - September 2021 - 32
Hydrocarbon Processing - September 2021 - 33
Hydrocarbon Processing - September 2021 - 34
Hydrocarbon Processing - September 2021 - 35
Hydrocarbon Processing - September 2021 - 36
Hydrocarbon Processing - September 2021 - 37
Hydrocarbon Processing - September 2021 - 38
Hydrocarbon Processing - September 2021 - 39
Hydrocarbon Processing - September 2021 - 40
Hydrocarbon Processing - September 2021 - 41
Hydrocarbon Processing - September 2021 - 42
Hydrocarbon Processing - September 2021 - 43
Hydrocarbon Processing - September 2021 - 44
Hydrocarbon Processing - September 2021 - 45
Hydrocarbon Processing - September 2021 - 46
Hydrocarbon Processing - September 2021 - 47
Hydrocarbon Processing - September 2021 - 48
Hydrocarbon Processing - September 2021 - 49
Hydrocarbon Processing - September 2021 - 50
Hydrocarbon Processing - September 2021 - 51
Hydrocarbon Processing - September 2021 - 52
Hydrocarbon Processing - September 2021 - 53
Hydrocarbon Processing - September 2021 - 54
Hydrocarbon Processing - September 2021 - 55
Hydrocarbon Processing - September 2021 - 56
Hydrocarbon Processing - September 2021 - 57
Hydrocarbon Processing - September 2021 - 58
Hydrocarbon Processing - September 2021 - 59
Hydrocarbon Processing - September 2021 - 60
Hydrocarbon Processing - September 2021 - 61
Hydrocarbon Processing - September 2021 - 62
Hydrocarbon Processing - September 2021 - 63
Hydrocarbon Processing - September 2021 - 64
Hydrocarbon Processing - September 2021 - 65
Hydrocarbon Processing - September 2021 - 66
Hydrocarbon Processing - September 2021 - 67
Hydrocarbon Processing - September 2021 - 68
Hydrocarbon Processing - September 2021 - 69
Hydrocarbon Processing - September 2021 - 70
Hydrocarbon Processing - September 2021 - 71
Hydrocarbon Processing - September 2021 - 72
Hydrocarbon Processing - September 2021 - 73
Hydrocarbon Processing - September 2021 - 74
Hydrocarbon Processing - September 2021 - 75
Hydrocarbon Processing - September 2021 - 76
Hydrocarbon Processing - September 2021 - 77
Hydrocarbon Processing - September 2021 - 78
Hydrocarbon Processing - September 2021 - 79
Hydrocarbon Processing - September 2021 - 80
Hydrocarbon Processing - September 2021 - 81
Hydrocarbon Processing - September 2021 - 82
Hydrocarbon Processing - September 2021 - 83
Hydrocarbon Processing - September 2021 - 84
Hydrocarbon Processing - September 2021 - 85
Hydrocarbon Processing - September 2021 - 86
Hydrocarbon Processing - September 2021 - 87
Hydrocarbon Processing - September 2021 - 88
Hydrocarbon Processing - September 2021 - 89
Hydrocarbon Processing - September 2021 - 90
Hydrocarbon Processing - September 2021 - Cover3
Hydrocarbon Processing - September 2021 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com