designed for fully corroded conditions.
Note: The factor of safety (FS) considered
in the code for new materials is less vs. the
FS for existing older equipment materials.
This is primarily due to enhancements in
materials and welding technology. This
difference in FS is noticeable in the allowable
stress value. Therefore, before starting
calculations, it is important to change
the allowable stress values in the design
software used for analysis. Otherwise,
by default, software uses allowable stress
values as per the current FS. This can lead
to a misinterpretation that the required
thickness is sufficient for the rerate conditions,
which otherwise would be failing
when used with the earlier FS.
The full-scale model of the equipment
must be created for the analysis being inputted
into the rerated design conditions.
A separate file must be created for the
base case that indicates the existing design
conditions, as well. This will provide
leverage to understand how the rerated
design case is different from the base case.
Rerate report. The rerate study should
be properly documented to elaborate the
findings. This report should be in an explicit
format that is easy to understand for
client/owner approval. A comprehensive
rerate report should include the following:
* The base case (old) design
conditions and rerated (new)
design conditions should be
compared and evaluated.
* The code used for rerating the
equipment. Allowable stress values
and joint efficiencies should be
tabulated. Typically, when the
rerated design pressure is less than
the maximum allowable working
pressure (MAWP) of the pressure
vessel, and when the pressure vessel
has been hydrotested to a pressure
based on the MAWP, then the
rerated equipment will
be acceptable in most cases.
* The minimum required
thicknesses vs. the existing
thicknesses for each component
affected by the rerate should
be tabulated. Each value
should be clearly indicated.
For identification, components
that are failing must be indicated
in red or in different fonts.
Additionally, for further
identification of the components
28 APRIL 2022 | HydrocarbonProcessing.com
that are failing, footnotes can be
added below the tables.
* Rerating shell-and-tube heat
exchangers will be more complicated
than vessels and columns, as there
are some components in heat
exchangers that are in contact with
both the shell side and the tube
side, and with the floating head and
tubesheet. Therefore, when rerating
shell-and-tube heat exchangers,
personnel must check how the shellside
and tube-side conditions are
affecting these components.
* The remaining life of each
component and the required
inspection interval determined by
the rerate study should be tabulated.
Instead of concluding that the
equipment must be replaced when
its corrosion allowance is consumed,
it can be downrated to allow its
continued use in a less-severe design
condition. Such recommendations
can be highlighted in the report for
owner approval.
* Components requiring any
physical modifications should also
be clearly identified. If a hydro
test must be carried out, test
pressure and temperature must
be mentioned. All the relevant
attachments to the report-such
as rerated design calculations,
original manufacturer's calculations,
drawings, the manufacturer's data
reports and equipment inspection
reports-should be included. Most
importantly, revised and/or markedup
drawings, as well as new drawings
for replacement components
and rerated nameplates, must be
included in the report.
Takeaway. Based on the rerating study
and further meetings with the owner/
stakeholders, one of the following recommendations
can be concluded for equipment:
use " as is, " modify or replace. Modification
or replacement can be initiated
with a new requisition.
SUTHAN RUPESH is a Consulting
Mechanical Engineer based in
Kerala, India. He has more than
19 yr of experience in the field of
static equipment. Mr. Rupesh is
also a member of the Institution
of Engineers (India), and holds
a BEng degree in mechanical engineering from
Lukhdhirji Engineering College in Morbi, India.
HPI
MARKET
DATA
2022
HydrocarbonProcessing.com
http://www.HydrocarbonProcessing.com/Subscribe
http://www.HydrocarbonProcessing.com/Subscribe
http://www.HydrocarbonProcessing.com
http://www.HydrocarbonProcessing.com
Hydrocarbon Processing - April 2022
Table of Contents for the Digital Edition of Hydrocarbon Processing - April 2022
Contents
Hydrocarbon Processing - April 2022 - Cover1
Hydrocarbon Processing - April 2022 - Cover2
Hydrocarbon Processing - April 2022 - Contents
Hydrocarbon Processing - April 2022 - 4
Hydrocarbon Processing - April 2022 - 5
Hydrocarbon Processing - April 2022 - 6
Hydrocarbon Processing - April 2022 - 7
Hydrocarbon Processing - April 2022 - 8
Hydrocarbon Processing - April 2022 - 9
Hydrocarbon Processing - April 2022 - 10
Hydrocarbon Processing - April 2022 - 11
Hydrocarbon Processing - April 2022 - 12
Hydrocarbon Processing - April 2022 - 13
Hydrocarbon Processing - April 2022 - 14
Hydrocarbon Processing - April 2022 - 15
Hydrocarbon Processing - April 2022 - 16
Hydrocarbon Processing - April 2022 - 17
Hydrocarbon Processing - April 2022 - 18
Hydrocarbon Processing - April 2022 - 19
Hydrocarbon Processing - April 2022 - 20
Hydrocarbon Processing - April 2022 - 21
Hydrocarbon Processing - April 2022 - 22
Hydrocarbon Processing - April 2022 - 23
Hydrocarbon Processing - April 2022 - 24
Hydrocarbon Processing - April 2022 - 25
Hydrocarbon Processing - April 2022 - 26
Hydrocarbon Processing - April 2022 - 27
Hydrocarbon Processing - April 2022 - 28
Hydrocarbon Processing - April 2022 - 29
Hydrocarbon Processing - April 2022 - 30
Hydrocarbon Processing - April 2022 - 31
Hydrocarbon Processing - April 2022 - 32
Hydrocarbon Processing - April 2022 - 33
Hydrocarbon Processing - April 2022 - 34
Hydrocarbon Processing - April 2022 - 35
Hydrocarbon Processing - April 2022 - 36
Hydrocarbon Processing - April 2022 - 37
Hydrocarbon Processing - April 2022 - 38
Hydrocarbon Processing - April 2022 - 39
Hydrocarbon Processing - April 2022 - 40
Hydrocarbon Processing - April 2022 - 41
Hydrocarbon Processing - April 2022 - 42
Hydrocarbon Processing - April 2022 - 43
Hydrocarbon Processing - April 2022 - 44
Hydrocarbon Processing - April 2022 - 45
Hydrocarbon Processing - April 2022 - 46
Hydrocarbon Processing - April 2022 - 47
Hydrocarbon Processing - April 2022 - 48
Hydrocarbon Processing - April 2022 - 49
Hydrocarbon Processing - April 2022 - 50
Hydrocarbon Processing - April 2022 - 51
Hydrocarbon Processing - April 2022 - 52
Hydrocarbon Processing - April 2022 - 53
Hydrocarbon Processing - April 2022 - 54
Hydrocarbon Processing - April 2022 - 55
Hydrocarbon Processing - April 2022 - 56
Hydrocarbon Processing - April 2022 - 57
Hydrocarbon Processing - April 2022 - 58
Hydrocarbon Processing - April 2022 - 59
Hydrocarbon Processing - April 2022 - 60
Hydrocarbon Processing - April 2022 - 61
Hydrocarbon Processing - April 2022 - 62
Hydrocarbon Processing - April 2022 - 63
Hydrocarbon Processing - April 2022 - 64
Hydrocarbon Processing - April 2022 - 65
Hydrocarbon Processing - April 2022 - 66
Hydrocarbon Processing - April 2022 - 67
Hydrocarbon Processing - April 2022 - 68
Hydrocarbon Processing - April 2022 - 69
Hydrocarbon Processing - April 2022 - 70
Hydrocarbon Processing - April 2022 - 71
Hydrocarbon Processing - April 2022 - 72
Hydrocarbon Processing - April 2022 - 73
Hydrocarbon Processing - April 2022 - 74
Hydrocarbon Processing - April 2022 - 75
Hydrocarbon Processing - April 2022 - 76
Hydrocarbon Processing - April 2022 - 77
Hydrocarbon Processing - April 2022 - 78
Hydrocarbon Processing - April 2022 - 79
Hydrocarbon Processing - April 2022 - 80
Hydrocarbon Processing - April 2022 - 81
Hydrocarbon Processing - April 2022 - 82
Hydrocarbon Processing - April 2022 - 83
Hydrocarbon Processing - April 2022 - 84
Hydrocarbon Processing - April 2022 - 85
Hydrocarbon Processing - April 2022 - 86
Hydrocarbon Processing - April 2022 - 87
Hydrocarbon Processing - April 2022 - 88
Hydrocarbon Processing - April 2022 - 88A
Hydrocarbon Processing - April 2022 - 88B
Hydrocarbon Processing - April 2022 - 89
Hydrocarbon Processing - April 2022 - 90
Hydrocarbon Processing - April 2022 - Cover3
Hydrocarbon Processing - April 2022 - Cover4
Hydrocarbon Processing - April 2022 - GP-1
Hydrocarbon Processing - April 2022 - GP-2
Hydrocarbon Processing - April 2022 - GP-3
Hydrocarbon Processing - April 2022 - GP-4
Hydrocarbon Processing - April 2022 - GP-5
Hydrocarbon Processing - April 2022 - GP-6
Hydrocarbon Processing - April 2022 - GP-7
Hydrocarbon Processing - April 2022 - GP-8
Hydrocarbon Processing - April 2022 - GP-9
Hydrocarbon Processing - April 2022 - GP-10
Hydrocarbon Processing - April 2022 - GP-11
Hydrocarbon Processing - April 2022 - GP-12
Hydrocarbon Processing - April 2022 - GP-13
Hydrocarbon Processing - April 2022 - GP-14
Hydrocarbon Processing - April 2022 - GP-15
Hydrocarbon Processing - April 2022 - GP-16
Hydrocarbon Processing - April 2022 - GP-17
Hydrocarbon Processing - April 2022 - GP-18
Hydrocarbon Processing - April 2022 - GP-19
Hydrocarbon Processing - April 2022 - GP-20
Hydrocarbon Processing - April 2022 - GP-21
Hydrocarbon Processing - April 2022 - GP-22
Hydrocarbon Processing - April 2022 - GP-23
Hydrocarbon Processing - April 2022 - GP-24
Hydrocarbon Processing - April 2022 - GP-25
Hydrocarbon Processing - April 2022 - GP-26
Hydrocarbon Processing - April 2022 - GP-27
Hydrocarbon Processing - April 2022 - GP-28
Hydrocarbon Processing - April 2022 - GP-29
Hydrocarbon Processing - April 2022 - GP-30
Hydrocarbon Processing - April 2022 - GP-31
Hydrocarbon Processing - April 2022 - GP-32
Hydrocarbon Processing - April 2022 - GP-33
Hydrocarbon Processing - April 2022 - GP-34
Hydrocarbon Processing - April 2022 - GP-35
Hydrocarbon Processing - April 2022 - GP-36
Hydrocarbon Processing - April 2022 - GP-37
Hydrocarbon Processing - April 2022 - GP-38
Hydrocarbon Processing - April 2022 - GP-39
Hydrocarbon Processing - April 2022 - GP-40
Hydrocarbon Processing - April 2022 - GP-41
Hydrocarbon Processing - April 2022 - GP-42
Hydrocarbon Processing - April 2022 - GP-43
Hydrocarbon Processing - April 2022 - GP-44
https://www.nxtbook.com/gulfenergyinfo/gulfpub/HPI-Market-Data-2023-v3
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com