Plant Design, Engineering, Construction and Commissioning
dential construction. Additional details
can be found in literature1
For large projects like the cracking
and Bureau of
Labor Statistics. FIG. 1 shows that while
the material costs went up by 21% in the
12 mos prior to February 2022, bid prices
increased only 17% during the same period.
This illustrates the contractor's ability
to pass on some price increases to owners.
As a result, contractors have to look for
creative solutions to deal with this issue.
Based on prior experience, this issue will
not be transitory and is likely to persist for
several years until equilibrium returns to
the marketplace.
Project development. Project development
usually requires a detailed financial
analysis to obtain approval for investment.
This entails a discounted cash flow
analysis, which requires an estimation of
revenue, capital and operating costs and
risk. If a project has an internal rate of return
(IRR) that is higher than the cost of
capital-accounting for risk-the project
will be approved.
Every component of future revenue
and costs contains uncertainty; future revenue
depends on volumes and price; operating
costs depend on unit consumption
and unit costs of raw materials, utilities
and labor; and capital costs depend on the
cost of engineering, procurement of major
equipment and the cost of construction.
While operating costs can be accurately
estimated with modern process simulation
software, capital costs are much more
difficult to estimate precisely due to the
variability of labor and materials. As a
result, many owners and their engineers
carry a contingency in their capital cost estimation
to cover unexpected costs.
25%
20%
15%
10%
5%
0%
Sept.
2020
Nov.
2020
Jan.
2021
March
2021
May
2021
July
2021
Sept.
2021
Nov.
2021
Jan.
2022
FIG. 1. Change to construction inputs and bid prices, September 2020-February 2022.
Source: Associated General Contractors of America and Bureau of Labor Statistics.
42 JUNE 2022 | HydrocarbonProcessing.com
FIG. 2. Large cracking furnace in the
Middle East. Source: Al Bassami Industries.
furnace shown in FIG. 2, construction can
be ~30% of the total installed cost. If the
capital cost increases, the expected returns
from a project can jeopardize the economic
viability of a project. Over a period, if
enough projects are not approved, the
aggregate demand for construction materials
and labor will decline. This will help
moderate pricing, and eventually prices
will come down.
However, in the short term, creative solutions
are needed to deal with uncertainty.
It must be noted that all the projects
that were once put on hold or postponed
may emerge again in the future and will
end up creating a supply-demand issue.
It is prudent to continue seamless communication
with the owners (or potential
owners) during this postponement period
impacted by the pandemic. The same applies
with the current or potential suppliers
of materials used in construction. Lead
times for equipment and a large range of
construction materials have grown exponentially
due to the current situation.
Coping with uncertainty. While risk
and uncertainty cannot be eliminated,
ways to manage risk are discussed below.
All projects have a certain degree of
risks in executing-it is always prudent
to identify risks and make attempts to
mitigate the identified risks. A risk register
should be maintained in agreement
with the customer, and if needed, with
customer inputs incorporated. These
registers would address any uncertainties,
such as pricing, the management of
change (MoC) process and its impact on
the project, and safety aspects.2,3
Change in prices for inputs to new nonresidential construction
Year-over-year change in PPIs, Sept. 2020-Feb. 2022, not seasonally adjusted
Inputs PPI:
Bid price PPI:
12 months to:
Sept.
2020
1.8%
Feb.
2022
21%
1.8%
17%
Schedule flexibility. The ongoing COVID
pandemic over the last 2 yr has made
the world a more uncertain, volatile and a
complex place to continue business. Contractors
should explore opportunities to
continuously evolve to support business,
such as exploring flexibility in the project
schedule if it allows mitigating risks, especially
escalating costs. Allowing reasonable
time during the beginning phase of
a project (e.g., in the engineering phase)
facilitates more value creation or addition
in the front end. This may result in a reduction
in bill of materials or promote alternative
materials to reduce costs, gain process
efficiencies,
reduce eventual operating
costs, encourage creative automation, etc.
Possibilities to reduce overall costs can be
found, especially if timing is not a critical
factor due to current business conditions.
An overall review of the project schedule
makes complete sense to optimize cost
factors. If possible, tweaks in a project
schedule should be made to accommodate
design reviews to reduce project cost, accommodate
expected lead-time issues, and
synchronize/minimize staffing and workforce
deployment in different phases of a
project, especially in construction.
Open book with customer. Transparency
shown by the contractor leads to a
more confident and trusting owner, and
thereby results in a closer working relationship.
Disclosing a certain level of information-with
a non-disclosure agreement
in place, if required-helps gain an
owner's trust. At the same time, assisting
the owner to ensure the degree of change
management also helps. Depending on
the project phase and execution model
adopted, change orders can be expected in
real life. This is also the basis for contingencies
defined by the owners.
Long-term relationship with vendors.
A returning customer with an
invitation for bid tells a lot about past
performance. The relationship with a
customer should nurture itself with con
http://www.HydrocarbonProcessing.com

Hydrocarbon Processing - June 2022

Table of Contents for the Digital Edition of Hydrocarbon Processing - June 2022

Contents
Hydrocarbon Processing - June 2022 - Cover1
Hydrocarbon Processing - June 2022 - Cover2
Hydrocarbon Processing - June 2022 - Contents
Hydrocarbon Processing - June 2022 - 4
Hydrocarbon Processing - June 2022 - 5
Hydrocarbon Processing - June 2022 - 6
Hydrocarbon Processing - June 2022 - 7
Hydrocarbon Processing - June 2022 - 8
Hydrocarbon Processing - June 2022 - 9
Hydrocarbon Processing - June 2022 - 10
Hydrocarbon Processing - June 2022 - 11
Hydrocarbon Processing - June 2022 - 11A
Hydrocarbon Processing - June 2022 - 11B
Hydrocarbon Processing - June 2022 - 12
Hydrocarbon Processing - June 2022 - 13
Hydrocarbon Processing - June 2022 - 14
Hydrocarbon Processing - June 2022 - 15
Hydrocarbon Processing - June 2022 - 16
Hydrocarbon Processing - June 2022 - 17
Hydrocarbon Processing - June 2022 - 18
Hydrocarbon Processing - June 2022 - 19
Hydrocarbon Processing - June 2022 - 20
Hydrocarbon Processing - June 2022 - 21
Hydrocarbon Processing - June 2022 - 22
Hydrocarbon Processing - June 2022 - 23
Hydrocarbon Processing - June 2022 - 24
Hydrocarbon Processing - June 2022 - 25
Hydrocarbon Processing - June 2022 - 26
Hydrocarbon Processing - June 2022 - 27
Hydrocarbon Processing - June 2022 - 28
Hydrocarbon Processing - June 2022 - 29
Hydrocarbon Processing - June 2022 - 30
Hydrocarbon Processing - June 2022 - 31
Hydrocarbon Processing - June 2022 - 32
Hydrocarbon Processing - June 2022 - 33
Hydrocarbon Processing - June 2022 - 34
Hydrocarbon Processing - June 2022 - 35
Hydrocarbon Processing - June 2022 - 36
Hydrocarbon Processing - June 2022 - 37
Hydrocarbon Processing - June 2022 - 38
Hydrocarbon Processing - June 2022 - 39
Hydrocarbon Processing - June 2022 - 40
Hydrocarbon Processing - June 2022 - 41
Hydrocarbon Processing - June 2022 - 42
Hydrocarbon Processing - June 2022 - 43
Hydrocarbon Processing - June 2022 - 44
Hydrocarbon Processing - June 2022 - 45
Hydrocarbon Processing - June 2022 - 46
Hydrocarbon Processing - June 2022 - 47
Hydrocarbon Processing - June 2022 - 48
Hydrocarbon Processing - June 2022 - 49
Hydrocarbon Processing - June 2022 - 50
Hydrocarbon Processing - June 2022 - 51
Hydrocarbon Processing - June 2022 - 52
Hydrocarbon Processing - June 2022 - 53
Hydrocarbon Processing - June 2022 - 54
Hydrocarbon Processing - June 2022 - 55
Hydrocarbon Processing - June 2022 - 56
Hydrocarbon Processing - June 2022 - 57
Hydrocarbon Processing - June 2022 - 58
Hydrocarbon Processing - June 2022 - 59
Hydrocarbon Processing - June 2022 - 60
Hydrocarbon Processing - June 2022 - 61
Hydrocarbon Processing - June 2022 - 62
Hydrocarbon Processing - June 2022 - 63
Hydrocarbon Processing - June 2022 - 64
Hydrocarbon Processing - June 2022 - 65
Hydrocarbon Processing - June 2022 - 66
Hydrocarbon Processing - June 2022 - 67
Hydrocarbon Processing - June 2022 - 68
Hydrocarbon Processing - June 2022 - 69
Hydrocarbon Processing - June 2022 - 70
Hydrocarbon Processing - June 2022 - 71
Hydrocarbon Processing - June 2022 - 72
Hydrocarbon Processing - June 2022 - 73
Hydrocarbon Processing - June 2022 - 74
Hydrocarbon Processing - June 2022 - 75
Hydrocarbon Processing - June 2022 - 76
Hydrocarbon Processing - June 2022 - 77
Hydrocarbon Processing - June 2022 - 78
Hydrocarbon Processing - June 2022 - 79
Hydrocarbon Processing - June 2022 - 80
Hydrocarbon Processing - June 2022 - 81
Hydrocarbon Processing - June 2022 - 82
Hydrocarbon Processing - June 2022 - 83
Hydrocarbon Processing - June 2022 - 84
Hydrocarbon Processing - June 2022 - 85
Hydrocarbon Processing - June 2022 - 86
Hydrocarbon Processing - June 2022 - 87
Hydrocarbon Processing - June 2022 - 88
Hydrocarbon Processing - June 2022 - 89
Hydrocarbon Processing - June 2022 - 90
Hydrocarbon Processing - June 2022 - Cover3
Hydrocarbon Processing - June 2022 - Cover4
Hydrocarbon Processing - June 2022 - GP-1
Hydrocarbon Processing - June 2022 - GP-2
Hydrocarbon Processing - June 2022 - GP-3
Hydrocarbon Processing - June 2022 - GP-4
Hydrocarbon Processing - June 2022 - GP-5
Hydrocarbon Processing - June 2022 - GP-6
Hydrocarbon Processing - June 2022 - GP-7
Hydrocarbon Processing - June 2022 - GP-8
Hydrocarbon Processing - June 2022 - GP-9
Hydrocarbon Processing - June 2022 - GP-10
Hydrocarbon Processing - June 2022 - GP-11
Hydrocarbon Processing - June 2022 - GP-12
Hydrocarbon Processing - June 2022 - GP-13
Hydrocarbon Processing - June 2022 - GP-14
Hydrocarbon Processing - June 2022 - GP-15
Hydrocarbon Processing - June 2022 - GP-16
Hydrocarbon Processing - June 2022 - GP-17
Hydrocarbon Processing - June 2022 - GP-18
Hydrocarbon Processing - June 2022 - GP-19
Hydrocarbon Processing - June 2022 - GP-20
Hydrocarbon Processing - June 2022 - GP-21
Hydrocarbon Processing - June 2022 - GP-22
Hydrocarbon Processing - June 2022 - GP-23
Hydrocarbon Processing - June 2022 - GP-24
Hydrocarbon Processing - June 2022 - GP-25
Hydrocarbon Processing - June 2022 - GP-26
Hydrocarbon Processing - June 2022 - GP-27
Hydrocarbon Processing - June 2022 - GP-28
Hydrocarbon Processing - June 2022 - GP-29
Hydrocarbon Processing - June 2022 - GP-30
Hydrocarbon Processing - June 2022 - GP-31
Hydrocarbon Processing - June 2022 - GP-32
Hydrocarbon Processing - June 2022 - GP-33
Hydrocarbon Processing - June 2022 - GP-34
Hydrocarbon Processing - June 2022 - GP-35
Hydrocarbon Processing - June 2022 - GP-36
Hydrocarbon Processing - June 2022 - GP-37
Hydrocarbon Processing - June 2022 - GP-38
Hydrocarbon Processing - June 2022 - GP-39
Hydrocarbon Processing - June 2022 - GP-40
Hydrocarbon Processing - June 2022 - GP-41
Hydrocarbon Processing - June 2022 - GP-42
Hydrocarbon Processing - June 2022 - GP-43
Hydrocarbon Processing - June 2022 - GP-44
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2024
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022_v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/gas-processes-handbook-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202212
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023-v2
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hpi-market-data-2023
https://www.nxtbook.com/gulfenergyinfo/gulfpub/hp_202211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_032022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202110
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2022
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202108
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_processes_handbook_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_ebooks
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202101
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/catalyst_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202010
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2021
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202008
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020
https://www.nxtbook.com/nxtbooks/gulfpub/refining_processes_handbook_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_202001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201911
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2020
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201901
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018_v2
https://www.nxtbook.com/nxtbooks/gulfpub/petrochemical_2018
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201812
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hpimarket_2019
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201811
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201810
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201809
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201808
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201807
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201806
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201805
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201804
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201803
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201802
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201801
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201712
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201711
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201710
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201709
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201708
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201707
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201706
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201705
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201704
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201703
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201702
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201701
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2017mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201612
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201611
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201610
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201609
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201608
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201607
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201606
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201605
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201604
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201603
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201602
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201601
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201512
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201511
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201510
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2016mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201509
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201508
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201507
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015tmsd
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201506
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201505
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201504
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201503
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201502
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201501
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201412
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201411
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2015mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201410
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201409
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201408
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201407
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses_v2
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014petrochemicalprocesses
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201406
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201405
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201404
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201403
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014calendar
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201402
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201401
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201312
https://www.nxtbook.com/nxtbooks/gulfpub/hp_2014mediaplanner
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201311
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201310
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201309
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201308
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2013
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201307
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201306
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201305
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201304
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201303
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201302
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201301
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201212
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201211
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201210
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201209
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201208
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201207
https://www.nxtbook.com/nxtbooks/gulfpub/hp_srsguide2012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201206
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201205
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201204
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201203
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201202
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201201
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201112
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201111
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201110
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201109
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201108
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107_srsguide
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201107
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201106
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201105
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201104
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201103
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201102
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201101
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201012
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201011
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201010
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201009
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201008
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201007
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201006
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201005
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201004
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201003
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201002
https://www.nxtbook.com/nxtbooks/gulfpub/hp_201001
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200912
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200911
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200910
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200909
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200908
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200907
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200906
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200905
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200904
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200903
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200902
https://www.nxtbook.com/nxtbooks/gulfpub/hp_200901
https://www.nxtbookmedia.com