Underground Construction - February 2018 - 31
* Prepare recommendations to
owner regarding the contractor's resumption of work in
connection with the subsurface or physical condition in
question and the need for any
change in the drawings or
specifications.
* Advise owner in writing of engineer's findings, conclusions
and recommendations.
Owner's statement to contractor
regarding site condition
After receipt of engineer's written findings, conclusions and
recommendations, owner shall
issue a written statement to
contractor (with a copy to engineer) regarding the subsurface or
physical condition in question,
addressing the resumption of
work in connection with such
condition, indicating whether
any change in the drawings or
specifications will be made, and
adopting or rejecting engineer's
written findings, conclusions and
recommendations, in whole or
in part.
Missing or incorrect underground facilities (utilities and
other structures) information
notice by contractor
If contractor believes that an underground facility that is uncovered or revealed at the site was
not shown or indicated in the
contract documents, or was not
shown or indicated with reasonable accuracy, then contractor
shall, promptly after becoming
aware thereof and before further
disturbing conditions affected
thereby or performing any work
in connection therewith, identify
the owner of such underground
facility and give written notice to
that owner and to the engineer.
The engineer will promptly
review the underground facility
and conclude whether such underground facility was not shown
or indicated in the contract
documents, or was not shown
or indicated with reasonable
accuracy; obtain any pertinent
cost or schedule information
from contractor; prepare recommendations to owner regarding
the contractor's resumption of
work in connection with the underground facility in question;
determine the extent, if any, to
which a change is required in
the drawings or specifications to
reflect and document the consequences of the existence or location of the underground facility;
and advise owner in writing of
engineer's findings, conclusions,
and recommendations. During
such time, contractor shall be
responsible for the safety and
protection of such underground
facility.
Owner's statement to contractor
regarding underground facility
After receipt of engineer's written findings, conclusions, and
recommendations, owner shall
issue a written statement to contractor (with a copy to engineer)
regarding the underground facility in question and addressing the
resumption of work.
Hazardous environmental
condition issues
If contractor encounters, uncovers or reveals a hazardous
environmental condition whose
removal or remediation is not expressly identified in the contract
documents as being within the
scope of the work, or if contractor or anyone for whom contractor is responsible creates a hazardous environmental condition,
then contractor shall immediately secure or otherwise isolate
such condition, stop all work in
connection with such condition
and in any area affected thereby
(except in an emergency), and
notify owner and engineer (and
promptly thereafter confirm
such notice in writing). Owner
shall promptly consult with engineer concerning the necessity
for owner to retain a qualified
expert to evaluate such condition or take corrective action, if
any. Promptly after consulting
with engineer, owner shall take
such actions as are necessary to
permit owner to timely obtain
required permits and provide
contractor the written notice. If
contractor, or anyone for whom
contractor is responsible, created
the hazardous environmental
condition in question, then owner may remove and remediate
the hazardous environmental
condition and impose a set-off
against payments to account for
the associated costs.
Contractor shall not resume
work in connection with such
hazardous environmental condi-
tion or in any affected area until
after owner has obtained any
required permits related thereto,
and delivered written notice to
contractor either specifying that
such condition and any affected
area is or has been rendered safe
for the resumption of work, or
specifying any special conditions
under which such work may be
resumed safely.
This language, or similar, will
offer some protections to each
party where uncertain conditions
are encountered during construction. But these provisions do not
provide any guidance on how to
lessen the chance of encountering a DSC. In Parts 3 and 4 of
this series, we will discuss how
contracts can use a Geotechnical Base Line Report to quantify
change orders, and how ASCE 38
can be used to reduce and manage the uncertainties of existing
utilities.
About the Author:
Jim Anspach is technical practice lead for
Cardno Inc.'s Utility
Engineering and
Survey Practice. He
serves as ASCE's Utility Engineering and Surveying Institute President for 2018. He is the incoming
chair for EJCDC, and chairs the
ASCE 38 Standard Committee. He
is also a member of ASCE's Board
Committee on Claims Reduction
and Management. ■
UConOnline.com | FEBRUARY 2018
31
http://www.UConOnline.com
Underground Construction - February 2018
Table of Contents for the Digital Edition of Underground Construction - February 2018
Underground Construction - February 2018
Contents
Editor’s Log
Newsline
Washington Watch
Pipeline Projects
What About Infrastructure?
Infrastructure Funding is Next Big Legislative Target
Rural Broadband Faces Reductions in Federal Support
PCCA Prepared for a Productive 2018
Rain Delays ‘Pipe Swallowing’ Project
Underground Uncertainties in Infrastructure Work
CGA Transitions Leadership; Growth Continues
First Look: US Radar Unveils GP Rover Combined GPR, GPS Unit
CUIRE to Evaluate Potential Release of Organic Chemicals During Trenchless CIPP Pipe Rehab
Camera/Sewer Repair Equipment
NASSCO Tech Tips
Business
New Products
Events
Equipment Spotlight
Business Cards
Sales Reps
Ad Index
Underground Construction - February 2018 - Underground Construction - February 2018
Underground Construction - February 2018 - IFC
Underground Construction - February 2018 - Contents
Underground Construction - February 2018 - Editor’s Log
Underground Construction - February 2018 - 3
Underground Construction - February 2018 - Newsline
Underground Construction - February 2018 - 5
Underground Construction - February 2018 - 6
Underground Construction - February 2018 - 7
Underground Construction - February 2018 - Washington Watch
Underground Construction - February 2018 - 9
Underground Construction - February 2018 - Pipeline Projects
Underground Construction - February 2018 - 11
Underground Construction - February 2018 - What About Infrastructure?
Underground Construction - February 2018 - 13
Underground Construction - February 2018 - 14
Underground Construction - February 2018 - 15
Underground Construction - February 2018 - 16
Underground Construction - February 2018 - 17
Underground Construction - February 2018 - Infrastructure Funding is Next Big Legislative Target
Underground Construction - February 2018 - 19
Underground Construction - February 2018 - 20
Underground Construction - February 2018 - 21
Underground Construction - February 2018 - 22
Underground Construction - February 2018 - Rural Broadband Faces Reductions in Federal Support
Underground Construction - February 2018 - 24
Underground Construction - February 2018 - 25
Underground Construction - February 2018 - PCCA Prepared for a Productive 2018
Underground Construction - February 2018 - 27
Underground Construction - February 2018 - Rain Delays ‘Pipe Swallowing’ Project
Underground Construction - February 2018 - 29
Underground Construction - February 2018 - Underground Uncertainties in Infrastructure Work
Underground Construction - February 2018 - 31
Underground Construction - February 2018 - CGA Transitions Leadership; Growth Continues
Underground Construction - February 2018 - 33
Underground Construction - February 2018 - First Look: US Radar Unveils GP Rover Combined GPR, GPS Unit
Underground Construction - February 2018 - 35
Underground Construction - February 2018 - CUIRE to Evaluate Potential Release of Organic Chemicals During Trenchless CIPP Pipe Rehab
Underground Construction - February 2018 - Camera/Sewer Repair Equipment
Underground Construction - February 2018 - NASSCO Tech Tips
Underground Construction - February 2018 - 39
Underground Construction - February 2018 - Business
Underground Construction - February 2018 - 41
Underground Construction - February 2018 - 42
Underground Construction - February 2018 - 43
Underground Construction - February 2018 - New Products
Underground Construction - February 2018 - 45
Underground Construction - February 2018 - Events
Underground Construction - February 2018 - Equipment Spotlight
Underground Construction - February 2018 - 48
Underground Construction - February 2018 - Business Cards
Underground Construction - February 2018 - 50
Underground Construction - February 2018 - 51
Underground Construction - February 2018 - Ad Index
Underground Construction - February 2018 - IBC
Underground Construction - February 2018 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com