Timeline
The project scope of work specified that pipe cleaning had to be
accomplished between Oct. 15 and Dec. 15, 2018, even though
weather conditions during that time of year could complicate
marine operations. However, weather was expected to be even
worse later in the winter, and could affect all work operations,
particularly the pumped water delivery necessary to propel pigs
through the intake lines.
"The two largest challenges," said Ryan Vogt, project manager
with Galcon Marine, "were completing the project within the allocated time frame, due to poor weather conditions, and constructability of the project, which required maintaining full access on the
island for resident and emergency vehicles."
Vogt said the time frame chosen was good for the city because
it was the lowest usage interval for its clients. But from a marine
standpoint, the prevailing winds at that time of year are predominantly from a bad direction, making the retrieval of pigs, ROV
operations and drawing water for the operation very difficult.
"Using smaller gear for retrieval, proper planning, outside-thebox thinking and lots of luck from the weatherman," Vogt continued, "we were able to launch and retrieve pigs in a higher sea state.
The water used to push the pigs through the line had to come from
the inner lagoon. This forced us to run three 18-inch HDPE lines
across the main road for the island, resulting in having to construct
a highway-rated, temporary bridge to allow continued roadway
access." (The lines couldn't be buried due to underground utilities.)

"This was a large undertaking and very unconventional," he
said. "In addition, we had to construct the launcher and support
system, pour a concrete reinforcing pad for the launcher, manage
the pumping operations, facilitate the pig launching and retrieval,
coordinate site revetment, construct a display for the launcher,
ensure the system could handle the pressure requirements of the
operation, and produce a pigging manual for future reference."

Pigging operations
Rex Murphey, Montauk Services CEO, explained the actual pigging
operations.
"In order to be prepared for any cleaning contingency, we
provided 18 pigs for the project," said Murphey. "Pigs were
constructed of open cell polyurethane foam with various densities.
We used standard pigs but selected their sequence and diameters
to gradually clean the pipelines. The 2.5 pcf density swab utilized
a blue elastomer foam, which was new to the market and gave us
the flexibility of a standard swab, but with a much better cleaning
ability. Standard swabs are usually one-pound density and shot
only to 'prove' the pipeline prior to the utilization of harder pigs."
The three intake pipes converged downstream from the common
inlet. The chamber had three 60-inch connection flanges where
the pig launcher was attached. The launcher design was a joint
effort between Montauk Services, Galcon Marine and Associated
Engineering, with the local fabrication managed by Galcon.
All pigs were easily inserted into the oversized bore of the
horizontal launcher and then pushed forward against a tapered
barrel section, which reduced the diameter to 60 inches,
corresponding to the nominal pipe size. When water was pumped
UConOnline.com | OCTOBER 2019

23


http://www.UConOnline.com

Underground Construction - October 2019

Table of Contents for the Digital Edition of Underground Construction - October 2019

Contents
Underground Construction - October 2019 - FC
Underground Construction - October 2019 - IFC
Underground Construction - October 2019 - Contents
Underground Construction - October 2019 - 4
Underground Construction - October 2019 - 5
Underground Construction - October 2019 - 6
Underground Construction - October 2019 - 7
Underground Construction - October 2019 - 8
Underground Construction - October 2019 - 9
Underground Construction - October 2019 - 10
Underground Construction - October 2019 - 11
Underground Construction - October 2019 - 12
Underground Construction - October 2019 - 13
Underground Construction - October 2019 - 14
Underground Construction - October 2019 - 15
Underground Construction - October 2019 - 16
Underground Construction - October 2019 - 17
Underground Construction - October 2019 - 18
Underground Construction - October 2019 - 19
Underground Construction - October 2019 - 20
Underground Construction - October 2019 - 21
Underground Construction - October 2019 - 22
Underground Construction - October 2019 - 23
Underground Construction - October 2019 - 24
Underground Construction - October 2019 - 25
Underground Construction - October 2019 - 26
Underground Construction - October 2019 - 27
Underground Construction - October 2019 - 28
Underground Construction - October 2019 - 29
Underground Construction - October 2019 - 30
Underground Construction - October 2019 - 31
Underground Construction - October 2019 - 32
Underground Construction - October 2019 - 33
Underground Construction - October 2019 - 34
Underground Construction - October 2019 - 35
Underground Construction - October 2019 - 36
Underground Construction - October 2019 - 37
Underground Construction - October 2019 - 38
Underground Construction - October 2019 - 39
Underground Construction - October 2019 - 40
Underground Construction - October 2019 - 41
Underground Construction - October 2019 - 42
Underground Construction - October 2019 - 43
Underground Construction - October 2019 - 44
Underground Construction - October 2019 - 45
Underground Construction - October 2019 - 46
Underground Construction - October 2019 - 47
Underground Construction - October 2019 - 48
Underground Construction - October 2019 - 49
Underground Construction - October 2019 - 50
Underground Construction - October 2019 - 51
Underground Construction - October 2019 - 52
Underground Construction - October 2019 - 53
Underground Construction - October 2019 - 54
Underground Construction - October 2019 - 55
Underground Construction - October 2019 - 56
Underground Construction - October 2019 - 57
Underground Construction - October 2019 - 58
Underground Construction - October 2019 - IBC
Underground Construction - October 2019 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com