Underground Construction - November 2019 - 32

2019 Large Directional Drilling Rig Census
Driver Pipeline Co. Inc.

Gabe's Construction Co. Inc.

Horizontal Boring & Tunneling Co.

Laney Directional Drilling Co.

1200 North Union Bower Rd.
Irving, TX 75061
P: (800) 852-1405; (214) 638-7131
W: driverpipeline.com
E: jlangford@driverpipeline.com
Contact: John Langford
11 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 36 in.
Maximum Pullback: 200,000 lbs.
Maximum Torque: 25,000 ft./lbs.
Driver Pipeline has more than 20 years of
experience in the HDD industry offering
turnkey solutions to HDD projects.

4804 N. 40th St.
Sheboygan, WI 53083
P: (920) 459-2600
W: gabes.com
E: neastway@gabes.com
Contact: Nathan Eastway
5 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 625,000 lbs.
Maximum Torque: 100,000 ft./lbs.
Provides HDD services for the pipeline,
utility and telecommunications
industries throughout North America,
in all geological conditions. Also offers
six smaller utility rigs.

505 S. River Ave.
Exeter, NE 68351
P: (402) 266-5347
W: hbttrenchless.com
E: horizontalboring@hbttrenchless.com
Contact: Brent Moore
3 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 440,000 lbs.
Maximum Torque: 53,000 ft./lbs.
More than 35 years of experience
in trenchless methods including
tunneling, pipe jacking, concrete
box jacking, pilot tube/guided boring,
microtunneling, auger boring and
pipe ramming.

831 Crossbridge Dr.
Spring, TX 77373
P: (281) 540-6615
W: laneydrilling.com
E: mcarlin@laneydrilling.com
Contact: Maureen Carlin
13 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,700,000 lbs.
Maximum Torque: 97,500 ft./lbs.
Laney Directional Drilling offers turnkey
trenchless engineering and construction
services for horizontal directional
drilling, Direct Pipe, microtunneling
and pipeline extraction.

ECI Drilling International LLC
1306 North FM 3083 Rd. East
Conroe, TX 77303
P: (936) 441-9080
W: ecihdd.com
E: info@ecihdd.com
Contact: Bruce Brasher
5 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,200,000 lbs.
Maximum Torque: 95,000 ft./lbs.
Provides a full line of HDD capabilities,
including single and multiple installations
for power/communication conduits,
fiber optic cables, and water/sewage
and oil/gas pipelines.

Ellingson Trenchless LLC
56035 State Hwy 56
West Concord, MNĀ  55895
P: (844) 969-9054
W: ellingsontrenchless.com
E: mdull@ellingsontrenchless.com
Contact: Matt Dull
9 rigs with pullback of 100,000 pounds
or greater
Maximum Pipe Diameter: 52 in.
Maximum Pullback: 750,000 lbs.
Maximum Torque: 80,000 ft./lbs.
Expertise for projects that are large,
small or through hard rock. Capabilities
up to 54 inches in diameter and lengths
up to 8,000 feet.

Forages Nella Inc.
118 De La Gare
St. Henri, Quebec, Canada G0R 3E0
P: (418) 822-2002
W: nella-drilling.com
E: gilltardif@nella-drilling.com
Contact: Gill Tardif
3 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 750, 000 lbs.
Maximum Torque: 94,000 ft./lbs.
Capability to adapt our machinery and
procedures to succeed in all types of
HDD projects, regardless of size and
difficulties encountered.

32

NOVEMBER 2019 | UConOnline.com

Gator Boring & Trenching Inc.
1800 Blackbird Lane
Pensacola, FL 32534
P: (850) 477-0742
W: gatorboring.com
E: lisa@gatorboring.com
Contact: Lisa Lyons
5 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 500,000 lbs.
Maximum Torque: 50,000 ft./lbs.
Serving the southeastern United States
with 5 HDD rigs and fusion crews.
Specializing in gravity bores, subaqueous
crossings and water/sewer bores.

Horizontal Drilling International
165 Boulevard de Valmy
92700 Colombes, France
P: +33 1 57 60 93 21
W: hdi.fr
E: contact@hdi.fr
Contact: Denis Pellerin or Atef Khemiri
9 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 56 in.
Maximum Pullback: 880,000 lbs.
Maximum Torque: 100,000 ft./lbs.
More than 30 years of experience and
2,200-plus successful crossings in over
40 countries; lengths more than 2,000
meters and diameters up to 56 inches.

H&H Enterprises
6104 Fenkell Rd./PO Box 1539
Andover, OH 44003
P: (440) 293-8911
W: handhent.com
E: tom.hockran@handhent.com
Contact: Tom Hockran
3 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 220,000 lbs.
Maximum Torque: 36,000 ft./lbs.
H&H Enterprises provides services for
all your HDD needs, specializing in solid
rock, with capabilities up to 48-inch
diameter and 6,000-foot length.

Harding Directional Drilling
10711 Spur 231
Bryan, TX 77807
P: (979) 778-2691
W: hardingdrilling.com
E: rhamilton@hardingdrilling.com
Contact: Robert Hamilton
5 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 72,000 ft./lbs.
Full-service directional drilling company
serving the continental U.S., Canada
and Mexico since 1994. Completed
lengths in excess of 8,000 feet.

LMR Drilling GmbH
Ammerlaender Heerstr. 368
26129 Oldenburg, Germany
P: +49 441 97191-0
W: lmr-drilling.de
E: info@lmr-drilling.de
Contact: H. W. Hausmann,
G.P. Moogveld or G. Kruse
4 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 56 in.
Maximum Pullback: 1,000, 000 lbs.
Maximum Torque: 130,000 ft./lbs.
Horizontal directional drilling,
engineering, construction and
installation of HDD crossings,
outfalls and shore approaches.

InterCon Construction Inc.
5512 State Route 113 & 19
Waunakee, WI 53597
P: (608) 850-4827
W: intercon-const.com
E: sallen@intercon-const.com
Contact: Steve Allen
6 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 480,000 lbs.
Maximum Torque: 80,000 ft./lbs.
Nationwide contractor experienced in
all geological conditions. Consultation,
design and execution specialists offering
services to gas transmission and
distribution, water, sewer, electric
and telecom companies.

Isaacks Directional Drilling Co.
2710 FM 1069/PO Box 1112
Aransas Pass, TX 78336
P: (361) 758-7297
E: mscruggs@isaacksdd.com
Contact: Monty Scruggs
4 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 48 in.
Maximum Pullback: 1,000,000 lbs.
Maximum Torque: 93,000 ft./lbs.
Directional drilling and road boring
for the oil and gas pipeline industry.

Lucas
Emirates House, Lvl 22,
167 Eagle Street/GPO Box 144
Brisbane QLD 4000, Australia
P: 07 3363 7333
W: lucas.com.au
7 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 52 in.
Maximum Pullback: 1,100,000 lbs.
Maximum Torque: 100,000 ft./lbs.
International contractor with a strong
focus on technically challenging
projects, particularly EPL contracts.
Also specialize in hard rock drilling
utilizing patented tooling.

Mears Group Inc.
5051 Westheimer Rd., Ste. 1650
Houston, TX 77056
P: (832) 634-2900
W: mears.net
E: greg.bosch@mears.net
Contact: Gregory Bosch
18 rigs offering over 100,000-lbs. pullback
Maximum Pipe Diameter: 60 in.
Maximum Pullback: 1,300,000 lbs.
Maximum Torque: 88,000 ft./lbs.
HDD and Direct Pipe (one 500-ton rig
and one 750-ton) contractor serving oil/


http://www.driverpipeline.com http://www.gabes.com http://www.hbttrenchless.com http://www.laneydrilling.com http://www.ecihdd.com http://www.gatorboring.com http://www.hdi.fr http://www.lmr-drilling.de http://www.handhent.com http://www.ellingsontrenchless.com http://www.intercon-const.com http://lucas.com.au http://www.hardingdrilling.com http://www.nella-drilling.com http://www.mears.net http://www.UConOnline.com

Underground Construction - November 2019

Table of Contents for the Digital Edition of Underground Construction - November 2019

Contents
Underground Construction - November 2019 - FC
Underground Construction - November 2019 - IFC
Underground Construction - November 2019 - Contents
Underground Construction - November 2019 - 4
Underground Construction - November 2019 - 5
Underground Construction - November 2019 - 6
Underground Construction - November 2019 - 7
Underground Construction - November 2019 - 8
Underground Construction - November 2019 - 9
Underground Construction - November 2019 - 10
Underground Construction - November 2019 - 11
Underground Construction - November 2019 - 12
Underground Construction - November 2019 - 13
Underground Construction - November 2019 - 14
Underground Construction - November 2019 - 15
Underground Construction - November 2019 - 16
Underground Construction - November 2019 - 17
Underground Construction - November 2019 - 18
Underground Construction - November 2019 - 19
Underground Construction - November 2019 - 20
Underground Construction - November 2019 - 21
Underground Construction - November 2019 - 22
Underground Construction - November 2019 - 23
Underground Construction - November 2019 - 24
Underground Construction - November 2019 - 25
Underground Construction - November 2019 - 26
Underground Construction - November 2019 - 27
Underground Construction - November 2019 - 28
Underground Construction - November 2019 - 29
Underground Construction - November 2019 - 30
Underground Construction - November 2019 - 31
Underground Construction - November 2019 - 32
Underground Construction - November 2019 - 33
Underground Construction - November 2019 - 34
Underground Construction - November 2019 - 35
Underground Construction - November 2019 - 36
Underground Construction - November 2019 - 37
Underground Construction - November 2019 - 38
Underground Construction - November 2019 - 39
Underground Construction - November 2019 - 40
Underground Construction - November 2019 - 41
Underground Construction - November 2019 - 42
Underground Construction - November 2019 - 43
Underground Construction - November 2019 - 44
Underground Construction - November 2019 - 45
Underground Construction - November 2019 - 46
Underground Construction - November 2019 - 47
Underground Construction - November 2019 - 48
Underground Construction - November 2019 - 49
Underground Construction - November 2019 - 50
Underground Construction - November 2019 - IBC
Underground Construction - November 2019 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com