Underground Construction - November 2019 - 6
NEWSLINE LATEST INDUSTRY DEVELOPMENTS
P.O. Box 2608, Houston, TX 77252-2608, USA
Phone: (713) 529-4301, Fax: (713) 520-4433
UConOnline.com, ucinfo@ucononline.com
GROUP PUBLISHER Brian Nessen, brian.nessen@gulfenergyinfo.com
EDITORIAL
Editor-in-Chief Robert Carpenter, robert.carpenter@ucononline.com
Executive Editor Jeff Awalt, jeff.awalt@gulfenergyinfo.com
Digital Editior Jason Cockerham, jason.cockerham@gulfenergyinfo.com
Senior Editor Jeff Griffin, up-front@cox.net
Contributing Editor Cathy Schmermund, cathy.schmermund@gulfenergyinfo.com
Pipeline Editor Michael Reed, michael.reed@pgjonline.com
Washington DC Editor Stephen Barlas
MAGAZINE PRODUCTION
Vice President, Production Sheryl Stone
Manager, Advertising Production Cheryl Willis
Manager, Editorial Production Angela Dietrich
Artist/Illustrator David Weeks
UCT-EVENTS
Convention Director Karen Francis, karen.francis@gulfenergyinfo.com
ADVERTISING SALES
For complete list of sales representatives, please see page 50.
CIRCULATION
Customer Service (713) 520-4498, circulation@gulfenergyinfo.com
SUBSCRIPTIONS
Underground Construction (USPS 063-970) (ISSN 32-0188) is published
monthly by Gulf Energy Information, PO Box 2608, Houston, TX 77252-2608.
© Copyright 2019 by Gulf Energy Information LLC. All rights reserved. No part of
this publication may be transmitted or reproduced in any form or by any means,
electronic or mechanical, including photocopy, recording or any information
storage and retrieval system, without permission in writing from the Publisher.
Subscription rates are: One year is $179; two year $300; three years $390. Airmail
$175 per year in addition to specified subscription rates. Current year single issue
copies (pre-paid only): $25 plus postage. Back issues one year old or more:
$25 plus postage. Cumulative editions of this publication are available in
microfilm from University Microfilms Inc., N. Zeeb Rd, Ann Arbor, MI 48106.
Ph: (313) 761-4700. Periodical class postage paid in Houston, TX and additional
mailing offices. Postmaster and address changes to: Underground Construction,
P.O. Box 2608, Houston, TX 77252-2608
REPRINTS AND E-PRINT PRODUCTS
Foster Printing Service Jill Kaletha, (574) 289-9253 x149
President/CEO John T. Royall
CFO Alan Millis
Vice President Andy McDowell
Vice President, Finance and Operations Pamela Harvey
Vice President, Production Sheryl Stone
Vice President, Data Sales Harry Brookby
Publication Agreements Number 40034765
Printed in U.S.A.
Other Gulf Energy Information titles include: Pipeline & Gas Journal,
Pipeline News, Hydrocarbon Processing, Gas Processing, World Oil
and Petroleum Economist.
6
NOVEMBER 2019 | UConOnline.com
Fed Recommendations
Based on 2018
Massachusetts Blasts
Federal officials are recommending stronger nationwide requirements for natural gas
systems following last September's natural
gas explosions and fires in Massachusetts.
The National Transportation Safety Board
(NTSB) said every state should require
all natural gas infrastructure projects be
reviewed and approved by a licensed
professional engineer.
Nineteen states currently have such a
requirement, but most have specifically exempted the natural gas industry from such
review requirements, the office said.
"In all 50 states, you have to have a
license to cut hair, but you can design a
gas system that affects public safety, and 31
states exempt you from having a license or
even an engineering degree," said Robert
Hall, who heads the agency's office of
Railroad, Pipeline, and Hazardous Material
Investigations, during the board's discussion
and vote on the recommendations in
Washington, D.C.
The board also recommended that
natural gas utilities be required to install
additional safeguards on low pressure,
natural gas systems like the one involved in
the Sept. 13, 2018, disaster.
Officials concluded last October that
the series of explosions and fires had been
caused by a gas line that had become
over-pressurized during a routine pipeline
replacement project in Lawrence.
NTSB officials said the company should
have been aware of the inherent risks in the
pipeline upgrade work and taken necessary
precautions. Similar incidents have
happened at least seven times over the last
50 years across the U.S., including several
involving NiSource, Inc., the Indiana-based
parent company of Columbia Gas of
Massachusetts, they said.
EPA Funds Completion of
Rhode Island Tunnel Project
Rhode Island officials finally have an end in
sight for a $1.5 billion system of tunnels to
prevent tainted stormwater from entering
Narragansett Bay, following federal funding
approval to help complete the project
The microtunneller used to excavate the Seekonk
River Interceptor on Phase II (nicknamed the
"Seekonk River Monster"). Photo: Peter Goldberg
for the Narragansett Bay Commission.
The decades-long Combined Sewer
Overflow (CSO) project is the largest public
works project in Rhode Island history,
according to the Providence Journal, which
reported the first two phases have been
credited with major improvements in the
water quality of Narragansett Bay. Those
phases were completed in 2014, and the
Narragansett Bay Commission has since
completed a plan for the third, final stage.
The U.S. Environmental Protection
Agency approved a low-interest Water
Infrastructure Finance and Innovation Act
(WIFIA) loan of $269 million - about half the
amount needed to complete the project.
During heavy rain storms, combined
sewer flows can exceed the capacity of
the current system and overflow into local
rivers and the Narragansett Bay. These
overflows can carry pollutants- such as
sewage solids, metals, oil, grease and
bacteria- that can affect human health and
the environment.
The EPA's WIFIA loan will help fund the
"CSO Phase IIIA Facilities" project, which
involves construction of a 2.2-mile-long,
30-feet-wide deep rock tunnel along the
east side the Seekonk River to store and
treat stormwater before it reaches the bay.
The project also includes construction of
two work shafts, four drop shafts, a tunnel
pump station and several improvements to
the wastewater collection system.
The final CSO phase will cost $548
million. EPA's WIFIA loan will finance nearly
half of that figure - up to $269 million. The
Narragansett Bay Commission (NBC) set an
Oct. 15 deadline for contractors to submit
RFQs for Phase III construction. An RFP will
be issued to a short list in January 2020.
http://www.UConOnline.com
Underground Construction - November 2019
Table of Contents for the Digital Edition of Underground Construction - November 2019
Contents
Underground Construction - November 2019 - FC
Underground Construction - November 2019 - IFC
Underground Construction - November 2019 - Contents
Underground Construction - November 2019 - 4
Underground Construction - November 2019 - 5
Underground Construction - November 2019 - 6
Underground Construction - November 2019 - 7
Underground Construction - November 2019 - 8
Underground Construction - November 2019 - 9
Underground Construction - November 2019 - 10
Underground Construction - November 2019 - 11
Underground Construction - November 2019 - 12
Underground Construction - November 2019 - 13
Underground Construction - November 2019 - 14
Underground Construction - November 2019 - 15
Underground Construction - November 2019 - 16
Underground Construction - November 2019 - 17
Underground Construction - November 2019 - 18
Underground Construction - November 2019 - 19
Underground Construction - November 2019 - 20
Underground Construction - November 2019 - 21
Underground Construction - November 2019 - 22
Underground Construction - November 2019 - 23
Underground Construction - November 2019 - 24
Underground Construction - November 2019 - 25
Underground Construction - November 2019 - 26
Underground Construction - November 2019 - 27
Underground Construction - November 2019 - 28
Underground Construction - November 2019 - 29
Underground Construction - November 2019 - 30
Underground Construction - November 2019 - 31
Underground Construction - November 2019 - 32
Underground Construction - November 2019 - 33
Underground Construction - November 2019 - 34
Underground Construction - November 2019 - 35
Underground Construction - November 2019 - 36
Underground Construction - November 2019 - 37
Underground Construction - November 2019 - 38
Underground Construction - November 2019 - 39
Underground Construction - November 2019 - 40
Underground Construction - November 2019 - 41
Underground Construction - November 2019 - 42
Underground Construction - November 2019 - 43
Underground Construction - November 2019 - 44
Underground Construction - November 2019 - 45
Underground Construction - November 2019 - 46
Underground Construction - November 2019 - 47
Underground Construction - November 2019 - 48
Underground Construction - November 2019 - 49
Underground Construction - November 2019 - 50
Underground Construction - November 2019 - IBC
Underground Construction - November 2019 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com