2020 EQUIPMENT SELECTION GUIDE
PIPE JACKING/TBM/SBU (cont.)

PIPE LIFTING/HANDLING

Company	
Model 	
Type 	
Weight	
		
Drive	
(lbs)	
				

Boring	
Diameter	
Range (in)	

Max. Bore	
Length (ft)	

Pit 	
Size	

Total
Thrust (t)

Herrenknecht	 AVN250	
hydraulic	
varies	
14.29 - 16.34	
varies	
2M	
115
	
AVN300	
hydraulic	
varies	
16.34 - 22.24	
varies	
3M	
260
	
AVN400	
hydraulic	
varies	
22.24 - 26.18	
varies	
3M	
260
	
AVN500	
hydraulic	
varies	
26.18 - 30.12	
varies	
3M	
260
	
AVN600	
hydraulic	
varies	
30.12 - 34.45	
varies	
3M	
260
	
AVN700	
hydraulic	
varies	
34.45 - 38.38	
varies	
3.2M	
260
	AVN800B	
hydraulic	
varies	
38.38 - 43.70	
varies	
3.2M	
260
	
AVN800A	
hydraulic	
varies	
43.70 - 50.98	
varies	
4.5 x 3.5M	
340
	
AVN1000	
hydraulic	
varies	
50.98 - 60.63	
varies	
4.5 x 3.5M	
340
	
AVN1200	
hydraulic	
varies	
57.11 - 72.44	
varies	
5 x 4M	
510
	
AVN1500	
hydraulic	
varies	
72.44 - 77.17	
varies	
5 x 4M	
510
	
AVN1600 (D)	
hydraulic	
varies	
74.01 - 85.04	
varies	
5.5 x 4.5M	
850
	
AVN1800 (D)	
hydraulic	
varies	
84.25 - 98.43	
varies	
6 x 4.5M	
850
	
AVN2000 (D)	
hydraulic	
varies	
94.49 - 118.11	
varies	
6 x 4.5M	
850-1,400
	
AVN2200 (D)	
hydraulic	
varies	
100.3 - 125.98	
varies	
varies
	 1,220-1,400
	
AVN2400 (D)	
hydraulic	
varies	
118.11 - 141.73	
varies	
varies
	 1,220-2,100
	EPB1400	
hydraulic	
varies	
66.92 - 70.08	
varies	
varies	
610-700
	EPB1500	
hydraulic	
varies	
70.08 - 76.38	
varies	
varies	
610-700
	EPB1600	
hydraulic	
varies	
76.38 - 85.04	
varies	
varies	
610-700
	EPB1800	
hydraulic	
varies	
84.25 - 98.43	
varies	
varies
	 1,220-1,400
	
EPB2000	
hydraulic	
varies	
94.49 - 118.11	
varies	
varies	
1,220-1,400
	
EPB2200	
hydraulic	
varies	
106.3 - 125.98	
varies	
varies	
1,220-1,400
	EPB2400	
hydraulic	
varies	
118.11 - 141.73	
varies	 varies	1,220-1,400
	
AVN800B (rock)	
hydraulic	
varies	
37.8 - 42.91	
varies	
varies	
260
	
TBM 1200 (rock)	
hydraulic	
varies	
58.66 - 66.93	
varies	
varies	
610-700
	
TBM 1600 (rock)	
hydraulic	
varies	
76.38 - 85.04	
varies	
varies	
610-700
	
TBM 2000 (rock)	
hydraulic	
varies	
94.49 - 118.11	
varies	
varies	
1,220-1,400
	
TBM 2200 (rock)	
hydraulic	
varies	
106.3 - 125.98	
varies	
varies	
1,220-1,400
	
TBM 2500 (rock)	
hydraulic	
varies	
118.11 - 141.73	
varies	
varies	1,220-2,100
	
Note: (D) Slurry machines available with D-Mode/pressure compensation by air cushion in the working chamber
Robbins	
Company	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	
	

DN250	
DN300	
DN400	
DN450	
DN500	
DN600	
DN800	
DN900	
DN1,000	
DN1,200	
DN1,350	
DN1,500	
DN1,600	
DN1,800	
DN2,000	
DN2,200	
DN2,400	
DN2,600	
DN3,000	

electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	
electric 	

varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	

14.5	
16.2	
22.24	
24.22	
26.18	
30.71	
43.7	
47.64	
50.98	
59.25	
65.35	
71.26	
75.98	
84.65	
95.47	
107.28	
119.1	
123.11	
142.72	

varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	

varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	
varies	

147T
147T
196T
196T
294T
294T
392T
392T
392T
588T
588T
588T
784T
784T
784T
1,176T
1,176T
1,176T
1,568T

Company	
Model	
HP	
				
125	
310	
366	

Operating 	
Weight (lbs)	

Lifting
Capacity (lbs)

37,480	
40,000
106,807	 160,000
120,119	 214,000

Midwestern 	
John Deere 1050K	
350	
78,700-82,079 	
Mfg.				
107/89	
124/149	
304/318	
70/92	
85/92	
101/104	
125	
125	
150	
165	
205	
205	
335/305	
410	
105	
200	
200	
300	
410	

Volvo	

241	 77,228	121,000
381	
129,191	 242,508

48

JUNE 2020 | UConOnline.com

18,000	
26,500	
45,000	
23,000	
24,000	
26,000	
42,000	
40,000	
50,000	
48,000	
65,000	
70,000	
105,000	
128,500	
35,000	
50,800	
61,300	
90,300	
123,600	

170,000220,000
10,000
16,000
33,000
10,000
15,000
20,000
40,000
40,000
50,000
60,000
90,000
100,000
140,000
200,000
40,000
60,000
90,000
140,000
200,000

	
M10R-JD410K/CAT 420E	
	
M16R-JD444K/CAT 930H	
	
M33R-JD744K/CAT 980H	
	
M510C-JD450J/CAT D4K	
	
M515C-JD550K/CAT D4K	
	
M520C-JD650/CAT D5K	
	M540C-JD700K	
	
M540CK-CAT D6K (2)	
	
M550C-CAT D6N 	
	M560C-JD750K	
	
M572C-CAT D6T	
	M572CXL-JD850K	
	
M583C-JD1050J/CAT D8R	
	
M594C-CAT D9H	
	
561MMC-CAT 561*	
	
571MMC-CAT 571*	
	
572MMC-CAT 572*	
	
583MMC-CAT 583*	
	
594MMC-CAT 594*	
	
*hydraulic conversion kits
PL3005E	
	PL4809E	

LaValley	 DHXS	
10,000	
2-24	
88 x 27 x 41"	
1,749	
12-16-ton excavators
Industries	 DHS	
20,000	
4-24	
83 x 22 x 45.3"	
2,100	
12-20 metric-ton
						excavator
	
DHDH5HP	
30,000	
4-24	
93 x 76 x 70"	
4,068	
20-36-ton excavators
	
DH	
30,000	
4-24	
83 x 33 x 64"	
2,892	
20-36 metric-ton
						excavator
	
DHL	
40,000	
20-48	
112 x 46 x 69"	
3,650	
36-49 metric-ton
						excavator
	
DHXL	
50,000	
28-56	
112 x 46 x 70"	
4,000	
65-75 metric-ton
						excavator
	
DHXXL	
60,000	
40-60	
129 x 46 x 71"	
5,000	
80-90 metric-ton
						excavator
Vacuworx	

MC 3	
6,600	
4 - 12	
59"x 65.5"x 18.5"	
1,183	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
MC 5	
11,000	
4 - 18	
64.5"x 65.5"x 20"	
1,828	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
RC 10	
22,000	
4 - unlimited	 103"x 77"x 21"	
2,132	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
RC 12	
26,400	
4 - unlimited	 103"x 77"x 21"	
2,132	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
RC 16	
35,200	
4 - unlimited	 103"x 74"x 22"	
2,397	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
RC 20	
44,000	
4 - unlimited	 103"x 76.5"x 21"	
2,560	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader
	
RC 25	
55,000	
4 - unlimited	 103"x 76.5"x 21	
2,560	
hydraulic excavator, 	
						
crane, pipelayer, 	
						wheel/track loader

PIPE RAMMING
Company	
Model 	
Type 	
Weight	
Boring	
Max. 	
Surface
		
Drive	(lbs)	Diameter	 Bore	 Launch
				
Range (in) 	
Length (ft)	
(ft)

HammerHead	
Trenchless	
	
	
	
	
	
	
	
	
	

TT 	
Technologies	

PIPELAYERS
Caterpillar	PL61	
	PL83	
	PL87	

Company	
Model	
Capacity	
Pipe Diameter	
Dimensions	
Weight	
Carrier Type
		 (lbs)	(in)	 (beam)	 (lbs)	

	
	
	
	
	
	
	
	
	
	
	
	
	
	

4" RH SR 	
5.125" SR 	
5.50" SR 	
5.75" SR 	
7" AR 	
8" AR 	
12" AR 	
16" AR 	
20" AR 	
26" XPR 	
34" AR 	

air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	

136	
214	
170	
305	
511	
900	
1,568	
2,701	
5,750	
12,500	
27,500	

2-4 	
4-8 	
2-4 	
6 - 12 	
8 - 20 	
8 - 24 	
12 - 30 	
16 - 48 	
20 - 54 	
24 - 84 	
36 - 180 	

300	
300	
300	
300	
300	
300	
300	
300	
300	
300	
300	

2X5
2X5
2X5
3 X 30
3 X 30
3 X 30
3 X 30
3 X 30
3 X 30
3 X 40
3 X 40

Mini-Atlas	
Titan	
Mini-Olympus	
Olympus	
PCG180 Reversible	
Hercules	
HV220 Reversible	
Mini-Gigant	
Gigant	
PCG210	
PCG270 Reversible	
Koloss	
Goliath	
Goliath Reversible	
Taurus	
Apollo	

air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	
air	

132	
302	
385	
507	
490	
811	
945	
1,014	
1,356	
866	
1,540	
2,601	
5,434	
5,434	
10,580	
25,000	

2 - 8	
8 - 15	
4 - 16	
8 - 20	
8 - 20	
12 - 20	
12 - 20	
8 - 24	
15 - 32	
10 - 20	
15 - 32	
20 - 48	
24 - 56	
24 - 56	
56 - 78	
56 - 122	

50	
80	
80	
115	
115
130	
130	
115	
165	
150	
165	
230	
265	
265
265	
300	

3 x 20
3 x 30
3 x 30
3 x 30
3 x 30
3 x 30
3 x 20
3 x 30
3 x 30
3 x 30
3 x 30
3 x 30
3 x 30
3 x 30


http://www.UConOnline.com

Underground Construction - June 2020

Table of Contents for the Digital Edition of Underground Construction - June 2020

Contents
Underground Construction - June 2020 - FC
Underground Construction - June 2020 - IFC
Underground Construction - June 2020 - Contents
Underground Construction - June 2020 - 4
Underground Construction - June 2020 - 5
Underground Construction - June 2020 - 6
Underground Construction - June 2020 - 7
Underground Construction - June 2020 - 8
Underground Construction - June 2020 - 9
Underground Construction - June 2020 - 10
Underground Construction - June 2020 - 11
Underground Construction - June 2020 - 12
Underground Construction - June 2020 - 13
Underground Construction - June 2020 - 14
Underground Construction - June 2020 - 15
Underground Construction - June 2020 - 16
Underground Construction - June 2020 - 17
Underground Construction - June 2020 - 18
Underground Construction - June 2020 - 19
Underground Construction - June 2020 - 20
Underground Construction - June 2020 - 21
Underground Construction - June 2020 - 22
Underground Construction - June 2020 - 23
Underground Construction - June 2020 - 24
Underground Construction - June 2020 - 25
Underground Construction - June 2020 - 26
Underground Construction - June 2020 - 27
Underground Construction - June 2020 - 28
Underground Construction - June 2020 - 29
Underground Construction - June 2020 - 30
Underground Construction - June 2020 - 31
Underground Construction - June 2020 - 32
Underground Construction - June 2020 - 33
Underground Construction - June 2020 - 34
Underground Construction - June 2020 - 35
Underground Construction - June 2020 - 36
Underground Construction - June 2020 - 37
Underground Construction - June 2020 - 38
Underground Construction - June 2020 - 39
Underground Construction - June 2020 - 40
Underground Construction - June 2020 - 41
Underground Construction - June 2020 - 42
Underground Construction - June 2020 - 43
Underground Construction - June 2020 - 44
Underground Construction - June 2020 - 45
Underground Construction - June 2020 - 46
Underground Construction - June 2020 - 47
Underground Construction - June 2020 - 48
Underground Construction - June 2020 - 49
Underground Construction - June 2020 - 50
Underground Construction - June 2020 - 51
Underground Construction - June 2020 - 52
Underground Construction - June 2020 - 53
Underground Construction - June 2020 - 54
Underground Construction - June 2020 - 55
Underground Construction - June 2020 - 56
Underground Construction - June 2020 - 57
Underground Construction - June 2020 - 58
Underground Construction - June 2020 - IBC
Underground Construction - June 2020 - BC
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com