Collaboration Secures the Success of Rehab Bypass Project
The three pump locations each had a
specific number of pumps and pump sizes to
allow the bypass to achieve the correct flow
rate. Each pump was set in containment
berms to lower the risk of environmental
impact, and they were connected via an
auto dialer capable of calling PWC, Crowder
Construction and Sunbelt Rentals in the
event of an emergency.
Pump Location One included six, 18inch Quiet Flow Diesel pumps, three of
which were primary and three backups,
to accomplish the required flow rate of
18,750 gpm. There was also one standby
pump. Each pump was self-contained with
environmental skids to contain 120 percent
of the on-board fluids. Combined, the
primary pumps were capable of producing
25,000 GPM, above the GPM required.
Pump Location Two was set up similar
to location one, with the exception of
smaller pumps and fewer backup pumps.
It included four 18-inch Quiet Flow
Diesel pumps designed to provide a flow
rate of 12,500 gpm, with two backups. A
standby pump was also added.
Both pump locations one and two included a suction location with independent
HDPE SDR 17 suction tubes, 24-inch HDPE
SDR 17 for location one and an 18-inch
HDPE SDR 17 for location two, placed in
the manholes. Each pump utilized independent HDPE SDR 26 discharge piping, which
will be connected through a 36-inch barrel
manifold with 18-inch flanges in and 24inch flanges out, exiting into the 24-inch
HDPE SDR 26 main discharge line.
Each manifold connection included an
18-inch knife gate valve to allow for independent isolation of each of the pumps. In
case of pump failure, the pumps could be
removed while under bypass and a backup
one set up. At the suction location, the
pumps were discharged into 24-inch HDPE
SRD 26 discharge piping.
Pump Location Three was located at a
manhole, where it was necessary to install
a 12- to 24-inch sewer plug in the downstream invert to create a wet well. There
were also two, 6-inch diesel trash pumps
installed to achieve 2,083 gpm, with one as
the primary and the other as backup.
The teams also installed a backflush line,
so the pump station could back flush waste
that was not collected back into the sewer
line. This allowed it to be regenerated to
clean drinking water.
The path to success with the Cross Creek
WRF Influent Pump Station rehabilitation was thoroughly a group effort. It
required ongoing communications between
stakeholders and plan revisions to ensure
every scenario was covered to complete
a safe bypass. The result was a relatively
short timeline for completing the project.
Planning began in February 2019 and the
project was completed, including breakdown, in October 2019.
With these improvements, the station is
now functioning effectively and safely. *
FOR MORE INFORMATION:
Crowder Construction, (800) 849-2966,
crowderusa.com/
Sunbelt Rentals, (800) 667-9328,
sunbeltrentals.com
Gemini HDD
®
ONLY AT SHAREWELL HDD
Gemini® HDD cutters and bits utilize Smith Bits 115 years of
product development to deliver the most advanced material
and design technology available today, thus producing the
highest rates of penetration and operating hours. Over a century
of experience, science, and technology translates into superior
performance that will yield the lowest total cost per foot drilled.
With proven performance, up to and exceeding 400 operating
hours, choosing the right tooling for your next project becomes
easy. Gemini® HDD cutters and bits, available only at Sharewell HDD.
281.288.2560 | SharewellHDD.com
1
APRIL 2021 | UCONonline.com
26GeminiHDDHalfPageAd.indd
3/26/21 3:07 PM
http://www.crowderusa.com/
http://www.sunbeltrentals.com
http://www.SharewellHDD.com
http://www.UCONonline.com
Underground Construction - April 2021
Table of Contents for the Digital Edition of Underground Construction - April 2021
Contents
Underground Construction - April 2021 - CT1
Underground Construction - April 2021 - CT2
Underground Construction - April 2021 - Cover1
Underground Construction - April 2021 - Cover2
Underground Construction - April 2021 - Contents
Underground Construction - April 2021 - 4
Underground Construction - April 2021 - 5
Underground Construction - April 2021 - 6
Underground Construction - April 2021 - 7
Underground Construction - April 2021 - 8
Underground Construction - April 2021 - 9
Underground Construction - April 2021 - 10
Underground Construction - April 2021 - 11
Underground Construction - April 2021 - 12
Underground Construction - April 2021 - 13
Underground Construction - April 2021 - 14
Underground Construction - April 2021 - 15
Underground Construction - April 2021 - 16
Underground Construction - April 2021 - 17
Underground Construction - April 2021 - 18
Underground Construction - April 2021 - 19
Underground Construction - April 2021 - 20
Underground Construction - April 2021 - 21
Underground Construction - April 2021 - 22
Underground Construction - April 2021 - 23
Underground Construction - April 2021 - 24
Underground Construction - April 2021 - 25
Underground Construction - April 2021 - 26
Underground Construction - April 2021 - 27
Underground Construction - April 2021 - 28
Underground Construction - April 2021 - 29
Underground Construction - April 2021 - 30
Underground Construction - April 2021 - 31
Underground Construction - April 2021 - 32
Underground Construction - April 2021 - 33
Underground Construction - April 2021 - 34
Underground Construction - April 2021 - 35
Underground Construction - April 2021 - 36
Underground Construction - April 2021 - 37
Underground Construction - April 2021 - 38
Underground Construction - April 2021 - 39
Underground Construction - April 2021 - 40
Underground Construction - April 2021 - 41
Underground Construction - April 2021 - 42
Underground Construction - April 2021 - 43
Underground Construction - April 2021 - 44
Underground Construction - April 2021 - 45
Underground Construction - April 2021 - 46
Underground Construction - April 2021 - 47
Underground Construction - April 2021 - 48
Underground Construction - April 2021 - 49
Underground Construction - April 2021 - 50
Underground Construction - April 2021 - Cover3
Underground Construction - April 2021 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com