MANHOLE REHABILITATION
SPECIFICATION TIPS
By NASSCO Member Karol Giokas, PE - RJN Group, Inc.
NASSCO has elevated and standardized the
approach for inspecting sewer assets, both
sewers using Pipeline Assessment Certification
Program (PACP™) standards and structures
using Manhole Assessment Certification Program
(MACP™) standards. However, once a structure
inspection has been performed, how do you get to
a rehabilitation program and develop specifications
for bidding?
Gathering Attribute Data
Assuming that the inspection and attribute data
collection were performed using MACP standards,
the data needed for developing a specification is
readily available and includes:
* Structure ID number
* Address and rough location description-road,
highway, easement, field
* Surface and cover type
* Structure depth, size, shape, and wall material
* Chimney height
Adhering to MACP standards is highly
recommended for creating a homogenous
dataset for assets systemwide and across various
inspection crews or contractors. One additional
piece of requisite asset data, floodplain status,
comes from FEMA floodplain maps. Once you
have acquired all of this information, you can begin
to build your rehabilitation plan.
Rehabilitation Determination
Several considerations must be addressed to
narrow down the field of available rehabilitation
options before the process advances further:
* Are there specific rehabilitation methods that
the owner does or does not want to use?
* Are there scheduling restrictions?
* What work will be contracted versus selfperformed
by the owner?
* What items will be considered incidental-e.g.,
mobilization, traffic control, bypass pumping,
restoration, testing, etc.?
* What is the desired warranty?
* Will work be phased or completed in one
contract?
With these questions answered, initial rehabilitation
methods can be developed and then grouped by
type or location into a project that fits within the
owner's budget.
Typical manhole rehabilitation methods include:
* Adjustment or replacement of frame and cover
* Chimney seals
* Lining for either structural rehabilitation or
chemical protection
* Chemical grouting for inflow and infiltration (I/I)
* Repair or replacement of the bench and trough
Additional options include the installation of barrel
sections, complete manhole replacement, or
performing O&M work such as cleaning or root
removal.
Preliminary rehabilitation recommendations may
require adjustment based on additional external
factors, such as being located within a brick
driveway, state highway, or floodplain. Manholes in
a 100-year flood zone have requirements to raise
the rim elevation above the base flood elevation or
install a bolted frame or sealing cover.
Some items will be incidental to the cost of an
existing bid item. For example, for sewers under
15 inches in diameter, bypass pumping will likely
be incidental. For larger sanitary sewers, bypass
pumping is often listed as a separate line item.

Underground Construction - November 2021

Table of Contents for the Digital Edition of Underground Construction - November 2021

Contents
Underground Construction - November 2021 - Cover1
Underground Construction - November 2021 - Cover2
Underground Construction - November 2021 - Contents
Underground Construction - November 2021 - 4
Underground Construction - November 2021 - 5
Underground Construction - November 2021 - 6
Underground Construction - November 2021 - 7
Underground Construction - November 2021 - 8
Underground Construction - November 2021 - 9
Underground Construction - November 2021 - 10
Underground Construction - November 2021 - 11
Underground Construction - November 2021 - 12
Underground Construction - November 2021 - 13
Underground Construction - November 2021 - 14
Underground Construction - November 2021 - 15
Underground Construction - November 2021 - 16
Underground Construction - November 2021 - 17
Underground Construction - November 2021 - 18
Underground Construction - November 2021 - 19
Underground Construction - November 2021 - 20
Underground Construction - November 2021 - 21
Underground Construction - November 2021 - 22
Underground Construction - November 2021 - 23
Underground Construction - November 2021 - 24
Underground Construction - November 2021 - 25
Underground Construction - November 2021 - 26
Underground Construction - November 2021 - 27
Underground Construction - November 2021 - 28
Underground Construction - November 2021 - 29
Underground Construction - November 2021 - 30
Underground Construction - November 2021 - 31
Underground Construction - November 2021 - 32
Underground Construction - November 2021 - 33
Underground Construction - November 2021 - 34
Underground Construction - November 2021 - 35
Underground Construction - November 2021 - 36
Underground Construction - November 2021 - 37
Underground Construction - November 2021 - 38
Underground Construction - November 2021 - 39
Underground Construction - November 2021 - 40
Underground Construction - November 2021 - 41
Underground Construction - November 2021 - 42
Underground Construction - November 2021 - 43
Underground Construction - November 2021 - 44
Underground Construction - November 2021 - 45
Underground Construction - November 2021 - 46
Underground Construction - November 2021 - 47
Underground Construction - November 2021 - 48
Underground Construction - November 2021 - 49
Underground Construction - November 2021 - 50
Underground Construction - November 2021 - Cover3
Underground Construction - November 2021 - Cover4
Underground Construction - November 2021 - UCT1
Underground Construction - November 2021 - UCT2
Underground Construction - November 2021 - UCT3
Underground Construction - November 2021 - UCT4
Underground Construction - November 2021 - UCT5
Underground Construction - November 2021 - UCT6
Underground Construction - November 2021 - UCT7
Underground Construction - November 2021 - UCT8
Underground Construction - November 2021 - UCT9
Underground Construction - November 2021 - UCT10
Underground Construction - November 2021 - UCT11
Underground Construction - November 2021 - UCT12
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com