Underground Construction - January 2022 - 45

LEFT: Addressing the limited space and project requirement to
evenly divide the flow from eight pumps into four aeration basins,
stakeholders implemented a common manifold that hydraulically
balanced the system flow.
ABOVE: The bypass required holding the water level in the aeration
basin vertically within eight inches - similar bypass projects typically
allow three to five feet of variance to control the water level.
Connecting high-resolution, submersible level transducers to
variable frequency drives (VFD) controlled the pump operation
according to flow, ensuring water levels remained within the allowable
eight-inch depth. The four primary electric pumps operated to
each manage two inches of water vertically. The four diesel pumps
were each offset by one inch. This arrangement kept the amount of
water coming in consistent with the amount being pumped out -
staying within the eight-inch variance.
Backup
control the water level. If the water lowered too far, the aeration
paddles would no longer touch the water, preventing them from
introducing air into the waste stream. Conversely, if the water rose
too high, it would trip the breaker.
Solutions
Addressing these challenges required placing eight, 18-inch DR17
HDPE suction tubes into the aeration basin and mating them to
eight 12-inch pumps. Each pump discharged utilizing 12-inch
DR26 HDPE pipes connected to a discharge manifold that, in
turn, tied into four parallel runs of 24-inch DR26 HDPE pipe. In
addition, four 24-inch pipes connected between the clarifiers.
Because of the limited space to run these pipes between the
aeration basin and the four clarifiers, they had to be placed much
closer together than usual during a bypass. Sunbelt Rentals
also had to figure out how to position the pumps. The solution
consisted of four electric 150 HP, 12-inch pumps operating
on the temporary site utility power that was available. These
pumps handled the peak flow and the average daily flow during
the bypass. Four diesel 150 HP, 12-inch pumps backed up the
electric pumps for a power-out condition. Because of the limited
space, project managers needed to alter the pump configuration,
staggering the electric and diesel pumps.
While the diesel pumps served as backup to the main electric pumps,
the PumpSentri telemetry system from Sunbelt Rentals provided
further protection. PumpSentri - integrated on both the electric
driven and diesel driven pumps - offered remote monitoring and
data logging throughout the bypass. This eliminated the need to
employ a 24-hour, onsite pump watch, as well as the associated cost.
PumpSentri also allowed fault alarms to be selected according to
stakeholders' preference - text, email or voice call. Emergency project
contacts receive alerts when standby pumps turn on or water levels are
too high. It is added assurance to safeguard against critical conditions
that could damage equipment or jeopardize a bypass project.
In the case of the Lower Berkeley WWTP project, PumpSentri alerted
personnel of one potential event.
The system also allowed project managers to monitor pump activity
around the clock, along with providing information on pump vacuum
pressure, discharge pressure and vibration. Check-engine status and
runtime were also accessible.
With innovative solutions to address both space limitations and
tight water-level variance, improvements to the aeration system at
the Lower Berkeley WWTP were a success. As with any bypass project,
clear communication and a solid partnership between stakeholders also
contributed to getting the job done well and on time. The project took
two months to complete. *
DWIGHT EVANS is the manager - technical support, Pump Solutions
for Sunbelt Rentals
UCONonline.com | JANUARY 2022 45
http://www.UCONonline.com

Underground Construction - January 2022

Table of Contents for the Digital Edition of Underground Construction - January 2022

Contents
Underground Construction - January 2022 - Cover1
Underground Construction - January 2022 - Cover2
Underground Construction - January 2022 - Contents
Underground Construction - January 2022 - 4
Underground Construction - January 2022 - 5
Underground Construction - January 2022 - 6
Underground Construction - January 2022 - 7
Underground Construction - January 2022 - 8
Underground Construction - January 2022 - 9
Underground Construction - January 2022 - 10
Underground Construction - January 2022 - 11
Underground Construction - January 2022 - 12
Underground Construction - January 2022 - 13
Underground Construction - January 2022 - 14
Underground Construction - January 2022 - 15
Underground Construction - January 2022 - 16
Underground Construction - January 2022 - 17
Underground Construction - January 2022 - 18
Underground Construction - January 2022 - 19
Underground Construction - January 2022 - 20
Underground Construction - January 2022 - 21
Underground Construction - January 2022 - 22
Underground Construction - January 2022 - 23
Underground Construction - January 2022 - 24
Underground Construction - January 2022 - 25
Underground Construction - January 2022 - 26
Underground Construction - January 2022 - 27
Underground Construction - January 2022 - 28
Underground Construction - January 2022 - 29
Underground Construction - January 2022 - 30
Underground Construction - January 2022 - 31
Underground Construction - January 2022 - 32
Underground Construction - January 2022 - 33
Underground Construction - January 2022 - 34
Underground Construction - January 2022 - 35
Underground Construction - January 2022 - 36
Underground Construction - January 2022 - 37
Underground Construction - January 2022 - 38
Underground Construction - January 2022 - 39
Underground Construction - January 2022 - 40
Underground Construction - January 2022 - 41
Underground Construction - January 2022 - 42
Underground Construction - January 2022 - 43
Underground Construction - January 2022 - 44
Underground Construction - January 2022 - 45
Underground Construction - January 2022 - 46
Underground Construction - January 2022 - 47
Underground Construction - January 2022 - 48
Underground Construction - January 2022 - 49
Underground Construction - January 2022 - 50
Underground Construction - January 2022 - Cover3
Underground Construction - January 2022 - Cover4
https://www.nxtbook.com/gulfenergyinfo/gulfpub/underground-construction-december-2022
https://www.nxtbook.com/gulfenergyinfo/gulfpub/uc_202211
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202210
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202209
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202208
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202207
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202206
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202205
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202204
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202203
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202202
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202201
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202112
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202111
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202110
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202109
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202108
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202107
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202106
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202105
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202104
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202103
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202102
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202101
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202012
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202011
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202010
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202009
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202008
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202007
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202006
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202005
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202004
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202003
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202002
https://www.nxtbook.com/nxtbooks/gulfpub/uc_202001
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201912
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201911
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201910
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201909
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201908
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201907
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201906
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_summer2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201905
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201904
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201903
https://www.nxtbook.com/nxtbooks/gulfpub/uesi_winter2019
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201902
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201901
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201812
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201811
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201810
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201809
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201808
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201807
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201806
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201805
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201804
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201803
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201802
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201801
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201712
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201711
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201710
https://www.nxtbook.com/nxtbooks/gulfpub/uc_ditchwitch
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201709
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201708
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201707
https://www.nxtbook.com/nxtbooks/gulfpub/uc_201706
https://www.nxtbookmedia.com