BMP - Utility Tree Risk Assessment - 90

risk: the combination of the likelihood of an event and the severity of the
potential consequences. In the context of trees, risk is the likelihood of a
conflict or tree failure occurring and affecting a target and the severity of the
associated consequences-personal injury, property damage, or disruption
of activities.
risk aggregation: the consideration of risks in combination.
risk analysis: the systematic use of information to identify sources of risk
and to estimate the risk.
risk assessment: the process of risk identification, analysis, and
evaluation.
risk assessment time frame: the forward-looking time interval over
which likelihood of tree or tree part failure is to be evaluated.
risk evaluation: the process of comparing the assessed risk against given
risk criteria to determine the significance of the risk.
risk management: the application of policies, procedures, and practices
to identify, evaluate, mitigate, monitor, and communicate risk.
risk rating matrix: a tool for ranking and displaying risks by assigning
ratings for consequences and likelihood.
sounding: the process of striking a tree with a mallet or other appropriate tool and listening for tones that indicate dead bark, a thin layer of
wood outside a cavity, or cracks in wood.
structural defect: feature, condition, or deformity of a tree that indicates a weak structure or instability that could contribute to tree failure.
taper: change in diameter over the length of trunks, branches, and roots.
target (risk target): electric utility transmission and distribution system
infrastructure that could be injured, damaged, or disrupted by a tree failure.
target zone: the area where a tree or tree part is likely to land if it were
to fail.
90



BMP - Utility Tree Risk Assessment

Table of Contents for the Digital Edition of BMP - Utility Tree Risk Assessment

Table of Contents
BMP - Utility Tree Risk Assessment - Cover1
BMP - Utility Tree Risk Assessment - Cover2
BMP - Utility Tree Risk Assessment - i
BMP - Utility Tree Risk Assessment - ii
BMP - Utility Tree Risk Assessment - Table of Contents
BMP - Utility Tree Risk Assessment - iv
BMP - Utility Tree Risk Assessment - v
BMP - Utility Tree Risk Assessment - vi
BMP - Utility Tree Risk Assessment - vii
BMP - Utility Tree Risk Assessment - viii
BMP - Utility Tree Risk Assessment - ix
BMP - Utility Tree Risk Assessment - x
BMP - Utility Tree Risk Assessment - xi
BMP - Utility Tree Risk Assessment - xii
BMP - Utility Tree Risk Assessment - 1
BMP - Utility Tree Risk Assessment - 2
BMP - Utility Tree Risk Assessment - 3
BMP - Utility Tree Risk Assessment - 4
BMP - Utility Tree Risk Assessment - 5
BMP - Utility Tree Risk Assessment - 6
BMP - Utility Tree Risk Assessment - 7
BMP - Utility Tree Risk Assessment - 8
BMP - Utility Tree Risk Assessment - 9
BMP - Utility Tree Risk Assessment - 10
BMP - Utility Tree Risk Assessment - 11
BMP - Utility Tree Risk Assessment - 12
BMP - Utility Tree Risk Assessment - 13
BMP - Utility Tree Risk Assessment - 14
BMP - Utility Tree Risk Assessment - 15
BMP - Utility Tree Risk Assessment - 16
BMP - Utility Tree Risk Assessment - 17
BMP - Utility Tree Risk Assessment - 18
BMP - Utility Tree Risk Assessment - 19
BMP - Utility Tree Risk Assessment - 20
BMP - Utility Tree Risk Assessment - 21
BMP - Utility Tree Risk Assessment - 22
BMP - Utility Tree Risk Assessment - 23
BMP - Utility Tree Risk Assessment - 24
BMP - Utility Tree Risk Assessment - 25
BMP - Utility Tree Risk Assessment - 26
BMP - Utility Tree Risk Assessment - 27
BMP - Utility Tree Risk Assessment - 28
BMP - Utility Tree Risk Assessment - 29
BMP - Utility Tree Risk Assessment - 30
BMP - Utility Tree Risk Assessment - 31
BMP - Utility Tree Risk Assessment - 32
BMP - Utility Tree Risk Assessment - 33
BMP - Utility Tree Risk Assessment - 34
BMP - Utility Tree Risk Assessment - 35
BMP - Utility Tree Risk Assessment - 36
BMP - Utility Tree Risk Assessment - 37
BMP - Utility Tree Risk Assessment - 38
BMP - Utility Tree Risk Assessment - 39
BMP - Utility Tree Risk Assessment - 40
BMP - Utility Tree Risk Assessment - 41
BMP - Utility Tree Risk Assessment - 42
BMP - Utility Tree Risk Assessment - 43
BMP - Utility Tree Risk Assessment - 44
BMP - Utility Tree Risk Assessment - 45
BMP - Utility Tree Risk Assessment - 46
BMP - Utility Tree Risk Assessment - 47
BMP - Utility Tree Risk Assessment - 48
BMP - Utility Tree Risk Assessment - 49
BMP - Utility Tree Risk Assessment - 50
BMP - Utility Tree Risk Assessment - 51
BMP - Utility Tree Risk Assessment - 52
BMP - Utility Tree Risk Assessment - 53
BMP - Utility Tree Risk Assessment - 54
BMP - Utility Tree Risk Assessment - 55
BMP - Utility Tree Risk Assessment - 56
BMP - Utility Tree Risk Assessment - 57
BMP - Utility Tree Risk Assessment - 58
BMP - Utility Tree Risk Assessment - 59
BMP - Utility Tree Risk Assessment - 60
BMP - Utility Tree Risk Assessment - 61
BMP - Utility Tree Risk Assessment - 62
BMP - Utility Tree Risk Assessment - 63
BMP - Utility Tree Risk Assessment - 64
BMP - Utility Tree Risk Assessment - 65
BMP - Utility Tree Risk Assessment - 66
BMP - Utility Tree Risk Assessment - 67
BMP - Utility Tree Risk Assessment - 68
BMP - Utility Tree Risk Assessment - 69
BMP - Utility Tree Risk Assessment - 70
BMP - Utility Tree Risk Assessment - 71
BMP - Utility Tree Risk Assessment - 72
BMP - Utility Tree Risk Assessment - 73
BMP - Utility Tree Risk Assessment - 74
BMP - Utility Tree Risk Assessment - 75
BMP - Utility Tree Risk Assessment - 76
BMP - Utility Tree Risk Assessment - 77
BMP - Utility Tree Risk Assessment - 78
BMP - Utility Tree Risk Assessment - 79
BMP - Utility Tree Risk Assessment - 80
BMP - Utility Tree Risk Assessment - 81
BMP - Utility Tree Risk Assessment - 82
BMP - Utility Tree Risk Assessment - 83
BMP - Utility Tree Risk Assessment - 84
BMP - Utility Tree Risk Assessment - 85
BMP - Utility Tree Risk Assessment - 86
BMP - Utility Tree Risk Assessment - 87
BMP - Utility Tree Risk Assessment - 88
BMP - Utility Tree Risk Assessment - 89
BMP - Utility Tree Risk Assessment - 90
BMP - Utility Tree Risk Assessment - 91
BMP - Utility Tree Risk Assessment - 92
BMP - Utility Tree Risk Assessment - 93
BMP - Utility Tree Risk Assessment - 94
BMP - Utility Tree Risk Assessment - 95
BMP - Utility Tree Risk Assessment - Cover4
https://www.nxtbookmedia.com