IEEE Electrification - December 2022 - 84

By Cheng Siong Chin , Anurag Sharma ,
Dhivya Sampath Kumar, and Sumith Madampath
Singapore's
Sustainable
Energy Story
Low-carbon energy deployment strategies and challenges.
B
EING A SMALL, RESOURCE-CONSTRAINED
country, Singapore has been dependent on
the import of energy products, such as coal,
petroleum, natural gas, etc., since its independence.
Specifically, it has relied on natural
gas, which is the cleanest form of fossil fuel, for several
years. In the past, the natural gas supply came from
the neighboring countries of Indonesia and
Malaysia through pipelines. However, the
construction of the Singapore Liquefied
Natural Gas Terminal in 2013
allowed Singapore to import and
store liquefied natural gas from
many different countries and
sources, thus broadening its
natural gas supply options.
A four-switch approach (see
Figure 1) was presented
with the aim of having a
future where energy is sustainable,
reliable, affordable,
and produced and consumed
efficiently. The four switches
mentioned are as follows:
x Natural gas: Currently,
almost 95% of the electricity is
: Currently,
almost 95% of the electricity is
Digital Object Identifier 10.1109/MELE.2022.3211109
Date of current version: 24 November 2022
84
generated using natural gas, and, in the near future, it
will continue to be a dominant fuel for Singapore as
other sources of energy are developed.
x Solar: With Singapore's commitment to climate
change mitigation, it would be a viable option for Singapore
to opt for renewable sources of energy as it
slowly reduces its dependence on natural gas for
electricity generation. Currently, solar energy
is considered one of the most feasible
renewable energy sources for
Singapore. Other renewable
energy sources, such as hydro
and wind energy sources,
are not readily available in
Singapore due to the lack
of sustainable sources
of water flow and high
wind speeds. Also, the
water surrounding Singapore
is constantly occupied
by anchorages and
shipping lanes, which
reduces the amount of
space available to deploy
tidal power generation. Hence,
with solar being the most promising
option, Singapore's current goal
is to generate at least 2 GW peak (GWp)
of solar energy by the year 2030.
IEEE Electrification Magazine / DECEMBER 2022
2325-5897/22©2022IEEE
©
S
H
U
T
T
E
R
S
T
O
C
K
.C
O
M
/P
E
R
B
E
N
G
T
S
S
O
N
https://orcid.org/0000-0001-5153-0675 https://orcid.org/0000-0002-0810-4432

IEEE Electrification - December 2022

Table of Contents for the Digital Edition of IEEE Electrification - December 2022

Contents
IEEE Electrification - December 2022 - Cover1
IEEE Electrification - December 2022 - Cover2
IEEE Electrification - December 2022 - Contents
IEEE Electrification - December 2022 - 2
IEEE Electrification - December 2022 - 3
IEEE Electrification - December 2022 - 4
IEEE Electrification - December 2022 - 5
IEEE Electrification - December 2022 - 6
IEEE Electrification - December 2022 - 7
IEEE Electrification - December 2022 - 8
IEEE Electrification - December 2022 - 9
IEEE Electrification - December 2022 - 10
IEEE Electrification - December 2022 - 11
IEEE Electrification - December 2022 - 12
IEEE Electrification - December 2022 - 13
IEEE Electrification - December 2022 - 14
IEEE Electrification - December 2022 - 15
IEEE Electrification - December 2022 - 16
IEEE Electrification - December 2022 - 17
IEEE Electrification - December 2022 - 18
IEEE Electrification - December 2022 - 19
IEEE Electrification - December 2022 - 20
IEEE Electrification - December 2022 - 21
IEEE Electrification - December 2022 - 22
IEEE Electrification - December 2022 - 23
IEEE Electrification - December 2022 - 24
IEEE Electrification - December 2022 - 25
IEEE Electrification - December 2022 - 26
IEEE Electrification - December 2022 - 27
IEEE Electrification - December 2022 - 28
IEEE Electrification - December 2022 - 29
IEEE Electrification - December 2022 - 30
IEEE Electrification - December 2022 - 31
IEEE Electrification - December 2022 - 32
IEEE Electrification - December 2022 - 33
IEEE Electrification - December 2022 - 34
IEEE Electrification - December 2022 - 35
IEEE Electrification - December 2022 - 36
IEEE Electrification - December 2022 - 37
IEEE Electrification - December 2022 - 38
IEEE Electrification - December 2022 - 39
IEEE Electrification - December 2022 - 40
IEEE Electrification - December 2022 - 41
IEEE Electrification - December 2022 - 42
IEEE Electrification - December 2022 - 43
IEEE Electrification - December 2022 - 44
IEEE Electrification - December 2022 - 45
IEEE Electrification - December 2022 - 46
IEEE Electrification - December 2022 - 47
IEEE Electrification - December 2022 - 48
IEEE Electrification - December 2022 - 49
IEEE Electrification - December 2022 - 50
IEEE Electrification - December 2022 - 51
IEEE Electrification - December 2022 - 52
IEEE Electrification - December 2022 - 53
IEEE Electrification - December 2022 - 54
IEEE Electrification - December 2022 - 55
IEEE Electrification - December 2022 - 56
IEEE Electrification - December 2022 - 57
IEEE Electrification - December 2022 - 58
IEEE Electrification - December 2022 - 59
IEEE Electrification - December 2022 - 60
IEEE Electrification - December 2022 - 61
IEEE Electrification - December 2022 - 62
IEEE Electrification - December 2022 - 63
IEEE Electrification - December 2022 - 64
IEEE Electrification - December 2022 - 65
IEEE Electrification - December 2022 - 66
IEEE Electrification - December 2022 - 67
IEEE Electrification - December 2022 - 68
IEEE Electrification - December 2022 - 69
IEEE Electrification - December 2022 - 70
IEEE Electrification - December 2022 - 71
IEEE Electrification - December 2022 - 72
IEEE Electrification - December 2022 - 73
IEEE Electrification - December 2022 - 74
IEEE Electrification - December 2022 - 75
IEEE Electrification - December 2022 - 76
IEEE Electrification - December 2022 - 77
IEEE Electrification - December 2022 - 78
IEEE Electrification - December 2022 - 79
IEEE Electrification - December 2022 - 80
IEEE Electrification - December 2022 - 81
IEEE Electrification - December 2022 - 82
IEEE Electrification - December 2022 - 83
IEEE Electrification - December 2022 - 84
IEEE Electrification - December 2022 - 85
IEEE Electrification - December 2022 - 86
IEEE Electrification - December 2022 - 87
IEEE Electrification - December 2022 - 88
IEEE Electrification - December 2022 - 89
IEEE Electrification - December 2022 - 90
IEEE Electrification - December 2022 - 91
IEEE Electrification - December 2022 - 92
IEEE Electrification - December 2022 - 93
IEEE Electrification - December 2022 - 94
IEEE Electrification - December 2022 - 95
IEEE Electrification - December 2022 - 96
IEEE Electrification - December 2022 - Cover3
IEEE Electrification - December 2022 - Cover4
https://www.nxtbook.com/nxtbooks/pes/electrification_december2022
https://www.nxtbook.com/nxtbooks/pes/electrification_september2022
https://www.nxtbook.com/nxtbooks/pes/electrification_june2022
https://www.nxtbook.com/nxtbooks/pes/electrification_march2022
https://www.nxtbook.com/nxtbooks/pes/electrification_december2021
https://www.nxtbook.com/nxtbooks/pes/electrification_september2021
https://www.nxtbook.com/nxtbooks/pes/electrification_june2021
https://www.nxtbook.com/nxtbooks/pes/electrification_march2021
https://www.nxtbook.com/nxtbooks/pes/electrification_december2020
https://www.nxtbook.com/nxtbooks/pes/electrification_september2020
https://www.nxtbook.com/nxtbooks/pes/electrification_june2020
https://www.nxtbook.com/nxtbooks/pes/electrification_march2020
https://www.nxtbook.com/nxtbooks/pes/electrification_december2019
https://www.nxtbook.com/nxtbooks/pes/electrification_september2019
https://www.nxtbook.com/nxtbooks/pes/electrification_june2019
https://www.nxtbook.com/nxtbooks/pes/electrification_march2019
https://www.nxtbook.com/nxtbooks/pes/electrification_december2018
https://www.nxtbook.com/nxtbooks/pes/electrification_september2018
https://www.nxtbook.com/nxtbooks/pes/electrification_june2018
https://www.nxtbook.com/nxtbooks/pes/electrification_december2017
https://www.nxtbook.com/nxtbooks/pes/electrification_september2017
https://www.nxtbook.com/nxtbooks/pes/electrification_march2018
https://www.nxtbook.com/nxtbooks/pes/electrification_june2017
https://www.nxtbook.com/nxtbooks/pes/electrification_march2017
https://www.nxtbook.com/nxtbooks/pes/electrification_june2016
https://www.nxtbook.com/nxtbooks/pes/electrification_december2016
https://www.nxtbook.com/nxtbooks/pes/electrification_september2016
https://www.nxtbook.com/nxtbooks/pes/electrification_december2015
https://www.nxtbook.com/nxtbooks/pes/electrification_march2016
https://www.nxtbook.com/nxtbooks/pes/electrification_march2015
https://www.nxtbook.com/nxtbooks/pes/electrification_june2015
https://www.nxtbook.com/nxtbooks/pes/electrification_september2015
https://www.nxtbook.com/nxtbooks/pes/electrification_march2014
https://www.nxtbook.com/nxtbooks/pes/electrification_june2014
https://www.nxtbook.com/nxtbooks/pes/electrification_september2014
https://www.nxtbook.com/nxtbooks/pes/electrification_december2014
https://www.nxtbook.com/nxtbooks/pes/electrification_december2013
https://www.nxtbook.com/nxtbooks/pes/electrification_september2013
https://www.nxtbookmedia.com