OPTIMISE AND EVALUATE THE DISPATCH OF YOUR SYSTEM WITH POWERFACTORY! UNIT COMMITMENT AND DISPATCH OPTIMISATION Time sweep optimisation Consideration of contingencies (n-k) Storage schedule optimisation Full consideration of network constraints, exchange flows and generation unit limitations such as ramp rates, up- and downtimes Support of contingency constraint optimisation and consideration of planned outages OPTIMAL POWER FLOW Linearised DC optimisation (including contingency constraint/optimisation) AC load flow optimisation with interior point method Active power and reactive power and voltage profile optimisation Various controls such as: Generator active and reactive power, transformer, quad booster and shunt taps, static var systems PowerFactory provides flexible results analysis and visualisation with dedicated reports, colouring modes and diagrams. For more information visit www.digsilent.de/powerfactory Serving more than 160 countries. POWER SYSTEM SOLUTIONS MADE IN GERMANYhttp://www.digsilent.de/powerfactory