OPTIMIZE YOUR GENERATION AND DISPATCH COSTS WITH POWERFACTORY! Unit Commitment, Redispatch Calculation and Market Simulation based on a full network Minimisation of operating, emission & startup costs of generating units, as well as costs for curtailment of renewables, load shedding and transformer switching Consideration of network constraints and generator limitations such as ramping, minimum up/down times Support of contingency constraint optimisation and consideration of planned outages Time sweep optimisation with powerful algorithm settings for performance improvement Storage schedule optimisation Flexible results analysis and visualisation with dedicated reports, colouring modes and diagrams Integrated optional interface to external solvers such as CPLEX, GUROBI or data exchange via AMPL-NL file format For more information visit www.digsilent.de/unit-commitment Serving more than 150 countries. POWER SYSTEM SOLUTIONS MADE IN GERMANYhttp://www.digsilent.de/unit-commitment