Like many manufactured products, multiple
processes and inspections are required to
make Metal Additive Manufactured (MAM)
parts. Not only are these different
operations necessary for the part to have
the desired geometry and properties, but
the order in which the different operations
are performed are equally important.
Having the correct order of operations in
MAM are important to:
* Ensure that the part can meet
requirements (geometry and
properties).
* Leave the part in the ideal condition for
subsequent operations.
* Minimize the cycle time and economic
loss if the part is discrepant.
This order of operations needs to be
considered during the design and analysis
of the part, as it can influence both of
these. Using a typical process flow with
Laser Powder Bed Fusion (L-PBF) and
Directed Energy Deposition (DED) as
examples, things that a product team
needs to consider are:
1. Build file and/or part serialization -
Optional step that happens during
build file setup to create serialized
parts for traceability. These can be
unique to the part or the build file.
While this is easy to do with MAM, it is
sometimes debated if creating unique
identifiers disqualifies the process as
fixed.
2. Intermediate Stress Relief -
UPDATE
Generally applicable to DED,
intermediate stress relief operations
may be necessary when parts are
large, complex, or made from alloys
that generate high residual stresses
(e.g., Ti-6Al-4V); or a combination of
the three. One reason is to prevent
the part from cracking due to the
residual stresses. Another is to avoid
distortion that can result in
misalignment of the tool path and the
location of the previous layer, which
would result in a pronounced stitch
line or lack of fusion. Cylindrical parts
like the one shown on page 14 will be
less susceptible than parts with flat
sections or small radii.
3. Part Cooldown - The energy put into
the part to fuse the feedstock
together generates heat in the part
and in the chamber or powder bed if
applicable. It has to be cooled down
before the parts can be handled.
4. Remove from Machine and DePowder
- Necessary first step after
build is completed.
5. Stress Relief - This is often required
prior to removing the part(s) from the
build plate (L-PBF) or clamping
fixture (DED). The primary reason is
to prevent residual stresses from
causing the parts to move during
removal, which can result in
undercutting or overcutting or
inconsistency in the part geometry
for subsequent operations.
September 2021
13

SAE Update - September 2021

Table of Contents for the Digital Edition of SAE Update - September 2021

SAE Update - September 2021 - Cov1
SAE Update - September 2021 - Cov2
SAE Update - September 2021 - 1
SAE Update - September 2021 - 2
SAE Update - September 2021 - 3
SAE Update - September 2021 - 4
SAE Update - September 2021 - 5
SAE Update - September 2021 - 6
SAE Update - September 2021 - 7
SAE Update - September 2021 - 8
SAE Update - September 2021 - 9
SAE Update - September 2021 - 10
SAE Update - September 2021 - 11
SAE Update - September 2021 - 12
SAE Update - September 2021 - 13
SAE Update - September 2021 - 14
SAE Update - September 2021 - 15
SAE Update - September 2021 - 16
SAE Update - September 2021 - 17
SAE Update - September 2021 - 18
SAE Update - September 2021 - 19
SAE Update - September 2021 - 20
SAE Update - September 2021 - 21
SAE Update - September 2021 - 22
SAE Update - September 2021 - 23
SAE Update - September 2021 - 24
SAE Update - September 2021 - 25
SAE Update - September 2021 - 26
SAE Update - September 2021 - 27
SAE Update - September 2021 - 28
SAE Update - September 2021 - 29
SAE Update - September 2021 - 30
SAE Update - September 2021 - 31
SAE Update - September 2021 - 32
SAE Update - September 2021 - 33
SAE Update - September 2021 - 34
SAE Update - September 2021 - 35
SAE Update - September 2021 - 36
SAE Update - September 2021 - 37
SAE Update - September 2021 - 38
https://www.nxtbook.com/smg/sae/24UPD08
https://www.nxtbook.com/smg/sae/24UPD07
https://www.nxtbook.com/smg/sae/24UPD06
https://www.nxtbook.com/smg/sae/24UPD05
https://www.nxtbook.com/smg/sae/24UPD04
https://www.nxtbook.com/smg/sae/24UPD03
https://www.nxtbook.com/smg/sae/24UPD02
https://www.nxtbook.com/smg/sae/24UPD01
https://www.nxtbook.com/smg/sae/23UPD12
https://www.nxtbook.com/smg/sae/23UPD11
https://www.nxtbook.com/smg/sae/23UPD10
https://www.nxtbook.com/smg/sae/23UPD09
https://www.nxtbook.com/smg/sae/23UPD08
https://www.nxtbook.com/smg/sae/23UPD07
https://www.nxtbook.com/smg/sae/23UPD06
https://www.nxtbook.com/smg/sae/23UPD05
https://www.nxtbook.com/smg/sae/23UPD04
https://www.nxtbook.com/smg/sae/23UPD03
https://www.nxtbook.com/smg/sae/23UPD02
https://www.nxtbook.com/smg/sae/23UPD01
https://www.nxtbook.com/smg/sae/22UPD12
https://www.nxtbook.com/smg/sae/22UPD11
https://www.nxtbook.com/smg/sae/22UPD10
https://www.nxtbook.com/smg/sae/22UPD09
https://www.nxtbook.com/smg/sae/22UPD08
https://www.nxtbook.com/smg/sae/22UPD07
https://www.nxtbook.com/smg/sae/22UPD06
https://www.nxtbook.com/smg/sae/22UPD05
https://www.nxtbook.com/smg/sae/22UPD04
https://www.nxtbook.com/smg/sae/22UPD03
https://www.nxtbook.com/smg/sae/22UPD02
https://www.nxtbook.com/smg/sae/22UPD01
https://www.nxtbook.com/smg/sae/21UPD12
https://www.nxtbook.com/smg/sae/21UPD11
https://www.nxtbook.com/smg/sae/21UPD10
https://www.nxtbook.com/smg/sae/21UPD09
https://www.nxtbook.com/smg/sae/21UPD08
https://www.nxtbook.com/smg/sae/21UPD07
https://www.nxtbook.com/smg/sae/21UPD06
https://www.nxtbook.com/smg/sae/21UPD05
https://www.nxtbook.com/smg/sae/21UPD04
https://www.nxtbook.com/smg/sae/21UPD03
https://www.nxtbook.com/smg/sae/21UPD02
https://www.nxtbookmedia.com